N3220522R4254 AMEND 0014 USNS SUPPLY ROH AP.docx

DOCX document 58 KB Posted

Attached to
SOLICITATION USNS SUPPLY ROH Federal contract opportunity
Solicitation number
N3220522R4254
Issued by
Department of the Navy Military Sealift Command

About this file

This document provides details for a solicitation to perform regular overhaul and dry-docking work on the USNS Supply (T-AOE 6). The solicitation was issued by the Department of the Navy Military Sealift Command.

The scope of work includes various structural repairs and replacements, machinery maintenance and overhauls, electrical system testing and cleaning, electronics equipment servicing, auxiliary equipment inspections, habitability upgrades, heating and air conditioning work, docking and hull preservation activities, and refueling and replenishment system maintenance. The contractor will be responsible for management, quality control, and oversight of any subcontracted work. The period of performance is 120 calendar days starting on or around September 21, 2022 at a contractor facility on the U.S. East Coast. The solicitation includes a list of over 100 individual work items covering different systems and specialties.

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION USNS SUPPLY ROH, newest first.
File Type Posted
N3220522R4254 Amend 0013 .docx DOCX document
N3220522R4254 MOD 11 AP.docx DOCX document
N3220522R4254 AMEND 0011 APPROVEDdocx.docx DOCX document
N3220522R4254 AMEND 0012 APPROVEDdocx.docx DOCX document
N3220522R4254 AMEND 008 USNS SUPPLY COA.docx DOCX document
N3220522R4254 Amend 007 USNS SUPPLY COA.docx DOCX document
N3220522R4254 AMEND 0006 USNS SUPPLY ROH AP.docx DOCX document
N3220522R4254 AMEND 005.docx DOCX document
N3220522R4254 USNS SUPPLY AMEND 4 .docx DOCX document
Approved N32205R4254 AMEND 004 Approved.docx DOCX document
Response 3 doc.doc DOC document
Solicitation Amend 003 LGA.docx DOCX document
J - 2 Category A Items SUPPLY(Rev 2).xls XLS spreadsheet
USNS SUPPLY RFC .docx DOCX document
USNS SUPPLY AMEND 002 LGA.docx DOCX document
J-1 WI SPECIFICATION UPDATED USNS SUPPLY.doc DOC document
SUPPLY 2022 JUL ROH DD GFP J4 VerS 2.1.xlsx XLSX spreadsheet
J-4 UPDATE SUPPLY 2022 JUL ROH DD GFP J4 VerS 2.1.xlsx XLSX spreadsheet
UPDATE 0090_A_LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES 30DEC21.docx DOCX document
J - 10 Update Interport Differential USNS SUPPLY WORD.doc DOC document
AMEND 0001.docx DOCX document
RE-dacted JA N32205-22-R-4254 Combined USNS SUPPLY ROH DD 2.pdf PDF
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 10 Interport Differential WORD.doc DOC document
J 3 Category B Items SUPPLY.xls XLS spreadsheet
Solicitation N3220522R4254 USNS SUPPLY.docx DOCX document
J-4 (1) Requisition Items.docx DOCX document
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 12 Past Performance Data.doc DOC document
J - 2 Category A Items SUPPLY.xls XLS spreadsheet
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220522R4254

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

NEW WORK ITEM ADDITION

1. New Work Item 0522, UPTAKES FLUE CLEANING, INSPECTION AND REPAIR

USNS SUPPLY

(T-AOE 6)

MACHINERY, AUXILIARY SYSTEMS
N32205-22-R-4254

2 MAY 2022

ITEM NO.0522
CATEGORY “A”
MSC/N756/DRM

UPTAKES FLUE CLEANING, INSPECTION AND REPAIR

1.0 ABSTRACT:

1.1. This Item describes the requirements for inspecting, cleaning, and repairs to various areas of the, SSDG engines exhaust flue and uptakes.

2.0 REFERENCES:

2.1. NAVSEA Drawing 085-6362912, Booklet of General Drawings.

2.2. NAVSEA Drawing 500-6362653 (Rev E); Composite Arrangement Main Machinery Room 2 Uptake Space A2-165, 266, 318, 360, & 398.

2.3. NAVSEA Drawing 500-6362652 (Rev G); Composite Arrangement Main Machinery Room Uptakes Space A2-129, 237, 267, 305, & 343.

2.4. NAVSEA Drawing 342-6360601; SSDG and Incinerator Exhaust Diagram

3.0 ITEM LOCATION/QUANTITY/DESCRIPTION:

3.1. Locations: See References 2.1 thru 2.6 for details:

3.1.1. SSDG Engines #3 and #5, Exhaust Flue Uptakes

3.2. Quantity/Description: See References 2.2 thru 2.5 for details:

3.2.1. All exhaust flues uptakes listed in 3.1 include:

a. Flue pipes from SSDG exhaust discharge up through flue termination point at top of ship's stacks.

b. Expansion Joints, expansion bellows, Resonators, and Mufflers.

c. Supports, stiffeners, collars, and misc. fasteners and hardware.

d. Flue access ports and manholes.

e. Lagging, Insulation, and lagging pads and lagging blankets.

f. Seals, gaskets, deck and bulkhead pass-through joints and stuffing glands .

g. Paint Coating Systems.

4.0 4.0GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 5.0NOTES:

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2. The contractor and all subcontractors, regardless of tier, are advised to review

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Temporarily provide staging, lighting, and ventilation, as required, to accomplish the requirements of this work item. Remove same upon completion of all work.

7.2. Make all temporary removals of any interference necessary to accomplish work in this work item. Interference removals shall be reinstalled after completion of work, in original locations where removed. Temporarily remove access plates, expansion joints, uptake sections, or manhole covers where required to access flue interior for inspection and cleaning Reinstall access plates, manholes, expansion joints, uptake sections, using new gaskets and fasteners, upon completion of work.

7.3. Accomplish a preliminary inspection of all areas listed in 3.0. as described below Submit "as-found" condition report, with recommended repairs and quantities. Report to be submitted no later than A-15.

7.3.1. For bidding purposes: Assume 700 cubic feet of block insulation renewal, and 800 Square Feet of lagging pads is required in various areas, per MSCREP direction.

7.3.2. Inspect Exterior of Exhaust Flue Uptake, lagging, insulation, and lagging Blankets for damage. Note all deteriorated areas by specific location, type, quantity, and recommended repair.

7.3.3. Inspect Lagged areas for signs of Exhaust leaks, and areas of deteriorated insulation.

7.3.4. Inspect exterior flue supports, attachments, hardware, and fasteners. Temporarily remove lagging pads and insulation blankets to facilitate inspection.

a. Removal of hard lagging around flue supports that are hard-lagged is not required, contractor shall access condition and report if deteriorated

7.3.5. Inspect bulkhead and deck pass through collars, seals, and glands. Temporarily remove lagging pads and insulating blankets to facilitate inspection.

7.3.6. Inspect all mechanical joints, and expansion joints Temporarily Remove lagging pads and insulation blankets to facilitate inspection

a. Inspect mechanical joints, expansion joints and expansion bellows for loose, missing or damaged hardware. Inspect for signs of gasket failure. Inspect for signs of leakage.

b. Weld repair cracking on exhaust bellows assemblies. For Bidding purposes estimate six areas shall require welding around the circumference of the bellows.

7.3.7. Inspect interiors of each flue uptakes, using video bore scope process. Submit inspection results to MSCREP on video (DVD).

7.3.8. Prior to installing insulation or lagging, prep, prime, and paint joints and exposed surfaces with two coats of low emission heat resistant aluminum paint (suitable for service to 1200 degrees Fahrenheit).

7.4. Upon completion of authorized repairs, reinstall ALL removed insulation, lagging pads, and lagging blankets not being replaced.

7.5. Accomplish interior exhaust flue cleaning of the SSDG engines identified in 3.0, from the engine exhaust discharge to top of flue termination point outside ship's stacks.

7.5.1. Contractor shall provide the services of a qualified Exhaust Flue Cleaning (Chimney Sweep) Company to accomplish interior cleaning of exhaust flue uptakes listed in paragraph 3.0.

7.5.2. Final inspection of interior surfaces shall be done using video bore scope. Work shall be accomplished to the satisfaction of the MSFSCREP.

7.6. Renew disturbed or missing fasteners resulting from work accomplished in this work item. Renew seals, gaskets, and glands that are disturbed as a result of work accomplished in this work item.

7.7. Painting: Paint new and disturbed surfaces to match surroundings

7.8. Preparation of Drawings: None Additional.

7.9. Manufacturer's Reps: None Additional.

8.0 GENERAL REQUIREMENTS: None Additional.

2. References for New WI 0522 sent via Dod Safe. Specifically:

1. 636060-K

2. 6362652-G

3. 6362653-E

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS SUPPLY (T-AOE 6) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 21 September, 2022. All work shall be completed in no more than 120 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility. Due to operational and national security availability considerations, the location shall be East Coast.

Table 1: List of WIs:

USNS SUPPLY (T-AOE 6)

FY22 3TH QRT ROH/DD

September 21, 2022 - January 19, 2023 Work Item Index N32205-22-R-4254

WI
CAT
ITEM
VR #

0000 GENERAL REQUIREMENTS

0001
NSP
SCOPE GENERAL REQUIREMENTS AND DEFINITIONS
0002
NSP
TECHNICAL AND MANUFACTURERS REPRESENTATIVE
0003
NSP
APPROACH BERTHING AND MOORING REQUIREMENTS
0004
NSP
TESTING AND QUALITY ASSURANCE
0005
NSP
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
0006
NSP
HEAVY WEATHER PLAN
0007
NSP
COLD WEATHER PLAN
0010
A
FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)
0011
A
GENERAL SERVICES FOR SHIP
0012
A
INFORMATION TECHNOLOGY SERVICES 03 AUG 2019
0013
A
PROJECT PLANNING AND PRODUCTION STATUS MR
0014
A
WEIGHT AND MOMENT REPORT
0015
A
ILS GFM
0016
A
FIRE PROTECTION AND SHIPS SAFETY PROGRAM
0017
A
HANDLING SHIPS STORES
0018
A
DELIVERY AND REDELIVERY OF THE VESSEL
0019
A
SHIPBOARD ACCESS AND SECURITY
0020
A
GAS FREE CERTIFICATES (1)
0021
A
CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES
0022
A
MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS
0023
A
HAZARDOUS WASTE DISPOSAL, REV MAY 16
0024
NSP
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY
0025
B
PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY
0026
A
VESSEL FINAL CLEANING
0030
B
CONTINUATION OF SERVICES
0090
A
LEVEL I COVID-19 PREVENTION AND CONTROL SERVICES

100 STRUCTURAL

0101
A
SY SUPPORT FOR ABS CLOSE UP INSPECTION revised
0104
A
02 Winch deck steel replacement
0105
A
HANGER HEAD DECK REPLACEMENT
0106
A
SELF SERVE LAUNDRY DECK REPLACEMENT
VR19-0055
0107
A
Flight Deck Safety Nets Repair NEW DWG 13 MARCH 20
0108
A
CHT TANK MAINTENANCE RECOAT
0109
A
MSD TANK MAINTENANCE RECOAT
VR19-072
0110
A
WEATHERDECK HANDRAIL REPAIR
0111
A
WEATHERDECK DRAIN PIPING REPAIR
0114
A
GAS TURBINE FILTER CAGE MODIFICATION T-ALT 6-18-388
0151
A
ULTRASONIC THICKNESS GAUGING (2.5YR)
0153
A
ABS INTERMEDIATE TANK SURVEY (5YR)
0156
A
FLIGHT DECK PRESERVATION (3YR)
0157
A
POTABLE WATER TANK PRESERVATION
0158
A
TANK PRESERVATION
3 CARGO TANKS

200 MAIN PROPULSION MACHINERY

0201
A
CALIBRATE GAS TURBINE ACCELEROMETERS (2YR)
0205
A
GAS TURBINE INTAKE REPAIRS
0207
A
RRG AND RCC LO SYSTEM RELIEF VALVES AND HOSES (5 YR)
0209
A
RRG AND RCC TEMP REGULATING VALVE OVERHAUL
VR20-001
0210
A
RRG COOLER CLEANING
VR19-0093
0211
A
BLEED AIR REGULATING VALVES (5YR)
VR-19-0096,

0097,0102,0103, VR20-0001

0251
A
WOODWARD GOVERNOR SERVICING (20KHRS)

300 ELECTRICAL

0301
A
STUFFING TUBE REPLACEMENT
0304
A
MULTIPLE CABLE TRANSIT REPAIRS
0305
A
OVERHAUL AND TEST CIRCUIT BREAKERS (10YR)
0307
A
TEST AND CERTIFY AVIATION ELECTRONICS SYSTEM (2.5 YR)
0351
A
SWITCHBOARD CLEANING (2.5 YR)
0352
A
LOAD CENTER CLEANING (2.5 YR)
0353
A
THERMOGRAPHIC SURVEY (1YR)

400 ELECTRONICS

0403
A
OE82 ANTENNA MAINTENANCE (2.5YR)
VR18-0031
0404
A
UHF TRANSCEIVER MAINTENANCE (5YR)
VR18-032
0424
A
DS 60 DOPPLER SPEED LOG Maintenance
0451
A
ANNUAL RADAR INSPECTION
0452
A
ANNUAL ECDIS SERVICE (SCSI)
0453
A
ANNUAL GYRO SERVICE
0454
A
ANNUAL S-VDR RECERTIFICATION
0455
A
ANNUAL RADIO COMMUNICATION EQUIPMENT CERTIFICATION
0456
A
MAGNETIC COMPASS SERVICE (2YR)
0457
A
EPIRB SHORE BASED MANAGEMENT SYSTEM
0458
A
ANTENNA MAINTENANCE (5YR)
0459
A
ECHO SOUNDER SERVICE (2.5 YR)
0460
A
ANNUAL INSPECTION OF MANUAL ALARMS

500 AUX EQUIPMENT

0501
A
Assist Ships Force
0502
A
JLG LIFTING BRIDLES WEIGHT TEST
0503
A
SCBA COMPRESSORI NSPECTION REV SUPPLY
0504
A
SCBA EQUIPMENT ANNUAL INSPECTION REV SUPPLY
0506
A
MACHY SPACE AIR SYSTEM RELIEF VALVE REFURB
0507
A
HPAC COMPRESSOR HOSE REPLACEMENT (5YR)
0508
A
Refurb Cargo Reefer Comp
VR19-0024
0509
A
SW SYSTEM HOSE REPLACEMENT (5 YR)
0510
A
Provide Pallet Conveyor Restoration
0512
A
RENEW NR1 SSDG SALTWATER STRAINER FOUNDATION
0513
B
LAGGING AND INSULATION REPAIRS
0514
A
CHT piping repairsrev 30AUG2021
VR19-0098

VR19-0099

0515
A
SY SUPPORT FOR L3/HARRIS BUILD 27 T-ALT UPS UPGRADE ( PENDING)
0516
A
COMMON LIVING SPACE SPRINKLING SYSTEM (1YR)(SCSI)
VR18-0068
0517
A
AFT STERRING SECURITY BARRIER
VR19-0080-
0518
A
SSDG RESILANT MOUNT CHANGE NR 2 & NR 4
0519
A
Marpol Piping Modification T-Alt 364R
0520
A
SEAWATER STRAINER AND FOUNDATION REPAIR
0522
A
UPTAKE FLUE CLEANING, INSPECTION AND REPAIR
CASREP 22-038
0525
A
FAIRLEAD CONTROLLER INSPECTION
0530
A
Steering Pump Overhaul
0531
A
MISC PUMP AND MOTOR OVERHAUL
0535
A
PIPING REPAIR VARIOUS
ABS
0536
A
Cargo Refrigeration Plenum Repairs
VR18-0156
0537
A
MMR LP/HP AIR COMPRESSOR INSPECTION AND REPAIR
VR19-0022,0026
0542
A
SSDG HMSO CALIBRATION
0548
A
UNREP RECEIVING STATION REPAIR-DFM
VR20-038
0549
A
FIRE AND SMOKE DETECTION EXPANSION
VR18-0119
0552
A
HOSE REPLACEMENT (5YR)
0553
A
STEERING AND RUDDER ANGLE INDICATOR CHECKS
0555
A
INSPECT, TEST, AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (5 YR)
VR21-004
0561
A
GAUGE CALIBRATION (1YR)
VR19-0077,0078
0565
A
FIXED GAS FIRE EXTINGUISHING SYSTEM (1YR)(SCSI)
0567
A
FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1YR)
0568
A
CARGO HOLD SPRINKLER SYSTEM (1YR)
0569
A
FIRE AND SMOKE DETECTION AND ALARM SYSTEMS (1YR)(SCSI)
0570
A
PORTABLE FIRE EXTINGUISHER SYSTEM (1 YR)
0571
A
FIRE AND SMOKE DAMPER SERVICE (1 YR)
0572
A
DEEP FAT FRYER GRILL RANGE HOOD FIRE EXTING SYSTEM (1YR)(SCSI)
0573
A
FIRE HOSES (1YR)
0574
A
FIRE DOORS AND SHUTTERS (1YR)

600 HABITABILITY

0602
A
LAUNDRY EQUIPMENT SERVICE
0603
A
ACCOM LADDERS REFURBISH AND WEIGHT TEST
0604
A
Life Raft Certification
0605
A
READY SERVICE LOCKER OVERHAUL (5YR)
0606
A
CERTIFICATION OF SPIDERMAN BASKETS (1YR)
0607
A
INTERIOR CPC REPLACMENT 30AUG2021
0653
A
ANNUAL RESCUE BOAT AND DAVIT SERVICE
0654
A
RESCUE BOAT AND DAVIT SERVICE (5YR)
0662
A
DEEP FAT FRYER INSPECTION (1YR)

800 HEATING , VENELATION AND AIR CONDITIONING

0801
A
Habitability Space Ventalation Cleaning
0803
A
AXIAL FAN AND MOTOR OVERHAUL
0804
A
MAGAZINE VENTILATION CLEANING (5 YR)
0851
A
ANNUAL GALLEY VENT AND GAYLORD HOOD CLEANING

0900 DOCKING AND UNDOCKING

0901
A
DRYDOCKING AND UNDOCKING VESSEL_2.5 YR
0902
B
DOCKING AND UNDOCKING THE VESSEL
VR20-0024
0905
A
BILGE KEEL EXAMINATION
0906
A
CATHODIC PROTECTION SYSTEM MAINTENANCE
0907
A
CATHELCO PROTECTION SYSTEM PM
0908
A
ZINC RENEWALS
0909
A
DOPPLER SPEED LOG MAINTNENANCE
0910
A
CHAIN AND LOCKER PAINTING
0912
A
CARGO TANK COATING RENEWAL
7 tanks
0918
A
Sea Suction and Discharge Lines (ABS)
0920
A
Anchor Windlass Inspection and Painting
0928
A
SHELL PLATE WELDING AND REPAIR
0929
B
STEEL RENEWEL B-ITEM
0930
B
SHELL PLATE WELDING AND REPAIR (B-Item)
0932
B
ULTRASONIC TESTING B-ITEM
0953
A
Replace Rudder bearings_Sup ROH22
0954
A
RUDDER AND STERN FRAME EXAMINATION (5 YR)
0957
A
PROPELLER CLEAN AND POLISH_ON DOCK (2.5YR)
0959
A
UNDERWATER HULL CLEANING AND PAINTING-NWB(10YR)
0961
A
FREEBOARD PRESERVATION (5 YR)

1000 UNREP/VERTREP

1001
A
QUADRENNIAL_SURVEY_OF_CARGO_BOOMS REV-
1003
A
TOPPING WINCH FDN AND WINCH REFURB
VR19-0063
1004
A
CARGO WEAPONS ELEVATOR - SY SUPPORT (5YR)
1051
A
HP AIR RELIEF VALVE INSPECT AND TEST (2 YR)

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .