J-1_Work_Package_Errata_4.pdf
PDF 7 MB Posted
- Attached to
- USS SAMPSON 8C1 DSRA Federal contract opportunity
- Solicitation number
- N4523A-18-R-0550
About this file
J-1 Errata 4
View the file
Other files for this federal contract opportunity
Show all 50
USS SAMPSON 8C1 DSRA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS SAMPSON (DDG 102)
TPPC-DDG102-NWRMC18-CN01
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
042-11-003
123-19-004
150-11-001
123-14-001
123-11-016
042-11-002
123-11-003
520-11-001
261-11-001
121-11-002
167-11-001
251-30-002
150-11-002
123-19-003
251-30-001
123-11-015
462-11-001
123-21-001
DATED: 12/11/2017 1:57:43PMPage 1 of 1
SHIP: USS SAMPSON (DDG 102) ITEM NO: 042-11-002
COAR: 16 PCN: EXSY-ZAG1
SWT FILE NO: 042-004 CMP: R-86031-A01
REVISED: 09 Jun 2017 PLANNER: OBERMEYER, JASON
ARMSTRONG,
RUSSELL
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 2 ITEM NO: 042-11-002
ERRATA NO. 4
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Work Completion Certification; accomplish
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 None
3. REQUIREMENTS:
3.1 Develop an Event Readiness List (ERL) which can be sorted by each key event (Propulsion PCD, Aegis Light Off ALO, Dock Trials, Fast Cruise, Sea Trials, Availability Completion) and is intended to assist in order to manage key event readiness. The ERL shall list all work (e.g., Contractor, AIT, Ship's Force, CIS, FMA) relevant to each Key Event and Milestone (e.g., Combat Systems PCD (ALO for Aegis Ships), Engineering Plant PCD, Dock Trials, Fast Cruise, Sea Trials, Availability Complete) and shall provide current status of Required Reports, Tests and Inspections data, Work Authorization Forms (WAF) data, AIT production and test data, CIS production and test data, FMA production and test data, Ship's Force Work List production and test data, status of the rquirements of this work item, and each operational test required for Key Event Work Completion Certification.
3.1.1 Schedule each work item in the ERL to the activity level, and each activity shall be displayed to reflect it's relevancy to the applicable key events and milestones.
3.1.2 Submit one legible copy, in approved transferrable media, of the ERL to the SUPERVISOR no later than the start of the availability.
3.1.3 Revise the ERL weekly throughout the availability to include additions, deletions, modifications and completions.
3.1.3.1 Submit one legible copy, in approved transferrable
media, of the revised ERL to the SUPERVISOR weekly throughout the availability.
3.2 Accomplish the following, utilizing ATTACHMENT A, in addition to the specific requirements of the Job Order, for each contractor responsible work item.
3.2.1 Certify that all contracted work (original, new and growth)
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 2 ITEM NO: 042-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
has been satisfactorily completed.
3.2.1.1 Document exceptions to the requirements of 3.2.1 in
appropriate block(s) with accompanying rationale and adjudication.
3.2.2 Certify all Tests and Inspections (T&I) are completed
satisfactorily and properly documented in the T&I Plan.
3.2.2.1 Document exceptions to the requirements of 3.2.2 in the appropriate block(s) with accompanying rationale and adjudication.
3.2.3 Certify that each required report has been submitted and all accompanying required data is both complete and satisfactory.
Report: COMPLETED ATTACHMENT A SITUATIONAL + 2 days
3.2.4 Submit one legible copy, in approved transferrable media, of a completed ATTACHMENT A for all contractor work items to the SUPERVISOR within 72 hours of work completion or 48 hours prior to the key event associated with the work item, whichever occurs first.
(E4)
4. NOTES:
4.1 A Work Completion Certification form is provided as Attachment A.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS SAMPSON (DDG 102) ITEM NO: 042-11-003
COAR: 16 PCN: EXSY-ZAB0
EXSY-ZAE6
EXSY-ZAA8
EXSY-ZAE5
CSWT FILE NO: 042-002 (DDG 51) CMP: NONE
REVISED: 08 Oct 2016 PLANNER: HAGEN, KEVIN
RICHEY , DARYL
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 3 ITEM NO: 042-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Schedule and Associated Reports; provide and manage
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Schedule each Work Item to the activity level for each government generated key event and milestone. Each Government milestone and key event shall be used as the basis for contractor production schedule development. Each contractor generated milestone and key event shall be integrated into the availability combined events list during development of the contractor schedule and networks. For a definition and clarification of certain terms utilized within this Work Item, refer to Note 4.1.
3.1.1 Include in the production schedule consideration for the following Ship's events which will affect production work and access to specified areas onboard the ship. A equals availability start date.
EVENT AFFECTED AREA DATES A+ DATE
Availability Start Date Entire Ship 7/16/2018 A+0
Habitability Turnover Entire Ship 12/10/2018
Undocking Entire Ship 4/4/2019
Production Completion Entire Ship 1/7/2019
AEGIS Light Off Entire Ship 1/15/2019
Dock Trials Entire Ship 4/4/2019
Fast Cruise Entire Ship 4/5/2019
Sea Trials Entire Ship 4/8/2019
Availability Complete Entire Ship 4/12/2019 A+270
(E4)
EVENT AFFECTED AREA DATES A+ DATE
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 3 ITEM NO: 042-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Availability Start Date
Entire Ship 7/16/2018 A+0
Habitability Turnover
Entire Ship 12/10/18 A+147
Undocking Entire Ship 12/24/18 A+161
Production Completion
Entire Ship 1/7/19 A+175
AEGIS Light Off Entire Ship 1/15/19 A+183
Dock Trials Entire Ship 4/4/19 A+262
Fast Cruise Entire Ship 4/5/19 A+263
Sea Trials Entire Ship 4/8/19 A+266
Availability Complete
Entire Ship 4/12/19 A+270
3.1.1.1 The contractor will be notified in writing of dates for each planned event listed in 3.1.1, 48 hours prior to the start of the event.
3.1.1.2 Each date listed in 3.1.1 shall be considered tentative until verified and distributed by the SUPERVISOR.
4. NOTES:
4.1 Definitions:
4.1.1 Production Completion Date (PCD): Main Machinery space and propulsion plant production completion date is an availability key event that provides sufficient time for each necessary step to be taken by Ship's Force, to shift from a maintenance environment back to operations. Intent is that all major propulsion plant work and cold plant testing will be complete by all maintenance providers, by the scheduled propulsion plant PCD.
4.1.2 Completion: All work involving hull, structural, electrical, weapons systems, electronic systems and components, machinery and piping systems, requires certification as ready for sea prior to the beginning of fast cruise or sea trials. Each test, except those that require underway operation, shall be completed prior to the beginning of fast cruise or sea trials.
4.1.3 Work Complete: All production work, directly related or indirectly related to the Work Item, is 100 percent complete, including close out paper-work submittal: (i.e., Test Memo completed, WAF's closed, etc.).
4.1.4 Work Complete With Exceptions: Exceptions include each
designated compartment, componenet, systems or machinery, either completed or released to the degree required to support uninterrupted testing, operational or performance tests. Exceptions may include but are not limited to; operational tests, final lagging and touch-up paint in support of final hydrostatic tests, or machinery adjustments and tests, at-sea testing phase or LOA support work.
4.1.4.1 Production related work is complete and able to support
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 3 ITEM NO: 042-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
safe operational testing and production work satisfies the intent of the repair or alteration, to the extent that testing can be accomplished.
4.1.4.2 Exceptions shall be discussed and agreed to by Ship's Force, TYCOM, NSA or RMC Representatives, prior to partial acceptance of work or operational testing events.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SAFE FOR HOT WORK CERTIFICATE
SHIP: USS SAMPSON (DDG 102) ITEM NO: 121-11-002
COAR: 16 PCN: ES01-NA29
ES01-NA2W
CSWT FILE NO: 120-003 (DDG 51) CMP: NONE
REVISED: 08 Oct 2016 PLANNER: BUTTS, NATHANIAL
ARMSTRONG,
RUSSELL
JENSEN, JOHN
VIDUYA, MICHAEL
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 2 ITEM NO: 121-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Structural Framing; repair
1.2 Location of Work:
1.2.1 Sonar Equipment Room Number 3 (3-18-0-Q)
1.2.2 Supply Department Issue Room (Hazmincen) (4-410-1-A)
1.3 Identification:
1.3.1 Quantity (One EA), Stiffener, Starboard of Centerline, forward of bulkhead 42.
1.3.2 Quantity (One EA) Stringer (S-9), forward of bulkhead 442
1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22M (0584-LP-179-6400).
1.4.1 Spaces:
1.4.1.1 Sonar Equipment Room Number 3 (3-18-0-Q) (CONFIDENTIAL)
2. REFERENCES:
2.1 Standard Items
2.2 100-7026663 Rev G, Unit Struct Arr Dwg Assy Unit 1230
2.3 100-7026706 Rev G, Unit Structural Arr Dwg Assy Unit 3420
2.4 100-7026710 Rev F, Unit Strl Arr Dwg Assy Unit 3520
2.5 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each structural member listed in
1.3 and located in 1.2 for structural integrity, deterioration, pitting, cracks and areas of damage or distortion using 2.2 through 2.5 for guidance.
Report: VISUAL INSPECTION RESULTS SITUATIONAL + 3
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 2 ITEM NO: 121-11-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
days
3.1.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
3.2 Accomplish the following repair to each interior frame listed in
1.3.1 and 1.3.3 located in 1.2, as designated by the SUPERVISOR.
3.2.1 Crop out and replace each area identified in 3.2 using
Paragraph 12.3.3 of 2.5 for guidance.
3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
(V)(G) "LOCAL AIR HOSE TEST "
3.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test . Allowable leakage: None.
3.4.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 4 to the SUPERVISOR.
(E4)
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
GAS FREE CERTIFICATION REQUIRED
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-11-003
COAR: 16 PCN: EB14-ZAV8
EB14-ZAV6
EB14-ZAX8
EB14-ZAW4
CSWT FILE NO: 123-007 (DDG 51) CMP: Q-12311-A1O
REVISED: 08 Oct 2016 PLANNER: See Attachment A
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Compensated Fuel Tank; repair
1.2 Location of Work:
1.2.1 Fuel Receiving Tank Group 3 (4-174-1-F)
1.2.2 Fuel Tank Group 3 (5-220-3-F)
1.2.3 Fuel Expansion Seawater Overflow Tank Group 3 (5-254-1-F)
1.2.4 Fuel Tank Group 3 (5-254-3-F)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 100-7026683 Rev K, Unit-Structural Arr Dwg-Unit 2220
2.3 100-7026413 Rev L, Unit Strl Arr Dwg Assy Unit 2410
2.4 100-7026682 Rev L, Unit Structural Arr Dwg Assy Unit 2210
2.5 100-7026687 Rev J, Unit Structural Arr Dwg Assy Unit 2310
3. REQUIREMENTS:
3.1 Accomplish base metal weld buildup in each tank listed in 1.2 as designated by the SUPERVISOR.
3.1.1 Base metal weld up a total of 240 square inches of plating defects for tanks listed in 1.2 in accordance with 2.2 through 2.5.
3.1.1.1 Verify surfaces are ground to sound metal prior to base metal weld buildup.
3.1.1.2 Fill each local pit and groove with weld material prior to application of principal build up layers.
3.1.1.3 Ensure base metal weld buildup is limited to areas
reduced by 25 percent, but not greater than 45 percent of original material thickness.
3.1.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.1.1.5 Replace 10 each broken or damaged studs.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A or B, Lines One through 7.
3.2.1 Accomplish nondestructive testing in accordance with line 11.
3.3 Repairs and materials less than the amounts identified, and not accomplished in 3.3 1 will be subject to recoupment.
(E4)
3.4 Provide 112 man-hours of labor and 2,500 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank preservation will be accomplished under work item 123-11-006, Compensated Fuel Tank; preserve
4.3 Tank preservation will be accomplished under work item 123-11-011, Compensated Fuel Tank; preserve
4.4 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 3 ITEM NO: 123-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
ELIAS, JOSHUA
ARMSTRONG, RUSSELL
CANTU, RICARDO
JENSEN, JOHN
NIMMICH, KENNETH
OBERMEYER, JASON
ROGERS, TODD
SEMLER, JOSHUA
CRITICAL COATING
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-11-015
COAR: 16 PCN: EB14-ZAS0
CSWT FILE NO: 123-138 (DDG 51) CMP: Q-12311-A18
REVISED: 08 Oct 2016 PLANNER: See Attachment A
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 4 ITEM NO: 123-11-015
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Compensated Fuel Tank; preserve
1.2 Location of Work:
1.2.1 Fuel Receiving Tank Group 6 (5-308-2-F)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 SN572-AH-MMA-010, Tank Level Indicators
2.3 633-6567062 Rev AL, Installation of Cathodic Protection and Zinc Anode
2.4 Systems and Specifications, SSPC Painting Manual, Volume 2, 2017 Edition
2.5 100-7026414 Rev K, Unit Structural Arr Dwg-Assy Unit 3110
2.6 100-7026703 Rev K, Unit Strl Arr Dwg Assy Unit 3320
3. REQUIREMENTS:
(V)(G) "OPERATIONAL TEST"
3.1 Accomplish an operational test of the Tank Level Indicator (TLI) system for each tank listed in 1.2, using 2.2 for guidance.
Report: OPERATIONAL TEST + 3 days
3.1.1 Submit one legible copy, in approved transferable media, of a report listing the results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Accomplish the requirements of 009-05 of 2.1.
3.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
3.2.1.1 Accomplish nondestructive testing in accordance with
Line 9.
3.2.2 Accomplish the requirements of 009-25 of 2.1, for an air hose, SSP: TPPC-DDG102-NWRMC18-CN01 2 of 4 ITEM NO: 123-11-015
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
water hose, or vacuum box test of new weld seams. Allowable leakage:
None.
3.3 Remove each existing zinc in each tank listed in 1.2, using 2.3 for guidance.
3.4 Accomplish mechanical tool clean of affected areas in each tank listed in 1.2. Accomplish requirements of Surface Preparation Specification SSPC-SP-11 of 2.4 as directed by the SUPERVISOR.
(V) "VISUAL INSPECTION"
3.5 Accomplish a visual inspection of each tank listed in 1.2, including sounding tubes, tank vents, overflows, piping, pipe hangars/liners, ladders, manhole covers and structural members for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion using
2.5 and 2.6 for guidance.
Report: VISUAL INSPECTION + 3 days
3.5.1 Submit one legible copy, in approved transferable media, of a report listing the results of the requirements of 3.5 to the
SUPERVISOR.
3.6 Accomplish repairs as directed by the SUPERVISOR (See Note 4.2).
3.7 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 11, Column B for partial preservation of surface area throughout the tank listed in 1.2, for a combined total of 161 Square Feet of defective painted surfaces as directed by the SUPERVISOR.
3.8 Repairs DELETEDand materials less than the amounts identified, and not accomplished in 3.2 will be subject to recoupment.
(E4)
3.9 Install each new zinc anode in each tank listed in 1.2, using 2.3 for guidance.
TOTAL
QUANTITY
REQUIRED
NAME OF
PART
PIECE
NO. REF. NO.
FIGURE/DRAWING
NO. NIIN
128 Zinc, anode, cathodic, 315, MIL-A-
18001ZEP-B
633-6567062 00-702-
64 Zinc, anode, cathodic, 314, MIL-A-
18001ZHC-
633-6567062 00-813-
3.9.1 Apply anti-seize compound conforming to A-A-59313 to each threaded area of each nut and each stud.
3.9.2 Install each new nut and washer, conforming to the material requirements of General Note 7 in 2.3. Torque each zinc anode retaining nut to 30 foot-pounds of torque using General Note 10 of
2.3 .
(V) "RESISTANCE TEST"
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 4 ITEM NO: 123-11-015
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.9.3 Test each zinc to verify electrical resistance between each anode and hull structure is less than 0.1 Ohm.
Report: ZINC ANODE RESISTANCE TEST RESULTS + 3 days
3.9.3.1 Submit one legible copy, in approved transferable media, of a report listing the results of the requirements of 3.9.3 to the SUPERVISOR.
3.10 Provide 178 man-hours of labor and 3,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
(V)(G) "OPERATIONAL TEST"
3.11 Accomplish an operational test of the Tank Level Indicator (TLI) system components in each tank located in 1.2, using 2.2 for guidance.
3.12 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank repairs will be accomplished under work item 123-11-007, Compensated Fuel Tank; repair
4.3 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG102-NWRMC18-CN01 4 of 4 ITEM NO: 123-11-015
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
JENSEN, JOHN
ARMSTRONG, RUSSELL
HAGEN, KEVIN
LEE, LOUIS
MILTON, JERRY
NIMMICH, KENNETH
OBERMEYER, JASON
RICHEY , DARYL
SAFE FOR HOT WORK CERTIFICATE
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-11-016
COAR: 16 PCN: See Attachment A
CSWT FILE NO: 123-017 (DDG 51) CMP: Q-12311-A1O
REVISED: 08 Oct 2016 PLANNER: JENSEN, JOHN
ARMSTRONG,
RUSSELL
NIMMICH, KENNETH
RICHEY , DARYL
ROGERS, TODD
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 3 ITEM NO: 123-11-016
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Compensated Fuel Tank; repair
1.2 Location of Work:
1.2.1 Fuel Tank Group 1 (5-42-0-F)
1.2.2 Fuel Receiving Tank Group 1 (4-78-1-F)
1.2.3 Fuel Tank Group 1 (5-78-1-F)
1.2.4 Fuel Tank Group 1 (5-126-1-F)
1.2.5 Fuel Tank Group 1 (5-174-1-F)
1.2.6 Fuel Expansion Seawater Overflow Tank Group 1 (5-214-1-F)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 165-7026408 Rev G, Unit Strl Arr Dwg Assy Unit 1210
2.3 100-7026667 Rev F, Unit Strl Arr Dwg Assy Unit 1310
2.4 100-7026672 Rev G, Unit Strl Arr Dwg Assy Unit 1410
2.5 100-7026673 Rev G, Unit Strl Arr Dwg Assy Unit 1420
2.6 100-7026677 Rev J, Unit Structural Arr. Dwg. Unit 2110
2.7 100-7026682 Rev L, Unit Structural Arr Dwg Assy Unit 2210
3. REQUIREMENTS:
3.1 Accomplish base metal weld buildup in each tank listed in 1.2 as designated by the SUPERVISOR.
3.1.1 Base metal weld up for a total of 288 square inches of plating defects for tanks listed in 1.2 in accordance with 2.2 through 2.7.
3.1.1.1 Verify surfaces are ground to sound metal prior to base
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 3 ITEM NO: 123-11-016
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
metal weld buildup.
3.1.1.2 Fill local pits and grooves with weld material prior to application of principal build up layers.
3.1.1.3 Ensure base metal weld buildup is limited to areas
reduced by 25 percent, but not greater than 45 percent of original material thickness.
3.1.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
3.1.1.5 Replace 10 each broken or damaged studs.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A or B, Lines One through 7.
3.2.1 Accomplish nondestructive testing in accordance with line 11.
3.3 Repairs and materials less than the amounts identified, and not accomplished in 3.3 1 will be subject to recoupment.
(E4)
3.4 Provide 112 man-hours of labor and 2,500 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank preservation will be accomplished under work item 123-11-001, Compensated Fuel Tank; preserve
4.3 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 3 ITEM NO: 123-11-016
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
PCN Identification
EB14-ZAX7 COMP/EXP FO TK - CLAD RPR
EB14-ZAW3 COMP/EXP FO TK - CLAD RPR
EB14-ZAW0 COMP/EXP FO TK - CLAD RPR
EB14-ZAV7 COMP/EXP FO TK - CLAD RPR
EB14-ZAX2 COMP/EXP FO TK - CLAD RPR
EB14-ZAX4 COMP/EXP FO TK - CLAD RPR
SAFE FOR HOT WORK CERTIFICATE
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-14-001
COAR: 16 PCN: EA01-ZAM5
EA01-ZAM6
EA01-ZAM4
EA01-ZAM7
CSWT FILE NO: 123-013 (DDG 51) CMP: Q-12314-A0Q
REVISED: 08 Oct 2016 PLANNER: ELIAS, JOSHUA
ARMSTRONG,
RUSSELL
NIMMICH, KENNETH
ROGERS, TODD
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 2 ITEM NO: 123-14-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Potable Water Tank; repair
1.2 Location of Work:
1.2.1 Potable Water Tank (4-126-2-W)
1.2.2 Potable Water Tank (4-126-1-W)
1.2.3 Potable Water Tank (4-150-2-W)
1.2.4 Potable Water Tank (4-150-1-W)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 100-7026678 Rev K, Unit Structural Arr Dwg Assy Unit 2120
2.3 100-7026679 Rev M, Unit Struct Arr Dwg Assy Unit 2130
3. REQUIREMENTS:
3.1 Accomplish base metal weld buildup in each tank listed in 1.2 as designated by the SUPERVISOR.
3.1.1 Base metal weld up for a total of 144 square inches of plating defects for each tank listed in 1.2 using 2.2 and 2.3 for guidance.
3.1.1.1 Verify surfaces are ground to sound metal prior to base metal weld buildup.
3.1.1.2 Fill local pits and grooves with weld material prior to application of principal build up each layer.
3.1.1.3 Ensure base metal weld buildup is limited to areas
reduced by 25 percent, but not greater than 45 percent of original material thickness.
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 2 ITEM NO: 123-14-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.1.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A or B, Lines One through 7.
3.2.1 Accomplish nondestructive testing in accordance with Line 11.
3.3 Repairs and materials less than the amounts identified, and not accomplished in 3.2 1 will be subject to recoupment.
(E4)
3.4 Provide 200 man-hours of labor and 2,500 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank preservation will be accomplished under work item 123-14-002, Potable water Tank; preserve
4.3 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-19-003
COAR: 16 PCN: ER01-ZA57
ER01-ZA56
CSWT FILE NO: 123-115 (DDG 51) CMP: Q-12319-A0F
REVISED: 09 Oct 2016 PLANNER: See Attachment A
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 3 ITEM NO: 123-19-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Vacuum Collection Holding Tank; repair
1.2 Location of Work:
1.2.1 Vacuum Collection Holding Tank Room Number One (4-110-0-E)
1.2.2 Vacuum Collection Holding Tank Room Number 2 (4-300-0-E)
1.3 Identification:
1.3.1 Quantity (2 EA), VCHT Tank, Capacity: 490 Gallons
1.3.2 Quantity (One EA), Plumbing Waste Drain Tank, Number One, Capacity: 350 Gallons
1.3.3 Quantity (One EA), Plumbing Waste Drain Tank, Number 2, Capacity: 400 Gallons
2. REFERENCES:
2.1 Standard Items
2.2 100-7026673 Rev H, Unit Strl Arr Dwg Assy Unit 1420
2.3 100-7026696 Rev N, Unit Structural Arr Dwg-Assy Unit 3120
2.4 58568-7300006 Rev W, Tank Weldment-490 Gal, Capacity
2.5 505-6219172 Rev AC, Miscellaneous Tanks,Fab and Details, (Heavy)
3. REQUIREMENTS:
3.1 Accomplish the following repairs in each tank listed in 1.3, located in 1.2, as designated by the SUPERVISOR.
3.1.1 Vee-out and weld a total of 4 linear feet of deteriorated and damaged welds. Area of repairs shall include deck, bulkhead, shell plating, and overhead of tanks located in 1.2 and listed in 1.3.
3.1.2 Chip and grind surfaces flush in way of repairs.
3.1.3 Base metal weld up a total of 144 square inches of plating defects for tanks listed in 1.3, located in 1.2, in accordance with
2.2 through 2.5.
3.1.3.1 Verify surfaces are ground to sound metal prior to base metal weld buildup.
3.1.3.2 Fill local pits and grooves with weld material prior to application of principal build up of each layer.
3.1.3.3 Ensure base metal weld buildup is limited to areas
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 3 ITEM NO: 123-19-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
reduced by 25 percent, but not greater than 45 percent of original material thickness.
3.1.3.4 Grind surfaces of completed base metal weld buildup
smooth if greater than 1/8 inch above plate surface.
3.1.3.5 Replace 10 each broken or damaged studs.
3.1.4 Remove existing, fit and install new a total of 8 square feet of deteriorated plating for tanks listed in 1.3, located in 1.2, in accordance with 2.2 through 2.5.
3.1.4.1 The smallest insert plate shall be a minimum of one
square foot.
3.1.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces to match surrounding areas.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
3.3 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
3.4 Repairs and materials less than the amounts identified, and not accomplished in 3.2 1 will be subject to recoupment.
(E4)
3.5 Provide 112 man-hours of labor and 2,500 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank preservation will be accomplished under work item 123-19-005, Vacuum collection Holding Tank; preserve
4.3 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 3 ITEM NO: 123-19-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
JENSEN, JOHN
ARMSTRONG, RUSSELL
NIMMICH, KENNETH
OWENS, JEFFREY
RICHEY , DARYL
ROGERS, TODD
VIDUYA, MICHAEL
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-19-004
COAR: 16 PCN: ER01-ZA80
ER01-ZA78
CSWT FILE NO: 123-116 (DDG 51) CMP: Q-12319-A04
REVISED: 08 Oct 2016 PLANNER: See Attachment A
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 4 ITEM NO: 123-19-004
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Vacuum Collection Holding Tank; preserve
1.2 Location of Work:
1.2.1 Vacuum Collection Holding Tank Room Number One (4-110-0-E)
1.2.2 Vacuum Collection Holding Tank Room Number 2 (4-300-0-E)
1.3 Identification:
1.3.1 Quantity (2 EA), Tank, VCHT, Capacity: 490 Gallons
1.3.2 Quantity (One EA), Plumbing Drain Tank, Number One, Capacity:
350 Gallons
1.3.3 Quantity (One EA), Plumbing Drain Tank, Number 2, Capacity:
400 Gallons
2. REFERENCES:
2.1 Standard Items
2.2 SN572-AH-MMA-010, Tank Level Indicators
2.3 59312-3-005, VCHT Tank Level Sensor Test
2.4 Systems and Specifications, SSPC Painting Manual, Volume 2, 2017 Edition
2.5 58568-7300006 Rev W, Tank Weldment-490 Gal, Capacity
2.6 58568-7300005 Rev N, Sewage Collection Tank Outline
2.7 S9593-CE-MMA-010, Sewage Vacuum Collection Holding and Transfer System
2.8 59312-3-010, VCHT System Operational Test
3. REQUIREMENTS:
(V)(G) "OPERATIONAL TEST"
3.1 Accomplish an operational test of the Tank Level Indicator (TLI) system in each tank located in 1.2, using 2.2 and 2.3 for guidance.
Report: OPTEST REPORT + 4 days
3.1.1 Submit one legible copy, in approved transferrable media, of a
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 4 ITEM NO: 123-19-004
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
report listing results of the requirements of 3.1 to the SUPERVISOR.
3.2 Cover and seal all commodes and urinals to prevent usage by contractors and Ship’s Force personnel while VCHT systems are secured for repairs.
3.3 Commercial blast clean each tank listed in 1.3. Accomplish the requirements of Surface Preparation Specification SSPC-SP-6 of 2.4.
(V) "VISUAL INSPECTION"
3.3.1 Accomplish a visual inspection of each tank listed in 1.3, including level sensors, tank vents, overflows, washdown system, piping, pipe hangers/liners, ladders, manhole covers, and structural members for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion using 2.5 and 2.6 for guidance.
Report: VISUAL INSPECTION RESULTS SITUATIONAL + 3 days
3.3.1.1 Submit one legible copy, in approved transferrable
media, of a report listing results of the requirements of 3.3.1 to the SUPERVISOR.
3.4 Accomplish repairs as directed by the SUPERVISOR (See Note 4.2).
3.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 15, Columns A and B for each tank listed in 1.3.
3.6 Remove and clean tank flushing nozzles in each tank listed in 1.3, in accordance with in Paragraph 6-4.1 of 2.7. Clean each flushing nozzle using detergent/water solution. Detergent solution shall conform to MIL- D-16791 in accordance with Table 6-1 of 2.7.
(V) "FLUSHING NOZZLE TEST"
3.6.1 Accomplish an unobstructed flow test of each flushing nozzle for proper operation and unobstructed flow.
3.7 Install new zincs in each tank listed in 1.3 in accordance with Paragraph 6-5.16 of 2.7.
TOTAL
QUANTITY
NAME OF
PART PIECE NO. REF. NO.
FIGURE
DRAWING NO. PART NO.
12 (EA) Anode, Zinc Cathodic, MIL-A-
18001
44 2.6 Fig. 7-13 (Table 7- 15)
7000040
4 (EA) Anode, Zinc Cathodic
17268007
3.7.1 Apply anti-seize compound conforming to A-A-59313 to all
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 4 ITEM NO: 123-19-004
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
threaded areas of nuts and studs.
3.7.2 Install new nuts and washers, conforming to the material requirements of 2.7 and torque each zinc mounting stud to 30 foot-pounds.
(V) "RESISTANCE TEST"
3.7.3 Test each zinc to verify electrical resistance between anode and hull structure is less than 0.1 Ohm.
3.7.3.1 Submit one legible copy, in approved transferable media, of a report listing results of the requirements of 3.8.7.3 to the
SUPERVSIOR.
(E4)
3.8 Install flushing nozzles removed in 3.6.
(V)(G) "TLI OPERATIONAL TEST"
3.9 Accomplish an operational test of the TLI system for each tank listed in 1.3 using 2.2 for guidance.
3.10 Provide 115 man-hours of labor and 1,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hour and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.11 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish
4.2 Tank repairs will be accomplished under work item 123-19-003, Vacuum Collection Holding Tank; repair
4.3 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: TPPC-DDG102-NWRMC18-CN01 4 of 4 ITEM NO: 123-19-004
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
JENSEN, JOHN
ARMSTRONG, RUSSELL
LEE, LOUIS
NIMMICH, KENNETH
RICHEY , DARYL
SALARDA, SALVADOR
THEESFELD, BRANDON
SAFE FOR HOT WORK CERTIFICATE
SHIP: USS SAMPSON (DDG 102) ITEM NO: 123-21-001
COAR: 16 PCN: ER01-ZA95
ER01-ZA93
ER01-ZA94
ER01-ZA96
CSWT FILE NO: 123-117 (DDG 51) CMP: Q-12322-A0T
REVISED: 17 Apr 2017 PLANNER: THEESFELD, BRANDON
ARMSTRONG,
RUSSELL
BIRDSELL, JOSEPH
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 3 ITEM NO: 123-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Accessible Void; repair
1.2 Location of Work:
1.2.1 Void (6-31-0-V)
1.2.2 Void (5-34-0-V)
1.2.3 Cofferdam (5-204-1-V)
1.2.4 Cofferdam (5-254-4-V)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 165-7026408 Rev G, Unit Strl Arr Dwg Assy Unit 1210
2.3 100-7026662 Rev E, Unit Strl Arr Dwg Assy Unit 1220
2.4 100-7026682 Rev L, Unit Structural Arr Dwg Assy Unit 2210
2.5 100-7026687 Rev J, Unit Structural Arr Dwg Assy Unit 2310
2.6 100-7026413 Rev L, Unit Strl Arr Dwg Assy Unit 2410
3. REQUIREMENTS:
3.1 Accomplish the following repair in each void/cofferdam in 1.2 as designated by the SUPERVISOR.
3.1.1 Vee-out and weld 11 linear feet of deteriorated and damaged welds. Each area of repair shall include deck, bulkhead, shell plating, and overhead of each space listed in 1.2.
3.1.2 Chip and grind each surface flush in way of repairs.
3.1.3 Accomplish base metal weld buildup for a combined total of 144 square inches of plating defects in the void/cofferdam listed in 1.2, SSP: TPPC-DDG102-NWRMC18-CN01 2 of 3 ITEM NO: 123-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
using 2.2 through 2.6 as guidance.
3.1.3.1 Verify each surface is ground to sound metal prior to base metal weld buildup.
3.1.3.2 Fill each local pit and groove with weld material prior to application of principal build up layers.
3.1.3.3 Buildup shall be limited to areas reduced by 25 percent, but not greater than 45 percent of original material thickness.
3.1.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.
3.1.4 Remove existing, fit and install new a combined total of 8 square feet of deteriorated plating for the void/cofferdam listed in 1.2, using 2.2 through 2.6 as guidance.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A or B, Lines One through 7.
3.2.1 Accomplish nondestructive testing in accordance with line 11.
3.3 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seams. Allowable leakage: None.
3.4 Repairs and materials less than the amounts identified, and not accomplished in 3.1 through 3.3 will be subject to recoupment.
(E4)
3.5 Provide 200 man-hours of labor and 3,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized man-hours and dollar amounts, remaining funds will be subject to recoupment.
The contractor is not authorized to exceed these limits.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 Use work item 042-11-001, Accountability of Manhour and Material Reservation for tracking of Manhour and Material Reservations.
4.2 Tank cleaning will be accomplished under work item 123-00-001, Tank and Void Open, Pump, Clean and Gas Free; accomplish.
4.3 Preservation of void will be accomplished under work item 123-22- 002, Accessible Void; preserve.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
SSP: TPPC-DDG102-NWRMC18-CN01 3 of 3 ITEM NO: 123-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: USS SAMPSON (DDG 102) ITEM NO: 150-11-001
COAR: 16 PCN: ES01-NA72
ES01-NA5Y
CSWT FILE NO: 150-001 (DDG 51) CMP: NONE
REVISED: 08 Oct 2016 PLANNER: BUTTS, NATHANIAL
ARMSTRONG,
RUSSELL
RICHEY , DARYL
SSP: TPPC-DDG102-NWRMC18-CN01 1 of 2 ITEM NO: 150-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Deck Structural Repair; accomplish
1.2 Location of Work:
1.2.1 04 Level, Frame 130-180 Port and Starboard
1.2.2 03 Level, Frame 142-193 Port and Starboard
1.2.3 Void, Bridge Wing, Startboard Side
1.2.4 Void, Bridge Wing, Port Side
1.3 Identification:
1.3.1 Quantity (30 Square Feet), Plate MIL-S-22685 GR DH-36, 5/16 Inch Thick, to replace deck plating located in 1.2.
2. REFERENCES:
2.1 Standard Items
2.2 150-7026718 Rev K, Unit Strl Arr Dwg Assy Unit 4230
2.3 150-7026723 Rev J, Unit Strl Arr Dwg Assy Unit 4320
2.4 110-8570464 Rev B, Shipalt DDG-51-AER83007 Increase Deck Plate Thickness Modifications
3. REQUIREMENTS:
(V) "UNOBSTRUCTED FLOW TEST"
3.1 Accomplish an unobstructed flow test of each drain located in 1.2.
Report: UNOBSTRUCTED FLOW TEST SITUATIONAL + 3 days
3.1.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.1 to the SUPERVISOR.
3.2 Drain each void identified in 1.2.3 and 1.2.4 in the locations listed in 1.2.
3.2.1 Dispose of liquids in accordance with federal, state and local laws, codes, ordinances or regulations.
(V)(G) "VISUAL INSPECTION"
SSP: TPPC-DDG102-NWRMC18-CN01 2 of 2 ITEM NO: 150-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Accomplish a visual inspection of each location listed in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion using 2.2 and 2.3 for guidance.
3.3.1 Submit one legible copy, in approved transferrable media of a report listing results of the requirements of 3.1 3 to the
SUPERVISOR.
(E4)
3.4 Remove existing and install new deck plating identified in 1.3, located at 1.2, using 2.2 through 2.4 for guidance.
3.4.1 Template exact size, configuration, and location from existing shipboard condition.
3.4.2 Remove existing and install up to a total of 30 square feet of plate, as designated by the SUPERVISOR, in the locations listed in 1.2, using 2.4 for guidance.
3.4.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
3.4.4 Chip and grind surfaces flush and smooth in way of repairs.
3.5 Accomplish the requirements of 009-25 of 2.1 for an air hose test of each repair accomplished in 3.3 and located in 1.2 Allowable leakage:
None.
(V)(G) "UNOBSTRUCTED FLOW TEST"
3.6 Accomplish an unobstructed flow test of each drain located in 1.2.
Allowable obstructed flow: None
3.7 Preserve the interior surfaces of each void listed in 1.2.3 and
1.2.4 with rust preventative compound conforming to MIL-PRF-16173, Type 2, Class 3 by completely filling and draining. Ventilate to remove solvent vapors.
3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS SAMPSON…