J-6_QASP.pdf
PDF 91 KB Posted
- Attached to
- USS SAMPSON 8C1 DSRA Federal contract opportunity
- Solicitation number
- N4523A-18-R-0550
View the file
Other files for this federal contract opportunity
Show all 50
USS SAMPSON 8C1 DSRA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
DEPARTMENT OF THE NAVY
Quality Assurance Surveillance Plan (QASP) For
USS SAMPSON FY18 DSRA
N4523A – 18 – R – 0550 Attachment J-6
1. Purpose This Quality Assurance Surveillance Plan (QASP) provides the performance criteria, standards, and procedures for the Government’s surveillance and oversight of the Contractor’s performance to assure deliverables are timely, adequate, and complete and to assure performance is meeting the requirements specified in the contract.
2. Government Roles and Responsibilities The following personnel shall oversee and coordinate surveillance activities:
a. Administrative Contracting Officer (ACO) – The ACO shall assure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The ACO shall also assure the contractor receives impartial, fair, and equitable treatment under this contract. The ACO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
i. Assigned ACO: TBD at time of contract award
b. Technical Point of Contact (TPOC) – The TPOC is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The TPOC shall keep a quality assurance file. The TPOC is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned TPOC: TBD at time of contract award
3. Performance Standards The Performance Requirements are listed in Enclosure (1). The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
4. Deducts Deducts will be based on unfavorable contractor performance as recommended by the TPOC and de-termined by the ACO. There will be monetary deducts as outlined in Enclosure (1). Amount to be unilaterally deducted by Government from the associated WI CLIN. In the instance the deduction cannot be traced directly to a WI (e.g., due to non-conformance to a standard item), the total amount will be deducted from CLIN 0001, TYCOM funds via contract modification. Penalties will be capped at $200,000.
5. Methods of Surveillance:
Various methods exist to monitor performance. The Government may use, and is not limited to, the surveillance methods listed below in the administration of this QASP:
a. Direct Observation: The ACO and/or TPOC will provide on-site oversight to assure the
Contractor is adequately performing to the contract specifications.
b. Verification of documentation/deliverables provided by Contractor: Government review and assessment of deliverables (timely submission, accuracy, and completeness) and performance will be accomplished in accordance with this QASP, the Joint Fleet Maintenance Manual (JFMM), the SOW and Contract Data Requirements Lists (CDRLs).
c. Inspections: Other inspections may be made in cases such as accident investigations, etc.
Inspections shall be divided and scheduled as required.
6. Evaluation Ratings:
The Government will evaluate the Contractor’s performance of the SOW and the TPOC will assign a rating of either acceptable or unacceptable. The acceptable quality levels are outlined in Enclosure (1).
7. Documenting Performance
a. The Government will document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing past performance information using the Contractor Performance Assessment Report System (CPARS).
8. Frequency of Measurement
a. Frequency of Measurement. The frequency of measurement for deliverables is defined in the
SOW and each CDRL. The contractor’s performance will be continuously monitored. The Government will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
Enclosure (1): Performance Standards, Acceptable Quality Levels, & Deducts
A) Deliverable/ Assessment Area
B) Performance / Acceptable Quality Level Requirement C) Deduct*
1. Schedule and Associated Reports per Work Item
(WI) 009-60
a) Schedule and Associated Reports are provided in accordance with the schedule require-ments stated in Table 2 within Work Item (WI) 009-60.
b) Schedule and Associated Reports are provided in accordance with the content and format requirements stated in Table 2 within Work Item (WI) 009-60.
i. If the Government does not provide schedules/information for AIT, Govern-ment-Contracted Third Party Maintenance Providers, S/F, CIS, FMA, or other schedules/information not known to the contractor, the contractor shall provide the schedule and associated reports (including the Integrated Production Sched-ule) in the required timeframes to include all information known to the contrac-tor up to 7 days prior to the date submitted.
ii. Unless otherwise directed/clarified by the supervisor, the contractor retains dis-cretion for elements left to contractor discretion in WI 009-60. Should the su-pervisor provide direction or clarification on discretionary elements, the direc-tion/clarification will take effect, for the purposes of rejection or acceptance, on the next required submission of 009-60 deliverables. Furthermore, should the supervisor and the contractor disagree as to whether an element within 009-60 is objectively required or discretionary, supervisor clarification will take effect on the next required submission of 009-60 deliverables.
iii. Rejection or Acceptance of a deliverable described in 009-60, Table 2 will be determined on whether:
a. The deliverable provided conforms to objective, non-discretionary, requirements referenced in Table 2.
b. The deliverable provided conforms to the Supervisor’s direction or clarification of the desired interpretation of objec-tive/discretionary elements and/or clarification of the applicabil-ity of discretionary elements.
iv. Rejection or Acceptance of a deliverable described in 009-60, Table 2 will not be determined on whether the deliverable provided satisfies the supervisor’s subjective determinations of reasonableness beyond the Rejection or Ac-ceptance criteria in paragraph (a) above. Therefore, subjective determinations of the adequacy or reasonableness of elements, like schedule or manning plans, the contractor’s status to plans, forecasts, and mitigation plans will not be a ba-sis for rejection.
a) $5,000 per each day the IPS is late or not pro-vided. And;
b) $5,000 per each time the IPS is rejected by the Government due to not meeting the Performance / Acceptable Quality Level Requirement in Column (B).
i. If an IPS is rejected by the Gov-ernment, additional deducts will be calculated in accordance with para-graph (a) above, for a minimum of one additional day.
2. Milestones for Certain Reports per Contract Sec-tion C paragraph
1.0 and 1.14
a) The contractor shall complete the necessary work associated with the reports in Contract Section C Paragraph 1.10 and 1.14 and submit to the Government the required reports in the necessary format and containing the required information as specified in the Work Item no later than the dates specified in Section C Paragraph 1.10 and 1.14. Any Condition Found Report that has the potential to impact the availability schedule must have an applicable impact statement included in the report.
a) $2,000 per each day each report is late or not provided.
3. Corrective Ac-tion Reports (CARs)
a) Level B, C and Level D CARs are responded to within the required response date outlined in each respective CAR.
b) Contractor’s response/resolution to a Level B, C or Level D CAR is complete and ade-quate.
a) $250 per each day a response to a Level B, C or Level D CAR is past the required response date outlined in each respective CAR. And;
b) $250 per each time a response/resolution to a Level B, C, or Level D CAR is rejected by the Government due to incomplete or inadequate re-sponse.
i) Rejection of the contractor’s re-sponse/resolution shall be approved one level above the PM.
ii) Responses/resolutions may be re-jected more than once.
iii) If a Level C or Level D CAR is re-jected by the Government, addi-tional deducts will be calculated in accordance with paragraph (b) above, for a minimum of one addi-tional day.
Enclosure (1): Performance Standards, Acceptable Quality Levels, & Deducts