RFC QandA 13 Solicitation N3220521R4170.pdf
PDF 127 KB Posted
- Attached to
- ZEUS ROH/DD Federal contract opportunity
- Solicitation number
- N3220521R4170
About this file
This document contains answers to questions from potential offerors regarding solicitation number N3220521R4170 for the regular overhaul and dry docking of the USNS ZEUS (T-ARC 7) for the Department of the Navy Military Sealift Command. The questions and answers clarify the scope of work to include preparation and coating of all exterior structures extending above the main deck, with the exception of the house and continuous hull. All 1,116 gauges and instruments listed in the master list are to be calibrated as part of the work item, with an assumption that 30 may be damaged. Open/close/clean and gas free activities are to be covered under a work item, though the specified item number 021 does not exist in the solicitation. Offerors must comply with all applicable gas-free and tank entry requirements.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N3220521R4170
QUESTIONS AND ANSWERS
The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.
QUESTION: Specification 107, paragraph 3.1
1. The areas that will receive surface preparation and coating are ambiguous, especially as it applies to “APPENDAGE”. This vessel has many exterior structures on the foredeck and aft deck that could be identified as appendages. Are these structures included? Is the trolly rail support structure included? Is any part of the aft “A” Frame included? Are any of the outriggers included? Any more clear description of what is intended to be pepared and coated would be helpful.
ANSWER:
Yes, this includes all structures refered to in the above question. Any appendage that extendend above the deck not including the house or continuous hull are included in scope.
QUESTION: Specification 506, paragraph 7.3
2. How many gauges and instruments are to be addressed? The references and provided lists indicate 1116 gauges. The paragraph in the item, 7.3, says to address 200 gauges. How many spares are there? Is 200 the total number? How many gauges are damaged? Is 30 the total? Is the whole item based on 230 items? Please clarify the item.
ANSWER:
Price to callibate all 1116 on the master list. The 30 gauges are scope assuming some will be damaged but none currently identified. See revised work item.
QUESTION: Specification 506, paragraph 7.3
3. Paragraph 5.5 states that Open / Close / Clean and gas free will be covered under item 021. There is no item 021. Is this paragraph 5.5 to be disregarded?
ANSWER:
In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs, including but not limited to GTRs 1-7,22,25,26 and 29.