J-3 Category B Items Revised.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- ZEUS ROH/DD Federal contract opportunity
- Solicitation number
- N3220521R4170
About this file
This spreadsheet contains Category B line item pricing requirements for the USNS ZEUS (T-ARC 7) Regular Overhaul/Dry Docking solicitation. The Navy's Military Sealift Command is seeking pricing for various services and repairs including physical security, vessel cleaning, ultrasonic gauging, piping and ladder repairs, motor overhauls, structural steel work, and drydocking. Pricing is requested for labor hours and materials with unit rates for specific tasks such as security details, gauging linear footage, and structural steel by pound. Drydocking services are solicited at a daily rate for up to 14 days. The solicitation number is N3220521R4170 and responses are due as indicated in the full solicitation documentation.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS ZEUS (T-ARC 7) FY 22 ROH/DD | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | QTY | UI | Unit Price | Total | ||||||||||
| 7.1 | Cost to Establish Condition Charlie | 1 | DAY | ||||||||||||
| 7.2 | Daily Rate to Maintain Condition Charlie | 1 | DAY | ||||||||||||
| 7.1 | Cost to Establish Condition Delta | 1 | DAY | ||||||||||||
| 7.2 | Daily Rate to Maintain Condition Delta | 1 | DAY | ||||||||||||
| WI 025 Sub-Total | $0 | ||||||||||||||
| 026 | FINAL VESSEL CLEANING | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| Arrangement/outfitting | 1 | DAY | |||||||||||||
| WI 026 Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 30 | DAYS | ||||||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 30 | DAYS | ||||||||||||
| 7.3 | Parent work item 012 “Telephone Services" | 30 | DAYS | ||||||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 30 | DAYS | ||||||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 30 | DAYS | ||||||||||||
| 7.6 | Parent work item 019 "Shipboard Access and Security" | 30 | DAYS | ||||||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 30 | DAYS | ||||||||||||
| WI 030 Sub-Total | $0 | ||||||||||||||
| 026 | FINAL VESSEL CLEANING | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 026 “Vessel Final Cleaning" | ||||||||||||||
| WI 026 Sub-Total | |||||||||||||||
| 108 | ULTRASONIC GAGUING | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.3 | Para 7.3 "Unit Price per 4000 Gauging" | 4,000 | EA | ||||||||||||
| WI 108 Sub-Total | |||||||||||||||
| 112 | KICK PIPES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 8.1.1 | Pipe Diameter (ID) 1” Sch 80 – Height (H) 10” | 3 | EA | ||||||||||||
| 8.1.2 | Pipe Diameter (ID) 3/4” Sch 80 – Height (H) 10” | 3 | EA | ||||||||||||
| 8.1.3 | Pipe Diameter (ID) 11/4” Sch 80 – Height (H) 10” | 3 | EA | ||||||||||||
| 8.1.4 | Pipe Diameter (ID) 2” Sch 80 – Height (H) 10” | 3 | EA | ||||||||||||
| 8.1.5 | MCT Block replacement | 3 | EA | ||||||||||||
| WI 112 Sub-Total | $0 | ||||||||||||||
| 114 | LADDER REPAIRS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 8.1.1 | Parent work in 7.0 | ||||||||||||||
| WI 114 Sub-Total | |||||||||||||||
| 399 | MISCELLANEOUS MOTOR OVERHAUL | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| MOTORS Overhaul/ para 7.3 – 7.4.3 and 7.6 - 7.9.2 | |||||||||||||||
| 2—7 horsepower, up to two each | 2 | EA | |||||||||||||
| 8—15 horsepower, up to two each | 2 | EA | |||||||||||||
| 16—25 horsepower, up to three each | 3 | EA | |||||||||||||
| 26—40 horsepower, up to three each | 3 | EA | |||||||||||||
| 41—60 horsepower, up to one each | 1 | EA | |||||||||||||
| 75—100 horsepower, up to zero each | 0 | EA | |||||||||||||
| MOTORS Rewind/ para 7.4.4.1 – 7.4.4.14 | |||||||||||||||
| 2—7 horsepower, up to two each | 2 | EA | |||||||||||||
| 8—15 horsepower, up to two each | 2 | EA | |||||||||||||
| 16—25 horsepower, up to three each | 3 | EA | |||||||||||||
| 26—40 horsepower, up to three each | 3 | EA | |||||||||||||
| 41—60 horsepower, up to one each | 1 | EA | |||||||||||||
| 75—100 horsepower, up to zero each | 0 | EA | |||||||||||||
| WI 399 Sub-Total | $0 | ||||||||||||||
| 520 | MISCL PIPING REPAIR | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.2 | Price per Linear Foot of Pipe X 300 linear Feet | 300 | FT | ||||||||||||
| WI 520 Sub-Total | |||||||||||||||
| 611 | REPLACE VARIOUS FIRE SAFETY DOORS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 611 | REPLACE VARIOUS FIRE SAFETY DOORS | ||||||||||||||
| WI 611 Sub-Total | |||||||||||||||
| 911 | DRYDOCKING AND UNDOCKING | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 0911 | Submit unit price per day up to a maximum of FOURTEEN (14) days to continue all services in accordance with parent item if directed | 14 | DAY | ||||||||||||
| WI 911 Sub-Total | |||||||||||||||
| 926 | STRUCTURAL STEEL REPAIRS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.2.1 | Miscellaneous bulkheads and decks; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.2 | Shell plating; 4,000 pounds | 4,000 | LBS | ||||||||||||
| 7.2.3 | Shell plating, shaped; 4,000 pounds | 4,000 | LBS | ||||||||||||
| 7.2.4 | Tank bulkheads; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.5 | Tank internals; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.6 | Shell plate framing; 4,000 pounds | 4,000 | LBS | ||||||||||||
| 7.2.7 | Tank top in machinery spaces; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.8 | Machinery foundations in engine room; 1,000 pounds | 1,000 | LBS | ||||||||||||
| '7.2.9 | Floor and intercostals in double bottom tanks; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.10 | Double bottom stiffeners and bulkhead; 1,000 pounds | 1,000 | LBS | ||||||||||||
| 7.2.11 | Machinery foundations on deck; 1,000 pounds | 1,000 | LBS | ||||||||||||
| WI 115 Sub-Total | $0 | ||||||||||||||
| TOTAL CAT B | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||
| ERROR:#REF! | |||||||||||||||
| $0 |
| &"Times New Roman,Regular"&10USNS ZEUS | &"Times New Roman,Bold"&14 |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220521R4170 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .