Response 3 doc.doc
DOC document 877 KB Posted
- Attached to
- SOLICITATION USNS SUPPLY ROH Federal contract opportunity
- Solicitation number
- N3220522R4254
About this file
This document contains questions and responses related to a solicitation for ship repair and maintenance work on the USNS Supply. The questions seek clarification on specification items including fire and smoke detection systems, chemical handling tank piping repairs, various piping repairs, and an unrep receiving station repair. Responses provide additional details such as pipe sizes and fittings from engineering drawings, verification that photo documentation corresponds to the specified level, and pictures clarifying flange connections and pressure ratings. No direct pricing or award information is included.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
1. SPECIFICATION ITEM NO.: 0569
PARAGRAPH / SECTION NO:
TITLE: FIRE AND SMOKE DETECTION AND ALARM SYSTEMS (1YR)(SCSI)
QUESTION: We have been notified by CONSILIUM SAFETY that the system installed on the USNS SUPPLY is no longer supported with parts. An upgrade is recommended. Is this the direction that the Government would like to have priced?
ANSWER: No this is not the direction. WI changes will be handled via change order if required.
2. SPECIFICATION ITEM NO.: 0514
PARAGRAPH / SECTION NO: 3.1, 3.2 & 7.1.6
TITLE: CHT Piping Repairs Rev 30AUG2021
QUESTION: Please provide pipe size, footage & the amount of fittings required per paragraph.
ANSWER: Requested information is in WI specified DWG. Please see image below.
3. SPECIFICATION ITEM NO.: 0535
PARAGRAPH / SECTION NO: 3.1.1 through 3.1.5, 7.3.3 & 7.5
TITLE: PIPING REPAIR VARIOUS
QUESTION: Please provide pipe sizes, footages & the amount of fittings required per para. 3.1.1 through 3.1.5.
ANSWER: Requested information is located in the WI specified DWG.
4. SPECIFICATION ITEM NO.: 0535
PARAGRAPH / SECTION NO: Para. 2.1.1
TITLE: PIPING REPAIR VARIOUS
QUESTION:
1) PARAGRAPH 2.1.1 FIRE MAIN REDUCING ELBOW. Is the reducing elbow 8” to 6”? Is there a flanged connection? If so, are the flanges RFSO, 150 psi?
2) Note 34 references drawing 804 – 1385916 can this be provided?
3) Can pictures of all required work be taken and supplied?
ANSWER: Reducing elbow is 8” to 6”. Additionally, see attached pictures below clarifying flange connection, RFSO and psi requirement. Note (34), and question 3 are addressed as well.
5. SPECIFICATION ITEM NO.: 0548
PARAGRAPH / SECTION NO: 3.1
TITLE: UNREP RECEIVING STATION REPAIR-DFM Rev 1 QUESTION: Paragraph 3.1 states that the work is located on the 01 level but the pictures supplied seem to be of the 02 level. Can the 01 level be verified?
ANSWER: Pictures in the WI are on the 01 Level Main deck.
ATTACHMENT J - 8