This file is a detailed Service Provider Information attachment (J-0200000-09) for a NAVFAC MAXIMO work order interface, version 3, current as of December 3, 2015. The document provides a comprehensive field-level specification for service providers to submit work order data, including 42 specific data fields with precise formatting requirements. Key fields include work type, description, location, asset number, status, priority, start and finish dates, labor and material costs, and utility outage information.

The interface is designed for pipe-delimited file submissions with strict validation rules, such as matching predefined value lists in Maximo, using specific date formats (MM/DD/YYYY), and requiring exact field lengths. Notable requirements include populating work order details like service provider reference codes, asset numbers, target completion dates, and GL accounts. The document emphasizes data accuracy, with many fields having specific crosswalk requirements and default behaviors if left blank, ensuring consistent data integration between contractor systems and NAVFAC's Maximo platform.

View the file

Other files

File Type Posted
N6945025R0003-0007.pdf PDF
JL-1_Labor_Hours_Spreadsheet_0007.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0007.xlsx XLSX spreadsheet
JL-11_N6945025R0003_GPI Responses_0007.pdf PDF
J-0200000-17_ELINs_0006.xlsx XLSX spreadsheet
N6945025R0003-0006.pdf PDF
J-0200000-18 CAT Call Request_0005.pdf PDF
J-1606000-07 Historical Water Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003_SectionJ_0005.pdf PDF
J-0200000-02-01_N6945025R0003 CBA-2025-439_0005.pdf PDF
N6945025R0003_SectionC_0005.pdf PDF
N6945025R0003-0005.pdf PDF
J-1502000-24 FRCS Roles and Responsiblities_0005.xlsx XLSX spreadsheet
J-0200000-02-02_N6945025R0003 CBA-2025-440_0005.pdf PDF
JL-11_N6945025R0003_GPI Responses_0005.pdf PDF
J-1503010-05 Custodial Inventory_0005.xlsx XLSX spreadsheet
J-1502000 (MCSF-BI) Facility Investment_0005.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0005.xlsx XLSX spreadsheet
J-1502000 Facility Asset Inventories_0005.xlsx XLSX spreadsheet
J-0600000-04 Historical Port Ops Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003-0004.pdf PDF
N6945025R0003-0003.pdf PDF
JL-9_N6945025R0003_Site_Visit_Brief_0002.pdf PDF
JL-10_N6945025R0003_Site_Visit_Sign-In_Sheets_0002.pdf PDF
N6945025R0003-0002.pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE_0001.pdf PDF
N6945025R0003-0001.pdf PDF
J-1503050-09 (MCSF-BI) Paved Roadways and Lots Map.pdf PDF
JL-6_N6945025R0003_MBOS SITE VISIT Directions.pdf PDF
J-0200000-22 NAVFACINST 11230.1.pdf PDF
JM-2_N6945025R0003_Historical_Small_Business_Utilization.docx DOCX document
J-1502000-07 (MCSF-BI) Compressed Air Systems.pdf PDF
J-0200000-07 Utility Asset Condition Report.xlsx XLSX spreadsheet
J-0600000-03 Maps and Locations.pdf PDF
J-1502000-23 FRCS Cybersecurity Program.pdf PDF
J-1503030-04 (MCSF-BI) Solid Waste and Recycle Containers.pdf PDF
J-1800000-06 Mayport SWPPP.pdf PDF
N6945025R0003_SectionF.pdf PDF
N6945025R0003_2015-4539 (Rev.-28).pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE.pdf PDF
J-1502000-19 NAVSTA Cross Connection Control Program.pdf PDF
N6945025R0003_SectionC.pdf PDF
J-0200000-04 Partnering Agreement.pdf PDF
J-1503050-07 (MCSF-BI) Shoreline Cleanup Map.pdf PDF
J-1502000-08 (MCSF-BI) Crane and Railroad Inventory.pdf PDF
JM-1_N6945025R0003_Corporate_Experience.docx DOCX document
J-0200000-20 USMCmaxUserGuide.docx DOCX document
J-1800000-12 (MCSF-BI) Stormwater System Map.pdf PDF
J-1502000-21 (MCSF-BI) Lighting Systems.pdf PDF
J-1601000-05-01 Service Desk Guide for Reporting Utility System Outages.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Service Provider Info

ATTACHMENT J-0200000-09

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #:v3
Current as of:3 December 2015
Version History
v1 - Updated to reflect current interface in MAXIMO
v2 - Update to reflect addition of Utility Outage Reporting information & Support GL Account Import
v3 - Update to reflect addition of additional remarks field.[In sync with NITC R2 Interface Document]
TABS
1-Service Provider InfoThis Sheet
2-Service Provider Field ListService Provider Template Data Format Information
3-Service Provider - TemplateSample Excel Format

2-Service Provider Field List

ATTACHMENT J-0200000-09

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Service Provider (BOSC1) is a pipe delimited file.
PositionNameLength
LimitData Format NoteField DefinitionContent Notes
NAVFAC

MAXIMO_FIELD

(WORKORDER.)

1Approved Date10MM/DD/YYYY hh:mm:ssThe Date on which the Work Order was last approved. If the file contains an Approved Date, then this date will be pulled over to the record.
If the Approved Date in the file is null, then the Reported Date plus one minute will be displayed in the record.will default when upload if left blankAPPROVEDDATE
2Work Type15

Must match Value List in Maximo.

(Cross-walked field.). Must match CrosswalkIdentifies the work order's type.
Example types are: preventive maintenance, corrective maintenance, emergency maintenance, capital project, and event report.PM is used for all scheduled work
PROJECT for IMP repairsWORKTYPE
3Service Provider Reference Code10Contractors internal work order tracking number. Will update Record if Value is found in Maximo otherwise new record (Work order) will be created.* will delete if left blank when a work order is updated or completed.SERVPRVREFCODE
4Description150Describes the work order.
If the Description is null, in the inbound file, then this field is defaulted to CROSSWALK value.will create a default entry if left blank on update:

"Entered by SP FlatFile BOSC interface. No description provided."

Include contractor job plan number in the descriptionInclude PM job plan and frequency.

ie QUARTERLY PM JOB PLAN 1234. Or describe work performed ie Replace AHU fan motor and belt.DESCRIPTION
5Location30Must match Value List in MaximoIdentifies the work order's location. This is not necessarily the asset's location, however, if an asset is entered, its location will default here.
- If the Location is null, in the inbound file, then this field is defaulted to the site's base location.* Location is not required if the record has an asset #. Most records originating from the contractor system would be for maintenance on an asset # so this field can be left blank. If populated, the location must exist in NAVFAC MAXIMO or the record will be rejected.LOCATION
6Reported By62Must match Value List in MaximoIdentifies the person reporting the work order.Leave blank on flat file; auto-populates by direct entry.REPORTEDBY
7Master SystemN/ANot usedWill pull from asset number.N/A
8Status16(Cross-walked field.)
Must match CrosswalkStatus of the work order, for example, in progress, waiting on material, waiting for approval, completed, or closed.Value list in REFERENCE SPREADSHEETSTATUS
9Status Date10MM/DD/YYYY hh:mm:ssLeave blank on flat file; auto-populates by direct entry.STATUSDATE
10Priority12(Cross-walked field.)
Must match CrosswalkIdentifies the importance of the work order, from 0-999, where 0 is the lowest priority and 999 is the highest. If the Priority is null, in the inbound file, then this field is defaulted.Leave blank on flat file unless local direction is providedWOPRIORITY
11Actual Start10MM/DD/YYYY hh:mm:ssFormat is importantACTSTART
12Actual Finish10MM/DD/YYYY hh:mm:ssFormat is importantACTFINISH
13Supervisor30Must match Value List in MaximoLeave blank; if used, must match a MAXIMO userSUPERVISOR
14Labor Hours(Actual)8Number (2 decimal places)required to change status to COMPACTLABHRS

15 Labor Cost(Actual) 10 Number (2 decimal places) required to change status to COMP ACTLABCOST

16 Material Cost(Actual) 10 Number (2 decimal places) required to change status to COMP ACTMATCOST

17Duration8Number (2 decimal places)Estimated remaining number of hours needed to complete the work.May be left blankESTDUR
18Asset25Must match an existing ASSETNUM in MaximoThe asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.The asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.ASSETNUM
19Target Finish10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Finish is calculated using the Frequency of Service in J-0200000-01.

For IMP system breakdowns the Target Finish is 2 days from the date the work was reported to the Contractor

For E/U/R the Target Finish date is calculated from the date the work was reported to the Contractor.Required to create the work orderTARGCOMPDATE
20Target Start10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Start is calculated using the Frequency of Service in J-0200000-01.

For IMP system breakdowns the Target Start is the date the work was reported to the Contractor

For E/U/R the Target Start date is calculated from the date the work was reported to the Contractor.Required to create the work order.TARGSTARTDATE
21Reported Date10MM/DD/YYYY hh:mm:ssLeave blank on flat file; auto-populates by direct entry.REPORTDATE
22Lead30Must match Value List in MaximoLead person responsible for the work.Leave blank; if used, must match a MAXIMO userLEAD
23Scheduled Start10MM/DD/YYYY hh:mm:ssScheduled start should be between the target start and target completion dateRequired if status change to inprogress or approvedSCHEDSTART
24Scheduled Finish10MM/DD/YYYY hh:mm:ssScheduled finish should be between the target start and target completion dateRequired if status change to inprogress or approvedSCHEDFINISH
25Modified Date10LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEDATE
26Modified By30LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEBY
27N/A4MM/DD/YYYY hh:mm:ssN a should be between the target start and target completion datePlaceholder for WORKORDER.PMNEXTDUEDATE. Value is not presently imported.PMNEXTDUEDATE
28N/A1Yes or NoUse "N" or leave blankISTASK
29N/A10Length Limit: 250Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.PARENT
30Work Order10Must match Value List in MaximoUsed in updating record status on existing records.Not required if the record has a Service Provider Reference Code, otherwise must match the MAXIMO work orderWONUM
31Detail Location250Detail location should be between the target start and target completion dateleave blank; will pull from asset numberDETAILLOC
32CLIN30Contract Line Item NumberValue list in ELINs TabCLIN
33Customer Ref Code8Must match Value List in MaximoLeave blank unless Requirements provides reference list.May be blank; if used, must match a code in MAXIMOCUSTOMERCODE
34Sub Work Type15(Cross-walked field).
Must match CrosswalkDefaulted field based on the value of worktypeFACILITIES for scheduled work in Annex 1502000

UTILITIES for scheduled work in any Annex 16 sub-annex

FPCT for IMP repairs under the limit of liabilitySUBWORKTYPE
35Work Center8Must match Value List in MaximoWork center should be between the target start and target completion dateFor this contract use MYP_CTR1
Do not leave blank or will assign to CHR_CTR.PERSONGROUP
36GL Account27Must be a complete GL account or will imported as NULLOnly full GL Account, including delimiters, values can be imported.Use "S.N69450.NX.TRACKNSTXXXXXXXX" for all work orders. changes every FYGLACCOUNTThis will need the new fiscal year GL account number
37Outage Type50ALNType of utility outageMay be blank. The “Outage Type” value must be a valid value available in the “OUTTYPE” domain.OUTAGETYPE
38Outage Cause50ALNCause of utility outageMay be blank. The “Outage Cause” value must be a valid value available in the “OUTCAUSE” domain.OUTAGEREASON
39Num of Bldgs Affected12IntegerNumber of Building affected (whole number)May be blankNUMBLDSAFFECTED
40Outage Start Date10MM/DD/YYYY hh:mm:ssOutage Start (Date/Time)May be blank. The “Outage Start Date” value must be m valid value available in the “OUTDATE” domain.OUTAGESTARTDATE
41Outage End Date10MM/DD/YYYY hh:mm:ssOutage End (Date/Time)May be blank. The “Outage End Date” value must be m valid value available in the “OUTDATE” domain.OUTAGEENDDATE
42Remarks1000ALNAdditional remarks. At each submission the remarks are appended to the END of previous remarks. /// Use and Style is a CONTRACT SPECIFIC USE ///Each remark submission is restricted to 1000 characters, and the DATE will be appended in Maximo prior saving. This can be used (local/contract specific guidance) to provide a chronology to the work order. Resulting format would be: DATE1 - Remark1; DATE2 - Remark2; etc.

The total field length is restricted to <2000 characters - or a maximum of 11-12 remarks on a single Work Order.

The following information shall be provided if it is relevant:

1. Name and phone number of all Government personnel with whom the work was coordinated or provided clarificaiton to the technician, and date KO was notified of any problems scheduling the work or accessing the location.

2. A narrative of work performed and technicians observations.

3. The estimated cost and date notification of work exceeding LOL was submitted to the KO. LONGDESCRIPTION

3-Service Provider-Template

ATTACHMENT J-0200000-09
SERVICE PROVIDER INFORMATIONATTACHMENT J-0200000-XX

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Position123456789101112131415161718192021222324252627282930313233343536373839404142
NameApproved DateWork TypeService Provider Reference CodeDescriptionLocationReported ByMaster SystemStatusStatus DatePriorityActual StartActual FinishSupervisorLabor Hours
(Actual)Labor Cost
(Actual)Material Cost
(Actual)DurationAssetTarget FinishTarget StartReported DateLeadScheduled StartScheduled FinishModified DateModified ByPMNEXTDUEDATEIs Task?Parent WOWork OrderDetail LocationCLINCustomer Ref CodeSub Work TypeWork CenterGL AccountOutage TypeOutage CauseNum of Bldgs AffectedOutage Start DateOutage End DateRemarks
Validation toolYYYYY
REQUIRED TO CREATE WONY*YYY*NNYNNNNNNNNNYYYNNNNNNNNNNNYNY*YYNNNNNN*
REQUIRED TO UPDATE WONY*Y*YNNNNNNNNNNNNNYNNNNY*Y*NNNNNNNNNY*YYNNNNNN*
REQUIRED TO COMP WONY*Y*YNNNYNNYYNY*Y*Y*NYNNNNNNNNNNNNNNNY*YYNNNNNY*

NOTES:

• File naming convention: boscextract_MYP1_YYYYMMDD.txt

• ONLY POSITION/COLUMN 1-42, and rows containing data should be be included in the FLAT-FILE SUBMISSION;

• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 41 PIPEs per row resulting in 42 columns.)

• Actual Completion dates – Both Actual Start and Actual Finish completion dates are required when changing status to COMP workorder
• Asset number is required for work type PM and PROJECT. Asset number is not required for work type EMERGENCY, URGENT, ROUTINE
• Target dates – When one is provided, both Target Start and Target Finish must be entered.