J-14_Pricing_Workbook_111517_(ECN).xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- USS SAMPSON 8C1 DSRA Federal contract opportunity
- Solicitation number
- N4523A-18-R-0550
View the file
Other files for this federal contract opportunity
Show all 50
USS SAMPSON 8C1 DSRA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDG102 CLIN 0001 Pricing
| USS SAMPSON DSRA CONTRACTOR PRICING SPREADSHEET Solicitation N4523A-18-R-0550 | |||||||||||
| Notice: this work sheet contains embedded cells; only enter data in the yellow highlighted cells. | Prime | Subcontractor | |||||||||
| Work Spec | COAR | Title | Labor Hours | Total Labor ($) | Material ($) | Price | Labor Hours | Total Labor ($) | Material ($) | Price | Work Item Price |
| 042-11-001 | 16 | Accountability of Man-hour and Material Reservation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 042-11-002 | 16 | Work Completion Certification; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 042-11-003 | 16 | Schedule and Associated Reports; provide and manage | $ - 0 | $ - 0 | $ - 0 | ||||||
| 042-11-004 | 16 | Work Package Execution Review; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 077-10-001 | 16 | Environmental Protection and Hazardous Waste Management Program; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 077-11-001 | 16 | Contractor Hazardous Waste Produced on Naval Vessels; control | $ - 0 | $ - 0 | $ - 0 | ||||||
| 110-11-001 | 16 | Underwater Hull; inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 110-11-002 | 16 | Hull and Support Structure Inspection; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 113-11-001 | 16 | Machinery Space Bilge Drain Well; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 121-11-001 | 16 | Structural Framing; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 121-11-002 | 16 | Structural Framing; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-00-001 | 16 | Tank and Void Open, Pump, Clean and Gas Free; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-001 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-002 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-003 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-004 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-005 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-006 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-007 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-008 | 16 | Fuel Service Tank and Gravity Head Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-009 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-010 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-011 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-012 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-013 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-014 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-015 | 16 | Compensated Fuel Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-016 | 16 | Compensated Fuel Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-017 | 16 | Fuel Oil Service and Gravity Head Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-018 | 16 | Fuel Service Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-11-019 | 16 | Fuel Service Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-12-001 | 16 | JP-5 Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-14-001 | 16 | Potable Water Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-14-002 | 16 | Potable Water Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-17-001 | 16 | Contaminated Oil Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-17-002 | 16 | Contaminated Oil Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-19-001 | 16 | Waste Water Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-19-002 | 16 | Waste Water Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-19-003 | 16 | Vacuum Collection Holding Tank; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-19-004 | 16 | Vacuum Collection Holding Tank; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-21-001 | 16 | Accessible Void; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-21-002 | 16 | Fueling At Sea Accessible Void; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-21-003 | 16 | Bulkhead Structure; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-22-001 | 16 | Chain Locker and Chain Locker Sump; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-22-002 | 16 | Accessible Void; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-22-003 | 16 | Chain Locker and Chain Locker Sump; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 130-11-001 | 16 | Aircraft Securing Fitting; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 150-11-001 | 16 | Deck Structural Repair; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 150-11-002 | 16 | Aqueous Film Forming Foam (AFFF) Stations Deck; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 150-80-001 | 16 | AER DDG51-83007D, Increase Deck Plate Thickness (Partial); accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 165-11-001 | 16 | Lower Sonar Dome Access Scuttle; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 165-11-002 | 16 | Sonar Dome Rubber Window (SDRW); inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 165-11-003 | 16 | Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 167-11-001 | 16 | Bolted Equipment Removal Plate (BERP) Repair; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 167-11-002 | 16 | Hatch; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 167-11-003 | 16 | Watertight Scuttle; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 167-80-001 | 16 | ShipAlt DDG51-77228D, CRES Individually Dogged Watertight Door Replacement; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 241-11-001 | 16 | Number One Main Reduction Gear (MRG) Turning Gear; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 243-11-001 | 16 | Starboard Propulsion Shafting; inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 243-11-002 | 16 | Starboard Stern Tube Shaft Seal; overhaul | $ - 0 | $ - 0 | $ - 0 | ||||||
| 243-12-001 | 16 | Port Propulsion Shafting; inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 243-12-002 | 16 | Port Stern Tube Shaft Seal; overhaul | $ - 0 | $ - 0 | $ - 0 | ||||||
| 245-11-001 | 16 | Starboard Controllable Pitch Propeller (CPP) System; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 245-12-001 | 16 | Port Controllable Pitch Propeller (CPP) System; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 251-30-001 | 16 | Gas Turbine Intake; repair and preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 251-30-002 | 16 | Gas Turbine Intake; repair and preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 251-31-001 | 16 | Ships Service Gas Turbine Generator (SSGTG) Intake Trunk; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 251-31-002 | 16 | Air Intake and Exhaust Louver; clean and preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 259-10-001 | 16 | Number 2 Gas Turbine Mixing Room, Uptake; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 259-10-002 | 16 | Number One Gas Turbine Mixing Room, Uptake; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 259-11-001 | 16 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 261-11-001 | 16 | Fuel Oil Service Heater; clean and inspect | $ - 0 | $ - 0 | $ - 0 | ||||||
| 262-11-002 | 16 | Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect | $ - 0 | $ - 0 | $ - 0 | ||||||
| 262-80-001 | 16 | ShipAlt DDG51-75044D Main Reduction Gear (MRG) Shaft Lock Piping Interference Modification; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 262-80-002 | 16 | ShipAlt DDG51-76501D, Main Reduction Gear Lube Oil Flexible Hose; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 300-11-001 | 16 | Cable and Cableway Inspection; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 437-21-001 | 16 | Tank Level Indicator (TLI) Bushing; install | $ - 0 | $ - 0 | $ - 0 | ||||||
| 462-11-001 | 16 | TR-232B/WQC-2A and TR-233B/WQC-2A, Transducer Cables and DT-513B/BQA-8 Hydrophones; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 463-80-001 | 16 | ShipAlt DDG51-76231D, Sonar Stave Cable Connectorization and Transducer Element Replacement; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 472-90-001 | 16 | ShipAlt's DDG51-80156K and 81382K, AN/SLQ-32(V)6 SEWIP Block 2 Upgrade; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 508-11-001 | 16 | Machinery Space Insulation; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-001 | 16 | Galley and Laundry Exhaust Ventilation; clean | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-002 | 16 | Ventilation Ducting and Vaneaxial Fan Unit; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-003 | 16 | Cooling Coil; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-004 | 16 | Supply Ventilation; clean and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-005 | 16 | Collective Protection System Louvers; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 512-11-006 | 16 | Ventilation Spool; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 514-11-001 | 16 | Chilled Water Isolation Valves; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 514-21-001 | 16 | Air Conditioning (AC) Plant Condenser; clean | $ - 0 | $ - 0 | $ - 0 | ||||||
| 520-11-001 | 16 | Sea Valve; repair and replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 523-11-001 | 16 | Countermeasure Washdown (CMWD) System Zone 2 and 4; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 526-80-001 | 16 | AER DDG51-64085D, Weather Deck Drain Modification; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 526-80-002 | 16 | AER DDG51-64244D, Weather Deck Drain; install | $ - 0 | $ - 0 | $ - 0 | ||||||
| 526-80-003 | 16 | AER DDG51-64270D, 02 Level Weather Deck Drain Installation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 541-11-001 | 16 | Fuel Oil Butterfly Valve; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 541-12-001 | 16 | Fuel Oil Transfer Piping; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 551-11-001 | 16 | Anti-Icing and Bleed Air Pipe Hanger Liner; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 551-21-001 | 16 | Low Pressure Air Receiver; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 551-60-001 | 16 | Spring Hanger; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 551-62-001 | 16 | Masker and Prairie Air Cooler; clean and inspect | $ - 0 | $ - 0 | $ - 0 | ||||||
| 562-11-001 | 16 | Port and Starboard Rudder Bearing Seal and Rudderstock Seal; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 562-11-002 | 16 | Rudder; inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 562-11-003 | 16 | Rudder; inspect and repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 571-11-001 | 16 | Sliding Padeye, Tilting; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 581-11-001 | 16 | Ground Tackle; inspect and preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 582-11-001 | 16 | Retractable Chock and Drain; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 583-11-001 | 16 | Slewing Arm Davit (SLAD); overhaul | $ - 0 | $ - 0 | $ - 0 | ||||||
| 588-21-001 | 16 | Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 593-11-001 | 16 | Vacuum, Collection, Holding and Transfer (VCHT) Piping System chemical cleaning; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 611-80-001 | 16 | AER DDG51-64185D, Anchor Chain Chafing Plate Installation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 612-11-001 | 16 | Stanchion Deck Socket; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 623-21-001 | 16 | Starboard Bail Bracket; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 624-11-001 | 16 | Balanced Joiner Door; remove, store and install | $ - 0 | $ - 0 | $ - 0 | ||||||
| 631-11-001 | 16 | Forward Machinery Rooms Bilge; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 631-11-002 | 16 | Aft Machinery Room Bilge; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 631-21-001 | 16 | Mast Preservation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 631-31-001 | 16 | Underwater Hull; preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 631-41-001 | 16 | Freeboard Preservation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 633-21-001 | 16 | Impressed Current Cathodic Protection (ICCP) System Reference Electrode; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 634-11-001 | 16 | Deck Covering System; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 634-11-002 | 16 | Carpet; install | $ - 0 | $ - 0 | $ - 0 | ||||||
| 634-11-003 | 16 | Recovery Assist Securing and Traversing System (RAST) Machinery Room Nonskid; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 634-11-004 | 16 | Magazine Nonskid; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 634-21-001 | 16 | Flight Deck Nonskid; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 635-11-001 | 16 | Number 2 Main Engine Room Uptake Insulation; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 643-11-001 | 33 | Berthing Habitability Projects BENL-S5356 and HENL-S5354 Installation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 644-11-001 | 16 | Washroom Shower Stall and Deck; repair | $ - 0 | $ - 0 | $ - 0 | ||||||
| 651-11-001 | 16 | Crew/Chief Petty Officer Galley Griddle; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 651-80-001 | 16 | ShipAlt DDG51-70015D, Scullery Dishwasher Installation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 655-80-001 | 16 | ShipAlt DDG51-00429D, Self Service Laundry Installation; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 721-31-001 | 16 | Vertical Launch System (VLS) flush; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 721-31-002 | 16 | Vertical Launch System (VLS); preserve | $ - 0 | $ - 0 | $ - 0 | ||||||
| 721-31-003 | 16 | Vertical Launching System (VLS), Cell Hatch; replace | $ - 0 | $ - 0 | $ - 0 | ||||||
| 837-11-001 | 16 | Antenna Photographs; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 844-31-001 | 16 | Combat Systems Discrepancy Correction; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 864-11-001 | 16 | Light-Off Discrepancy Correction Assistance; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-001 | 46 | OrdAlt DDG102-74603K, Sidewall Capacitor Monitor, Alteration Installation Team (AIT) Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-002 | 30 | DDG51 Class OrdAlt 83135, Close In Weapons System (CIWS) BLK-1B, Alteration Installation Team (AIT)Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-003 | 30 | DDG51 Class OrdAlt OA 70078, OA 70920, OA 70921, OA 77862, and OA 83489 Alteration Installation Team (AIT) Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-004 | 35 | ShipAlt DDG51-81798K, NAVMACS Technical Refresh Alteration Installation Team (AIT) Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-005 | 35 | ShipAlt DDG51-87402K, SSEE INC F AS4293A UPG, Alteration Installation Team (AIT) Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-006 | 35 | ShipAlt DDG51-88045K, CANES Mod 01, Alteration Installation Team (AIT) Support Service; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 980-90-008 | 30 | ShipAlt DDG51-00288K, Convert Bosin Storeroom No. 2 to Hazardous Materials Minimization Center; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 982-31-001 | 16 | Dock Trial, Fast Cruise, and Sea Trial; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 991-12-001 | 16 | Staging for Ship's Force Use; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-10-001 | 16 | Wharf and Pier Laydown Area; utilize and manage | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-001 | 16 | Temporary Service at Contractor's Facility; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-003 | 16 | Temporary Refrigerated Storage Facility, provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-004 | 16 | Temporary Air Conditioning; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-006 | 16 | Demineralized Water; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-007 | 16 | Temporary Flammable Liquid Storage and Hazardous Material Storage Unit; provide. | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-11-008 | 16 | Temporary Services at Naval Station Everett; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 992-31-001 | 16 | Cleaning and Pumping; accomplish | $ - 0 | $ - 0 | $ - 0 | ||||||
| 993-11-001 | 16 | Ship's Force Warehouse Storage Space; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 993-31-001 | 16 | Temporary Main Reduction Gear (MRG) Dehumidifier System; provide | $ - 0 | $ - 0 | $ - 0 | ||||||
| 993-31-002 | 16 | AN/SPY-1D Antenna Protective Cover; install | $ - 0 | $ - 0 | $ - 0 | ||||||
| 993-31-003 | 16 | Temporary Deck Covering; install | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||
| Total Price of All Work Items | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | ||
| Notice: this work sheet contains embedded cells; only enter data in the yellow highlighted cells. | |||||||||||
| Note: this "Total Price of All Work Items" value will auto-populate from above; do not manually enter this number. Offeror shall enter this number as "AMOUNT" for their CLIN 0001 price of Section B of the solicitation. | 0 |
&"Times New Roman,Bold"In Process Work Spec List &"Times New Roman,Bold"&D-&T
DDG 102 CLIN 0003 Option item
| USS SAMPSON DSRA CONTRACTOR PRICING SPREADSHEET Solicitation N4523A-18-R-0550 | |||||||||||
| Notice: this work sheet contains embedded cells; only enter data in the yellow highlighted cells. | Prime | Subcontractor | |||||||||
| Work Spec | COAR | Title | Labor Hours | Total Labor ($) | Material ($) | Price | Labor Hours | Total Labor ($) | Material ($) | Price | Work Item Price |
| 980-90-007 | 30 | ShipAlt DDG51-82710K Hybrid Electric Drive (HED), Alteration Installation Team (AIT) Support Service | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Price of All Work Items | 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | ||
| Notice: this work sheet contains embedded cells; only enter data in the yellow highlighted cells. | |||||||||||
| Note: this "Total Price of All Work Items" value will auto-populate from above; do not manually enter this number. Offeror shall enter this number as "AMOUNT" for their CLIN 0003 price of Section B of the solicitation. | 0 |
&"Times New Roman,Bold"In Process Work Spec List &"Times New Roman,Bold"&D-&T
DDG102Labor&Matl Burden Rates
| USS SAMPSON DSRA CONTRACTOR PRICING SPREADSHEET Solicitation N4523A-18-R-0550 | |||
| Notice: only enter data on this worksheet in the yellow highlighted cells below. | |||
| Insert rate below | Price | ||
| Hours | Rate $ | ($ * hours) | |
| Direct Production (See Section B Note A) | 35,000 | $0.00 | $0 |
| Material | $750,000 | ||
| Material Burden Rate | Insert Rate ----> | ||
| Total Material Price = | Material * (1+ Material Burden Rate) | $750,000 |
Proposed Labor & Material Burden Rate Growth Price $750,000
The excel file has imbedded formulas. Offeror shall insert proposed rates in the highlighted cells in the format provided, with the formulas maintained.
Notice: The 35,000 hours and $750,000.00 material dollar values are for evaluation only. While the hour and material dollar values are based on historical data and are indicative of the number of hours and the dollar value of material typically required for growth on an average SRA on a DDG 51 class ship, the Contractor's proposed labor and material burden rates inserted on the worksheet will be incorproated into the contract and will be the fully burdened fixed labor and material fully burden rates for contract changes regardless of how many hours and how much material are procured as detailed in Section B Note A.
Sheet1
File details come from the government source that posted it.