J-0200000-17 ELINs.xlsx
XLSX spreadsheet 397 KB Posted
- Solicitation number
- N6945025R0003
About this file
This file is an Excel-based Exhibit Line Item Numbers (ELIN) attachment for a Base Operations Support (BOS) Services contract with Naval Station Mayport and Marine Corps Support Facility - Blount Island, with Contract No. N6945025R0003. The document details a comprehensive multi-year contract covering recurring and non-recurring work across multiple service categories, including Port Operations, Facility Management, Facility Investment, Custodial Services, Pest Control, Utilities Management, Transportation, and Environmental Services.
The contract structure includes a base period and seven subsequent one-year option periods, with detailed line items for each period broken down by specific service locations and categories. Each period contains recurring work (CLIN) with line items ranging from emergency/urgent routine work to preventive maintenance, inspections, and specialized services like weight handling equipment maintenance, electrical systems management, and environmental monitoring. The non-recurring work sections include unit-priced labor, material and equipment provisions, and various categorized work calls ranging from small ($5,000) to larger ($20,000) scope projects, with specific response time requirements and service descriptions for each category.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Base Period RW
| Attachment J-0200000-17 | ||||||||||
| Exhibit Line Item Numbers - NAVSTA Mayport | ||||||||||
| Contract No.: N6945025R0003 | ||||||||||
| CLIN 0001 - Recurring Work - Base Period | ||||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||||
| ELINs A001 through A014 | ||||||||||
| Customer | Funding Source | Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Extended Price | |||||
| CNRSE | Port Ops | Port Operations | Port Ops Equipment Work Order | A001 | A001AA | 0600000 | 3.1 | Port Ops Equipment Work Order | 20 | EA |
| CNRSE | Port Ops | Port Operations | Recurring Work | A001 | A001AB | 0600000 | 3.2 | Ship Movements - Berthing and Hotel Services | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | A001 | A001AC | 1501000 | 3.1 | NAVFAC Maximo Data Entry | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | A001 | A001AD | 1501000 | 3.2 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | A001 | A001AE | 1501000 | 3.3 | Technical Library Operations | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | E/U/R Work Orders | A001 | A001AF | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 3658 | EA |
| CNRSE | CNRSE ST-FAC | Facility Investment | Recurring Work | A001 | A001AG | 1502000 | 3.2 | Project Work Orders | 50 | EA |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AH | 1502000 | 3.3.1 | Airfield Lighting Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AJ | 1502000 | 3.3.2 | Auxiliary Generator Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AK | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AL | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AM | 1502000 | 3.3.5 | Door and Gate Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AN | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AP | 1502000 | 3.3.7 | Frequency Converter (400 HZ) Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AQ | 1502000 | 3.3.8 | Galley Equipment and Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AR | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AS | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AT | 1502000 | 3.3.11 | Uninterruptible Power Supplies (UPS) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AU | 1502000 | 3.3.12 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AV | 1502000 | 3.3.13 | Facility-Mounted Weight Handling Equipment (WHE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001AW | 1502000 | 3.3.14 | Crane Trackage | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001AX | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001AY | 1502000 | 3.4.2 | Boilers and UPVs | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001AZ | 1502000 | 3.4.3 | Grounding Points | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001BA | 1502000 | 3.4.4 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001BB | 1502000 | 3.4.5 | Facility-Mounted Weight Handling Equipment (WHE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | A001 | A001BC | 1502000 | 3.4.6 | Crane Trackage | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BD | 1502000 | 3.5.1 & 3.5.7 | Boiler & HVAC Seasonal Startup and Shutdown | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BE | 1502000 | 3.5.2 | Boiler Systems Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BF | 1502000 | 3.5.4 | FRCS Maintenance and Monitoring | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BG | 1502000 | 3.5.5 | Fuel Storage Tanks and Berms | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BH | 1502000 | 3.5.6 | Grease and Grit Traps | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BJ | 1502000 | 3.5.8 | HVAC Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BK | 1502000 | 3.5.9 | HVAC Condenser Tube Inspections | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | A001 | A001BL | 1502000 | 3.5.11 | Spot Coolers | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other (Swimming Pools) | A001 | A001BM | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other (Swimming Pools) | A001 | A001BN | 1503040 | 3.2 | Preventive Maintenance (PM) Program | 12 | MO |
| CNRSE | CNRSE FX | Facility Investment | Other (Swimming Pools) | A001 | A001BP | 1503040 | 3.3 | Water Treatment | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Utility Operations Support | A001 | A001BQ | 1601000 | 3.1 | Utility Operations Support | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | A001 | A001BR | 1601000 | 3.2 | Utility Infrastructure Condition Assessment Program (UICAP) Support | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | A001 | A001BS | 1601000 | 3.3 | Operation and Management of Facility Related Control Systems (FRCS) | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | A001 | A001BT | 1601000 | 3.4 | NAVFAC Maximo Data Entry | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Recurring Work | A001 | A001BU | 1602000 | 3.1 | Operate Electrical Power Transmission and Distribution Systems | 12 | MO |
| CNRSE | CNRSE ST | Electrical | E/U/R Work Orders | A001 | A001BV | 1602000 | 3.2 | Emergency, Urgent and Routine (E/U/R) Work | 220 | EA |
| CNRSE | CNRSE ST | Electrical | Recurring Work | A001 | A001BW | 1602000 | 3.3 | Preventive Maintenance (PM) Program | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Other Recurring Services Program | A001 | A001BX | 1602000 | 3.4 | Other Recurring Services | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Other Recurring Services Program | A001 | A001BY | 1602000 | 3.5 | Utility Right of Way Clearance | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Operations | A001 | A001BZ | 1700000 | 3.1.1 | WHE/MHE/NTVE Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Operations | A001 | A001CA | 1700000 | 3.1.2 | Fuel Delivery Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Support Services | A001 | A001CB | 1700000 | 3.2.1 | Dispatching Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Support Services | A001 | A001CC | 1700000 | 3.2.2 | Non-Government Owned Leased Vehicles | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of NTVE | A001 | A001CD | 1700000 | 3.3.1.1 | New and Reassigned Vehicles and Equipment Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | A001 | A001CE | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | A001 | A001CF | 1700000 | 3.3.1.3 | Preventive Maintenance Inspection of NTVE | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | A001 | A001CG | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | A001 | A001CH | 1700000 | 3.3.1.5 | NTVE Trouble Calls | 150 | EA |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | A001 | A001CJ | 1700000 | 3.3.2 | BSVE Accessories Installation and Removal | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | A001 | A001CK | 1800000 | 3.1 | Oil and Regulated Substance Spill Response and Cleanup Ashore | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | A001 | A001CL | 1800000 | 3.2 | Used Oil Management Services | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | A001 | A001CM | 1800000 | 3.3 | Storm Water Monitoring | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | E/U/R Work Orders | A001 | A001CN | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 1350 | EA |
| CNRSE | CNRSE ST-UH | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001CP | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001CQ | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001CR | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Inspection, Testing, and Certification | A001 | A001CS | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Inspection, Testing, and Certification | A001 | A001CT | 1502000 | 3.4.2 | Boilers and UPVs | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CU | 1502000 | 3.5.1 & 3.5.7 | Boiler & HVAC Seasonal Startup and Shutdown | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CV | 1502000 | 3.5.2 | Boiler Systems Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CW | 1502000 | 3.5.8 | HVAC Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CX | 1502000 | 3.5.9 | HVAC Condenser Tube Inspections | 12 | MO |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CY | 1502000 | 3.5.3 | Change of Occupancy Maintenance (COM) | 50 | EA |
| CNRSE | CNRSE ST-UH | Facility Investment | Other Recurring Services Program | A001 | A001CZ | 1502000 | 3.5.10 | Lint Traps | 12 | MO |
| CNRSE | Family Housing | Facility Invetment | Preventive Maintenance (PM) Program | A001 | A001DA | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| CNRSE | Family Housing | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001DB | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| CNRSE | CNRSE ST-UTL | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001DC | 1502000 | 3.3.5 | Door and Gate Systems | 12 | MO |
| CNRSE | CNRSE ST-UTL | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001DD | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| CNRSE | CNRSE ST-UTL | Facility Investment | Preventive Maintenance (PM) Program | A001 | A001DE | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| CNRSE | CNRSE ST-UTL | Facility Investment | Inspection, Testing, and Certification | A001 | A001DF | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| FRC VRT | FRC VRT | Transportation | Maintenance (Government Owned) | A002 | A002AA | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| FRC VRT | FRC VRT | Transportation | Maintenance (Government Owned) | A002 | A002AB | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| FRC VRT | FRC VRT | Environmental | Recurring Work | A002 | A002AC | 1800000 | 3.2 | Used Oil Management Services | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Management | Recurring Work | A003 | A003AA | 1501000(MCSF-BI) | 3.1,3.2,3.3 | USMC Maximo, ICAP and Tech Library | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | E/U/R Work Orders | A003 | A003AB | 1502000(MCSF-BI) | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 750 | EA |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Recurring Work | A003 | A003AC | 1502000(MCSF-BI) | 3.2 | Urgent and Routine Project Work Orders | 48 | EA |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AD | 1502000(MCSF-BI) | 3.3.1 | Auxiliary Generator Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AE | 1502000(MCSF-BI) | 3.3.2 | Cathodic Protection | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AF | 1502000(MCSF-BI) | 3.3.3 | Compressed Air Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AG | 1502000(MCSF-BI) | 3.3.4 | Facilities, Systems, and Equipment | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AH | 1502000(MCSF-BI) | 3.3.5 | Fire Protection Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AJ | 1502000(MCSF-BI) | 3.3.6 | Irrigation Equipment and Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AK | 1502000(MCSF-BI) | 3.3.7 | Unfired Pressure Vessels (UPVs) | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Preventive Maintenance (PM) Program | A003 | A003AL | 1502000(MCSF-BI) | 3.3.8 | Vertical Transportation Equipment (VTE) | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Integrated Maintenance Program (IMP) | A003 | A003AM | 1502000(MCSF-BI) | 3.4.1 | Blast, Paint, and Drying Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Integrated Maintenance Program (IMP) | A003 | A003AN | 1502000(MCSF-BI) | 3.4.2 | Boiler Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Integrated Maintenance Program (IMP) | A003 | A003AP | 1502000(MCSF-BI) | 3.4.3 | HVAC and Refrigeration Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Integrated Maintenance Program (IMP) | A003 | A003AQ | 1502000(MCSF-BI) | 3.4.4 | Railroad Signal and Battery House Systems and Equipment | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Integrated Maintenance Program (IMP) | A003 | A003AR | 1502000(MCSF-BI) | 3.4.5 | Crane and Railroad Trackage | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Inspection, Testing, and Certification | A003 | A003AS | 1502000(MCSF-BI) | 3.5.1 | Backflow Prevention Devices | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Inspection, Testing, and Certification | A003 | A003AT | 1502000(MCSF-BI) | 3.5.2 | Boilers and UPVs | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Inspection, Testing, and Certification | A003 | A003AU | 1502000(MCSF-BI) | 3.5.3 | Crane and Railroad Trackage | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Inspection, Testing, and Certification | A003 | A003AV | 1502000(MCSF-BI) | 3.5.4 | Rolling, Sliding, and Overhead Fire Doors | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Inspection, Testing, and Certification | A003 | A003AW | 1502000(MCSF-BI) | 3.5.5 | Vertical Transportation Equipment (VTE) | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003AX | 1502000(MCSF-BI) | 3.6.1 | Lighting Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003AY | 1502000(MCSF-BI) | 3.6.2 | Corrosion Control | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003AZ | 1502000(MCSF-BI) | 3.6.3 | Roof Maintenance | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BA | 1502000(MCSF-BI) | 3.6.4 | Lift Station Maintenance | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BB | 1502000(MCSF-BI) | 3.6.5 | Provide and Service Portable Toilets | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BC | 1502000(MCSF-BI) | 3.6.6 | Pump and Clean Sewage Holding Tanks | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BD | 1502000(MCSF-BI) | 3.6.7 | Oil Water Separators and Oily Water Collection Points | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BE | 1502000(MCSF-BI) | 3.6.8 | Locksmith and Key Control Custodian | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BF | 1502000(MCSF-BI) | 3.6.9 | Direct Digital Control (DDC) Systems Maintenance, Repairs and Monitoring | 12 | MO |
| MCSF-BI | MCSF-BI | Facility Investment - MCSF-BI | Other Recurring Services Program | A003 | A003BG | 1502000(MCSF-BI) | 3.6.10 | Fuel Storage Tanks and Berms | 12 | MO |
| MCSF-BI | MCSF-BI | Custodial - MCSF-BI | Recurring Work | A003 | A003BH | 1503010(MCSF-BI) | 3.1 | Scheduled Services | 12 | MO |
| MCSF-BI | MCSF-BI | Custodial - MCSF-BI | Recurring Work | A003 | A003BJ | 1503010(MCSF-BI) | 3.2 | Custodial Service Orders | 12 | EA |
| MCSF-BI | MCSF-BI | Pest Control - MCSF-BI | Recurring Work | A003 | A003BK | 1503020(MCSF-BI) | 3.1 | Scheduled Pest Control Services | 12 | MO |
| MCSF-BI | MCSF-BI | Pest Control - MCSF-BI | Recurring Work | A003 | A003BL | 1503020(MCSF-BI) | 3.2 | Pest Control Service Orders | 100 | EA |
| MCSF-BI | MCSF-BI | Pest Control - MCSF-BI | Recurring Work | A003 | A003BM | 1503020(MCSF-BI) | 3.3 | Pest Management Reporting | 12 | MO |
| MCSF-BI | MCSF-BI | Integrated Solid Waste Management - MCSF-BI | Recurring Work | A003 | A003BN | 1503030(MCSF-BI) | 3 | Recurring Work ISWM | 12 | MO |
| MCSF-BI | MCSF-BI | Grounds Maintenance and Landscaping - MCSF-BI | Recurring Work | A003 | A003BP | 1503050(MCSF-BI) | 3.1 | Improved Grounds | 12 | MO |
| MCSF-BI | MCSF-BI | Grounds Maintenance and Landscaping - MCSF-BI | Recurring Work | A003 | A003BQ | 1503050(MCSF-BI) | 3.2 | Operational Areas | 12 | MO |
| MCSF-BI | MCSF-BI | Grounds Maintenance and Landscaping - MCSF-BI | Recurring Work | A003 | A003BR | 1503050(MCSF-BI) | 3.3 | Storm Drainage Systems | 12 | MO |
| MCSF-BI | MCSF-BI | Grounds Maintenance and Landscaping - MCSF-BI | Recurring Work | A003 | A003BS | 1503050(MCSF-BI) | 3.4 | Street Sweeping | 12 | MO |
| MCSF-BI | MCSF-BI | Grounds Maintenance and Landscaping - MCSF-BI | Recurring Work | A003 | A003BT | 1503050(MCSF-BI) | 3.5 | Grounds Maintenance Service Orders | 12 | EA |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BU | 1800000(MCSF-BI) | 3.1 | Sampling, Field Testing and Laboratory Services | 12 | MO |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BV | 1800000(MCSF-BI) | 3.2 | Used Oil Management Services | 12 | MO |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BW | 1800000(MCSF-BI) | 3.3 | Hazardous Material and Hazardous Waste, and Other Regulated Waste (HM/HW/ORW) Management | 12 | MO |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BX | 1800000(MCSF-BI) | 3.4 | Oil and Hazardous Substance Spill Response and Cleanup Ashore | 12 | MO |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BY | 1800000(MCSF-BI) | 3.5 | Storm Water Monitoring | 12 | MO |
| MCSF-BI | MCSF-BI | Environmental - MCSF-BI | Recurring Work | A003 | A003BZ | 1800000(MCSF-BI) | 3.6 | Inspection of POL Tanks and Systems | 12 | MO |
| NCIS | NCIS | Facility Investment | Preventive Maintenance (PM) Program | A004 | A004AA | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| FLCJ | FLCJ | Facility Investment | E/U/R Work Orders | A005 | A005AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 50 | EA |
| FLCJ | FLCJ | Facility Investment | Recurring Work | A005 | A005AB | 1502000 | 3.2 | Project Work Orders | 10 | EA |
| FLCJ | FLCJ | Transportation | Maintenance (Government Owned) | A005 | A005AC | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| FLCJ | FLCJ | Transportation | Maintenance (Government Owned) | A005 | A005AD | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| SERMC | SERMC | Facility Investment | E/U/R Work Orders | A006 | A006AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 200 | EA |
| SERMC | SERMC | Facility Investment | Recurring Work | A006 | A006AB | 1502000 | 3.2 | Project Work Orders | 10 | EA |
| SERMC | SERMC | Facility Investment | Preventive Maintenance (PM) Program | A006 | A006AC | 1502000 | 3.3.5 | Door and Gate Systems | 12 | MO |
| SERMC | SERMC | Facility Investment | Preventive Maintenance (PM) Program | A006 | A006AD | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| SERMC | SERMC | Facility Investment | Preventive Maintenance (PM) Program | A006 | A006AE | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| SERMC | SERMC | Facility Investment | Preventive Maintenance (PM) Program | A006 | A006AF | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| SERMC | SERMC | Transportation | Maintenance (Government Owned) | A006 | A006AG | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| SERMC | SERMC | Transportation | Maintenance (Government Owned) | A006 | A006AH | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| SERMC | SERMC | Facility Investment | E/U/R Work Orders | A006 | A006AJ | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 120 | EA |
| SERMC | SERMC | Facility Investment | Preventive Maintenance (PM) Program | A006 | A006AK | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO |
| SERMC | SERMC | Facility Investment | Inspection, Testing, and Certification | A006 | A006AL | 1502000 | 3.4.2 | Boilers and UPVs | 12 | MO |
| NAVSOUTH | NAVSOUTH | Facility Investment | E/U/R Work Orders | A007 | A007AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 30 | EA |
| NAVSOUTH | NAVSOUTH | Facility Investment | Preventive Maintenance (PM) Program | A007 | A007AB | 1502000 | 3.3.2 | Auxiliary Generator Systems | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | E/U/R Work Orders | A008 | A008AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 75 | EA |
| PMS 525 | PMS 525 | Facility Investment | Recurring Work | A008 | A008AB | 1502000 | 3.2 | Project Work Orders | 10 | EA |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AC | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AD | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AE | 1502000 | 3.3.5 | Door and Gate Systems | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AF | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AG | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Preventive Maintenance (PM) Program | A008 | A008AH | 1502000 | 3.3.11 | Uninterruptible Power Supplies (UPS) | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Inspection, Testing, and Certification | A008 | A008AJ | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Inspection, Testing, and Certification | A008 | A008AK | 1502000 | 3.4.2 | Boilers and UPVs | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Other Recurring Services Program | A008 | A008AL | 1502000 | 3.5.2 | Boiler Systems Water Testing and Treatment Services | 12 | MO |
| PMS 525 | PMS 525 | Facility Investment | Other Recurring Services Program | A008 | A008AM | 1502000 | 3.5.8 | HVAC Water Testing and Treatment Services | 12 | MO |
| B2517 NSWC PHD | B2517 NSWC PHD | Facility Investment | E/U/R Work Orders | A009 | A009AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 12 | EA |
| B2517 NSWC PHD | B2517 NSWC PHD | Transportation | Maintenance (Government Owned) | A009 | A009AB | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| B2517 NSWC PHD | B2517 NSWC PHD | Transportation | Maintenance (Government Owned) | A009 | A009AC | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| B2517 NSWC PHD | B2517 NSWC PHD | Transportation | Maintenance (Government Owned) | A009 | A009AD | 1700000 | 3.3.1.5 | NTVE Trouble Calls | 3 | EA |
| EOD DET Mayport | EOD DET Mayport | Transportation | Maintenance (Government Owned) | A010 | A010AA | 1700000 | 3.3.1.3 | Preventive Maintenance Inspection of NTVE | 12 | MO |
| EOD DET Mayport | EOD DET Mayport | Transportation | Maintenance (Government Owned) | A010 | A010AB | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | E/U/R Work Orders | A011 | A011AA | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 17 | EA |
| Navy Lodge | Navy Lodge | Facility Investment | Preventive Maintenance (PM) Program | A011 | A011AB | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | Preventive Maintenance (PM) Program | A011 | A011AC | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | Preventive Maintenance (PM) Program | A011 | A011AD | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | Preventive Maintenance (PM) Program | A011 | A011AE | 1502000 | 3.3.12 | Vertical Transportation Equipment (VTE) | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | Inspection, Testing, and Certification | A011 | A011AF | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| Navy Lodge | Navy Lodge | Facility Investment | Inspection, Testing, and Certification | A011 | A011AG | 1502000 | 3.4.4 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NEX | NEX | Facility Investment | Preventive Maintenance (PM) Program | A012 | A012AA | 1502000 | 3.3.2 | Auxiliary Generator Systems | 12 | MO |
| NEX | NEX | Facility Investment | Preventive Maintenance (PM) Program | A012 | A012AB | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| NEX | NEX | Facility Investment | Preventive Maintenance (PM) Program | A012 | A012AC | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| NEX | NEX | Facility Investment | Other Recurring Services Program | A012 | A012AD | 1502000 | 3.5.5 | Fuel Storage Tanks and Berms | 12 | MO |
| NGIS | NGIS | Facility Investment | Preventive Maintenance (PM) Program | A013 | A013AA | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| NGIS | NGIS | Facility Investment | Preventive Maintenance (PM) Program | A013 | A013AB | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| NGIS | NGIS | Facility Investment | Preventive Maintenance (PM) Program | A013 | A013AC | 1502000 | 3.3.12 | Vertical Transportation Equipment (VTE) | 12 | MO |
| NGIS | NGIS | Facility Investment | Inspection, Testing, and Certification | A013 | A013AD | 1502000 | 3.4.4 | Vertical Transportation Equipment (VTE) | 12 | MO |
| B2505 USFFC | B2505 USFFC | Facility Investment | Preventive Maintenance (PM) Program | A014 | A014AA | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| B2505 USFFC | B2505 USFFC | Facility Investment | Preventive Maintenance (PM) Program | A014 | A014AB | 1502000 | 3.3.2 | Auxiliary Generator Systems | 12 | MO |
| B2505 USFFC | B2505 USFFC | Facility Investment | Preventive Maintenance (PM) Program | A014 | A014AC | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| B2505 USFFC | B2505 USFFC | Facility Investment | Other Recurring Services Program | A014 | A014AD | 1502000 | 3.5.5 | Fuel Storage Tanks and Berms | 12 | MO |
| B2505 USFFC | B2505 USFFC | Facility Investment | Preventive Maintenance (PM) Program | A014 | A014AE | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| Total Recurring Work: |
CLIN 0002 Base Period N-RW
| Attachment J-0200000-17 |
| Exhibit Line Item Numbers - NAVSTA Mayport |
| Contract No.: N6945025R0003 |
| CLIN 0002 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELINs A700 through A718 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour and Universal Equipment.
Task order completion times will be specified on each task order.
For self-performed work: the unit price proposed for Sub-ELIN A700AA will be used to determine the labor cost to the Governent.
For subcontracted labor: the FBR proposed for Sub-ELIN A700AB will be used to determine the labor cost to the Governmnet.
| The estimated quantity of each Sub-ELIN is used to establish the ELIN Extended Price. During administration the labor Sub-ELINs may be used in any combination and quantity provided the ELIN extended price is not exceeded. The contract will not be modified to re-allocate capacity among labor SLINs. | 0 | DO | 1 |
| A700AA | Self-Performed Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall self-perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour and Universal Equipment.
| 16,000 | LH | |
| A700AB | Subcontractor Labor (Fixed Burden Rate) - MUST BE NEGOTIATED BY KO. | The Contractor shall perform management and oversight of subcontracted non-recurring work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Management and Administration, Specification Item 2.15.2.1.2 Subcontractor Requirements description of Sub.
Refer to: Section J, Annex 0200000 Management and Administration, Attachment J-0200000-01 Definitions and Acronyms for definition of Sub-Contractor Fixed Burden Rate.
The estimated quantity (in dollars) is provided. A Fixed Burdened Rate (FBR) shall be entered in the Unit Price column. The FBR shall include all direct and indirect factors for management and oversight of subcontracted non-recurring work. Similar to FBR example in J-0200000-01, if a 15% markup is the Contractor's proposed FBR, the Unit Price should be $1.15. During performance, if the lowest subcontractor labor proposal is $1,000.00 and the FBR is $1.15, the labor cost to the Government will be $1,150.00. (DO - Dollars).
| 1,600,000 | DO | |
| A701 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A Fixed burdened rate (FBR) shall be entered in the Unit Price column. The FBR shall include factors for ordering, handling, and stockpiling materials and repair parts. Similar to FBR example in J-0200000-01, if a 10% markup is the Contractor's proposed FBR, the Unit Price should be $1.10. When multiplying the proposed Unit Price by the Estimated Quantity, the Extended Price should be During administration, if the vendor's invoice on material is $1,000.00 and the unit price is $1.10, the cost of the material to the government will be $1,050.00. (DO - Dollars) | $ 2,000,000.00 | DO | |
| A702 | Category I Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category I Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category I Calls shall be completed within two weeks of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category I Call, the Contractor has full responsibility for any work identified up to the Category I Call Threshold of $5,000 in direct labor and direct material, per Category I Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 115 | EA | |
| A703 | Category II Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category II Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category II Calls shall be completed within three weeks of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category II Call, the Contractor has full responsibility for any work identified up to the Category II Call Threshold of $7,500 in direct labor and direct material, per Category II Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 130 | EA | |
| A704 | Category III Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category III Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category III Calls shall be completed within 30 days of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category III Call, the Contractor has full responsibility for any work identified up to the Category III Call Threshold of $10,000 in direct labor and direct material, per Category III Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 95 | EA | |
| A705 | Category IV Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category IV Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category IV Calls shall be completed within 30 days of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category IV Call, the Contractor has full responsibility for any work identified up to the Category IV Call Threshold of $12,500 in direct labor and direct material, per Category IV Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 50 | EA | |
| A706 | Category V Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category V Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category V Calls shall be completed within 30 days of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category V Call, the Contractor has full responsibility for any work identified up to the Category V Call Threshold of $15,000 in direct labor and direct material, per Category V Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 40 | EA | |
| A707 | Category VI Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category VI Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category VI Calls shall be completed within 30 days of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category VI Call, the Contractor has full responsibility for any work identified up to the Category VI Call Threshold of $17,500 in direct labor and direct material, per Category VI Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 30 | EA | |
| A708 | Category VII Calls - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Category VII Calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work. |
Category VII Calls shall be completed within 30 days of receipt of call order, unless otherwise agreed to by the customer and contractor and annotated on the CAT call request.
As part of the Category VII Call, the Contractor has full responsibility for any work identified up to the Category VII Call Threshold of $20,000 in direct labor and direct material, per Category VII Call.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Category Calls. | 20 | EA |
| A709 | Water Damage Removal |
available on FEDMALL The Contractor shall carefully remove and dispose of damaged interior finishes to include drywall, carpeting, etc. to prevent further damage or mold/mildew development in the event of water intrusion into a facility. In addition to the removal of the interior finishes, the Contractor shall dry the effected areas by providing dehumidifaction and airflow to remove any moisture from the space.
Work shall begin within 12 hours of notification.
| Task order completion times will be specified on each task order. | 20,000 | SF |
| A710 | Temporary Roof Repairs |
available on FEDMALL The Contractor shall provide all labor, material, and equipment to perform temporary roof repairs (i.e. tarping, roof patches, polyethylene film, etc.) to minimize water intrusion into a facility. Roof repairs shall be sufficient to last for a period no less than six months before requiring replacement or further repair.Within six months from the date of the original installation, the Contractor shall provide repairs and maintenance of the temporary repair at no additional cost to the Government.
Work shall begin within 12 hours of notification.
| Task order completion times will be specified on each task order. | 30,000 | SF |
| A711 | Temporary HVAC 100 ton Chiller |
available on FEDMALL Includes monthly rental rate, delivery, set-up, periodic monitoring, and demobilization, as well as ancillary components necessary to operate (such as but not limited to: hoses, flanges, fittings, transformers, power cables, temporary ducting, etc.). Work shall be delivered within 12 hours of receipt of order.
| Work shall be delivered within 12 hours of receipt of order. | 18 | MO |
| A712 | Temporary HVAC 40 ton package unit | |
| available on FEDMALL | Includes monthly rental rate, delivery, set-up, periodic monitoring, and demobilization, as well as ancillary components necessary to operate (such as but not limited to: hoses, flanges, fittings, transformers, power cables, temporary ducting, etc.). Work shall be delivered within 12 hours of receipt of order. |
| Work shall be delivered within 12 hours of receipt of order. | 18 | MO |
| A713 | Refrigerant Recovery |
available on FEDMALL The Contractor shall recover refrigerant from refrigerators in accordance with Section C, Annex 0200000, Spec Item 2.10.2.1
| Work shall be completed within five days of receipt of order. | 6 | EA |
| A714 | Unscheduled Bus/Van Service |
| available on FEDMALL | The Contractor shall provide unscheduled bus and van services normally during Government regular working hours but also during weekends or holidays. Services are frequently required after Government regular working hours. Task orders will be provided to the Contractor at least 24 hours in advance, except for emergency of the required services, and will specify the estimated number of dispatch hours and passengers, required departure time and location, destination, and estimated departure time from destination for return trip. BSVE shall leave specified locations on time or no later than 30 minutes after the specified departure time. | 100 | HR |
| A715 | Unscheduled Emergency Interstate Operator Service |
available on FEDMALL The Contractor shall provide qualified operator service to unscheduled BSVE interstate operations in support of emergency disaster operations. This service may be required during Government regular working hours but also during weekends or holidays. In addition, emergency services may be required after Government regular working hours.
Task orders will be provided to the Contractor six hours in advance during working hours or 12 hours in advance during non-working hours for required specified emergency services. Operator services may be cancelled at the discretion of the KO.
| Work shall be completed within time specified on the task order. | 5 | EA |
| A716 | Unscheduled Trucking Service |
available on FEDMALL The Contractor shall provide light, medium, and heavy duty trucking service up to 10,000 pounds GVW and above. This service shall include semi-trailers, tractors and full trailers, trucks with dolly converters and straight trucks. Cargo loads may be oversized and can include construction equipment, parts or pieces of equipment and others miscellaneous equipment.
The Contractor shall obtain all necessary license and permits required by the states to travel public highways.
| Work shall be completed within time specified on the task order. | 50 | EA |
| A717 | Unscheduled Oily wastewater / rainwater Removal and Disposal |
available on FEDMALL The Contractor shall remove oily wastewater/rainwater from all drydock and/or dry storage watercraft as well as tactic/non tactical vehicles and equipment to ensure waste is properly collected for disposal (up to 4000 gal each service). All oily wastewater is transported to an off-site properly certified oily wastewater treatment facility immediately after removal for processing.
The Contractor shall submit a report to the contracting Officer within 2 days after each service.
| Work shall begin within 12 hours of notification. | 30 | EA |
| A718 | Blount Island Shoreline Cleanup |
available on FEDMALL The Contractor shall perfrome shore cleanup, following the MCSF-BI Integrated Natural Resources Management Plan (INRMP). The shoreline clean up covers approximately 5 acres, and includes removal of debris, separation of recycling and not recycling materials, and proper disposal of the removed materials.
The Contractor shall submit a report to the contracting Officer within 2 days after each service.
| Work shall begin within 12 hours of notification. | 2 | EA |
| Total Non-recurring Work - Base Period: |
CLIN 0003 Base Water RW
| Attachment J-0200000-17 |
| Exhibit Line Item Numbers - NAVSTA Mayport |
| Contract No.: N6945025R0003 |
| CLIN 0003 - UT Recurring Work - Base Period | |||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN A015 | |||||||||
| Customer/ Program | Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Extended Price | ||||
| CNRSE UT | Water | Recurring Services | A015 | A015AA | 1606000 | 3.1 | Operation | 12 | MO |
| CNRSE ST | Water | E/U/R Work Orders | A015 | A015AC | 1606000 | 3.2.2 | E/U/R Work Orders | 80 | EA |
| CNRSE ST | Water | Recurring Services | A015 | A015AE | 1606000 | 3.3 | Preventive Maintenance (PM) | 12 | MO |
| CNRSE UT | Water | Recurring Services | A015 | A015AF | 1606000 | 3.4 | Inspection, Testing, and Certification of Fire Hydrants | 12 | MO |
CLIN 0004 1st Period Opt RW
| Attachment J-0200000-17 | ||||||||||
| Exhibit Line Item Numbers - NAVSTA Mayport | ||||||||||
| Contract No.: N6945025R0003 | ||||||||||
| CLIN 0004 - Recurring Work - First Option Period | ||||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||||
| ELINs B001 through B014 | ||||||||||
| Customer | Funding Source | Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Extended Price | |||||
| CNRSE | Port Ops | Port Operations | Port Ops Equipment Work Order | B001 | B001AA | 0600000 | 3.1 | Port Ops Equipment Work Order | 20 | EA |
| CNRSE | Port Ops | Port Operations | Recurring Work | B001 | B001AB | 0600000 | 3.2 | Ship Movements - Berthing and Hotel Services | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | B001 | B001AC | 1501000 | 3.1 | NAVFAC Maximo Data Entry | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | B001 | B001AD | 1501000 | 3.2 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO |
| CNRSE | CNRSE FP | Facility Management | Recurring Work | B001 | B001AE | 1501000 | 3.3 | Technical Library Operations | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | E/U/R Work Orders | B001 | B001AF | 1502000 | 3.1 | Emergency, Urgent and Routine (E/U/R) Work | 3658 | EA |
| CNRSE | CNRSE ST-FAC | Facility Investment | Recurring Work | B001 | B001AG | 1502000 | 3.2 | Project Work Orders | 50 | EA |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AH | 1502000 | 3.3.1 | Airfield Lighting Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AJ | 1502000 | 3.3.2 | Auxiliary Generator Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AK | 1502000 | 3.3.3 | Boiler and Unfired Pressure Vessel (UPV) Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AL | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AM | 1502000 | 3.3.5 | Door and Gate Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AN | 1502000 | 3.3.6 | Fire Protection Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AP | 1502000 | 3.3.7 | Frequency Converter (400 HZ) Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AQ | 1502000 | 3.3.8 | Galley Equipment and Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AR | 1502000 | 3.3.9 | HVAC and Refrigeration Systems | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AS | 1502000 | 3.3.10 | Security Systems and Equipment | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AT | 1502000 | 3.3.11 | Uninterruptible Power Supplies (UPS) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AU | 1502000 | 3.3.12 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AV | 1502000 | 3.3.13 | Facility-Mounted Weight Handling Equipment (WHE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Preventive Maintenance (PM) Program | B001 | B001AW | 1502000 | 3.3.14 | Crane Trackage | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001AX | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001AY | 1502000 | 3.4.2 | Boilers and UPVs | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001AZ | 1502000 | 3.4.3 | Grounding Points | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001BA | 1502000 | 3.4.4 | Vertical Transportation Equipment (VTE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001BB | 1502000 | 3.4.5 | Facility-Mounted Weight Handling Equipment (WHE) | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Inspection, Testing, and Certification | B001 | B001BC | 1502000 | 3.4.6 | Crane Trackage | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BD | 1502000 | 3.5.1 & 3.5.7 | Boiler & HVAC Seasonal Startup and Shutdown | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BE | 1502000 | 3.5.2 | Boiler Systems Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BF | 1502000 | 3.5.4 | FRCS Maintenance and Monitoring | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BG | 1502000 | 3.5.5 | Fuel Storage Tanks and Berms | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BH | 1502000 | 3.5.6 | Grease and Grit Traps | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BJ | 1502000 | 3.5.8 | HVAC Water Testing and Treatment Services | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BK | 1502000 | 3.5.9 | HVAC Condenser Tube Inspections | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other Recurring Services Program | B001 | B001BL | 1502000 | 3.5.11 | Spot Coolers | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other (Swimming Pools) | B001 | B001BM | 1503040 | 3.1 | Pool Operator Maintenance | 12 | MO |
| CNRSE | CNRSE ST-FAC | Facility Investment | Other (Swimming Pools) | B001 | B001BN | 1503040 | 3.2 | Preventive Maintenance (PM) Program | 12 | MO |
| CNRSE | CNRSE FX | Facility Investment | Other (Swimming Pools) | B001 | B001BP | 1503040 | 3.3 | Water Treatment | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Utility Operations Support | B001 | B001BQ | 1601000 | 3.1 | Utility Operations Support | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | B001 | B001BR | 1601000 | 3.2 | Utility Infrastructure Condition Assessment Program (UICAP) Support | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | B001 | B001BS | 1601000 | 3.3 | Operation and Management of Facility Related Control Systems (FRCS) | 12 | MO |
| CNRSE | CNRSE UT | Utilities Management | Recurring Work | B001 | B001BT | 1601000 | 3.4 | NAVFAC Maximo Data Entry | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Recurring Work | B001 | B001BU | 1602000 | 3.1 | Operate Electrical Power Transmission and Distribution Systems | 12 | MO |
| CNRSE | CNRSE ST | Electrical | E/U/R Work Orders | B001 | B001BV | 1602000 | 3.2 | Emergency, Urgent and Routine (E/U/R) Work | 220 | EA |
| CNRSE | CNRSE ST | Electrical | Recurring Work | B001 | B001BW | 1602000 | 3.3 | Preventive Maintenance (PM) Program | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Other Recurring Services Program | B001 | B001BX | 1602000 | 3.4 | Other Recurring Services | 12 | MO |
| CNRSE | CNRSE UT | Electrical | Other Recurring Services Program | B001 | B001BY | 1602000 | 3.5 | Utility Right of Way Clearance | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Operations | B001 | B001BZ | 1700000 | 3.1.1 | WHE/MHE/NTVE Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Operations | B001 | B001CA | 1700000 | 3.1.2 | Fuel Delivery Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Support Services | B001 | B001CB | 1700000 | 3.2.1 | Dispatching Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Support Services | B001 | B001CC | 1700000 | 3.2.2 | Non-Government Owned Leased Vehicles | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of NTVE | B001 | B001CD | 1700000 | 3.3.1.1 | New and Reassigned Vehicles and Equipment Services | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | B001 | B001CE | 1700000 | 3.3.1.2 | Preventive Maintenance, Inspection, Load Test and Certification of WHE, MHE and AWP | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | B001 | B001CF | 1700000 | 3.3.1.3 | Preventive Maintenance Inspection of NTVE | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | B001 | B001CG | 1700000 | 3.3.1.4 | Repair (NTVE, WHE, MHE and AWP) | 12 | MO |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | B001 | B001CH | 1700000 | 3.3.1.5 | NTVE Trouble Calls | 150 | EA |
| CNRSE | CNRSE TR | Transportation | Maintenance of CESE | B001 | B001CJ | 1700000 | 3.3.2 | BSVE Accessories Installation and Removal | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | B001 | B001CK | 1800000 | 3.1 | Oil and Regulated Substance Spill Response and Cleanup Ashore | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | B001 | B001CL | 1800000 | 3.2 | Used Oil Management Services | 12 | MO |
| CNRSE | CNRSE EC | Environmental | Recurring Work | B001 | B001CM | 1800000 | 3.3 | Storm Water Monitoring | 12 | MO |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .