J-16_CDRL_A015_GFP_Deficiency_Report.pdf

PDF 159 KB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0015.pdf PDF
N4523A-18-R-0550_Amendment_0013.pdf PDF
USS_Sampson_IMO_IMS_J._Fagnant_2017-12-12.pdf PDF
BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx PPTX presentation
N4523A-18-R-0550_Amendment_0010.pdf PDF
182-8749113_Rev_A,_HYBRID_ELEC_DRIVE_HULL_OUTFIT,_STRUCT_&_FDN_MODS_&_ML.pdf PDF
BQ_028_980-90-007_clarification_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0009.pdf PDF
644-8718346-ARR03_REV-A_SANITARY_ARR_MODS.pdf PDF
512-8718344-VENT10_REV-A_BERTHING_VENT_MODS.pdf PDF
331-8718345-ELEC30_REV-A_BERTHING_ELEC_MODS.pdf PDF
BQ_005_437-012-001_Missing_Drawings_-_Redacted.pdf PDF
BQ_016_588-21-001_-_Redacted.pdf PDF
BQ_019_123-10-001_-_Redacted.pdf PDF
BQ_009_Clarification_-_Redacted.pdf PDF
BQ_21_123-21-001_-_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0006.pdf PDF
N4523A-18-R-0550_Amendment_0005.pdf PDF
BQ_012_123-00-001_-_Answered_1-11-18_Redacted.pdf PDF
J-1_Work_Package_Errata_5_-_Addendum_1.pdf PDF
BQ_002_J-2_Drawings_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_008_-_Answered_09JAN18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_015_Map_2.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_013_Map.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_015_Map_3.pdf PDF
J-16_CDRL_A025_Compt_Closeout_Sched_Rprt.pdf PDF
Resource_Conservation_and_Recovery_Act,_(RCRA).pdf PDF
NFPA_30,_Flammable_and_Combustible_Liquids_Code.pdf PDF
J-15_PPQ.doc DOC document
J-16_CDRL_A007_Quality_System_Plan.pdf PDF
NFPA_701_Rev_15,_Fire_Tests_for_Flame_Propagation_of_Textiles_and_Films.pdf PDF
J-16_CDRL_A002_Condition_Found_Report.pdf PDF
59312-3-010A_VCHT_System_Operational_Test.pdf PDF
J-16_CDRL_A001_Production_or_Delivery_Problem(s).pdf PDF
J-16_CDRL_A017_Accountability_of_Temp_Blanks.pdf PDF
J-16_CDRL_A003_GFM_CFR.pdf PDF
NAVMED_P-5010-1_Manual_of_Naval_Preventive_Medicine,_Chapter_1,_Food_Safety.pdf PDF
UFC-4-152-01,_Unified_Facilities_Criteria_(UFC),_Design_Piers_and_Wharves.pdf PDF
DDG_102_SRA_3-2015_Final.pdf PDF
J-18_Access_and_User_Agreement.docx DOCX document
J-16_CDRL_A033_Logistics_Mgmt_-_Process_Memo.pdf PDF
MIL-STD-419E.pdf PDF
NFPA_70,_National_Electrical_Code.pdf PDF
J-16_CDRL_A034_Technical_Report_-_Configuration.pdf PDF
J-16_CDRL_A009_Work_Completion_Certification.pdf PDF
J-8_Contractor_Proposal_Guide.pdf PDF
J-16_DIDs_Package.pdf PDF
59312-3-005_Rev_A,_VCHT_Tank_Level_Indicator_Sensor_Test.pdf PDF
J-9_Env_Guide_For_Contractors_at_NSE_-_May16.pdf PDF
J-19_Contractor_FRP_Matrix.xlsx XLSX spreadsheet
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A015
title: Deficiency Report (DR)
sub: Government Furnished Property
auth: DI-ALSS-81535A
ref: SOW para 1.0
req_ofc: PSNS&IMF, C/451
dd250: LT
appcode: NA
dist: D(SEE BLK16)
freq: ASREQ*
asof: SEE BLOCK16
firstsub: SEE BLOCK16
subsub: SEE BLOCK16
addressee1: PSNS&IMF, C/451
draft1: 0
reg1: 1
repro1: 0
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: BLOCK 9: “DISTRIBUTION STATEMENT D. Distribution authorized to the

Department of Defense and U.S. DoD contractors only for Administrative or Operational use (July 2017). Other requests shall be referred to PSNS&IMF, C/451, Everett, WA 98207

BLOCK 10, 12 and 13: Submit report within 2 days after inspection, and within 5 days after the discovery of loss, damage, destruction, or theft of Government Property.

BLOCK 14: Media requirement. The report shall be delivered electronically to the Navy Maintenance Database (NMD) as specified in the Contract.

group:
total_price:
prep_name: Friedrich E. Freier
line_item: CLIN 0001
exhibit: A
xtdp: Off
xtm: Off
othercat: PSSS
system: SUPPLIES/SERVICES
ctr_no: N4523A-18-R-0550
contr: TBD
remarksb:
Page2: 2
Reset:
2017-07-26T13:55:37-0700
FREIER.FRIEDRICH.E.1047723244
prep_date: 7/26/2017
app_by:
2017-07-28T07:15:01-0700
TIEMEYER.JOHN.DAVID.1044537105
app_date: 7/28/2017
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it.