RFC QandA 11 Solicitation N3220521R4170.pdf

PDF 151 KB Posted

Attached to
ZEUS ROH/DD Federal contract opportunity
Solicitation number
N3220521R4170
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains answers to contractor questions regarding solicitation N3220521R4170 for regular overhaul and dry docking of the USNS ZEUS. Key details include: the Military Sealift Command is soliciting offers for regular overhaul and dry docking services for the USNS ZEUS, including removal and reinstallation of fuel and lube oil, removal and reinstallation of four transducer domes, and covering of domes during blasting and painting. Bidders should plan to offload 100,000 gallons of fuel oil and 7,000 gallons of lube oil for storage, and use replacement hardware as needed for transducer dome reinstallation, to be covered by change order if required.

View the file

Other files for this federal contract opportunity

Other files attached to ZEUS ROH/DD, newest first.
File Type Posted
N3220521R4170-0008.docx DOCX document
Revised J - 11 Dry Dock Evaluation Form.docx DOCX document
N3220521R4170-0007.docx DOCX document
Solicitation Conform Copy 0006.docx DOCX document
N3220521R4170-0006.docx DOCX document
RFC QandA 13 Solicitation N3220521R4170.pdf PDF
Revised 3 J - 2 Category A Items.xlsx XLSX spreadsheet
RFC QandA 12 Solicitation N3220521R4170.pdf PDF
N3220521R4170-0005.docx DOCX document
Revised 3 J - 1 Work Item Index.docx DOCX document
Solicitation Conform Copy 0005.docx DOCX document
N3220521R4170-0004.docx DOCX document
Solicitation Conform Copy 0004.docx DOCX document
Revised 02 J - 2 Category A Items.xlsx XLSX spreadsheet
Revised 02 J - 1 Work Item Index.docx DOCX document
Revised J - 1 Work Item Index.docx DOCX document
RFC QandA 10 Solicitation N3220521R4170.pdf PDF
RFC QandA 9 Solicitation N3220521R4170.pdf PDF
Revised J - 2 Category A Items.xlsx XLSX spreadsheet
N3220521R4170-0003.docx DOCX document
RFC QandA 7 Solicitation N3220521R4170.pdf PDF
RFC QandA 6 Solicitation N3220521R4170.pdf PDF
N3220521R4170-0002.docx DOCX document
RFC QandA 8 Solicitation N3220521R4170.pdf PDF
RFC QandA 5 Solicitation N3220521R4170.pdf PDF
RFC QandA 1 Solicitation N3220521R4170.pdf PDF
J-3 Category B Items Revised.xlsx XLSX spreadsheet
N3220521R4170-0001.docx DOCX document
RFC QandA 3 Solicitation N3220521R4170.pdf PDF
RFC QandA 2 Solicitation N3220521R4170.pdf PDF
Solicitation Confirm Copy 1.docx DOCX document
RFC QandA 4 Solicitation N3220521R4170.pdf PDF
J - 12 Past Performance Data.doc DOC document
J-3 Category B Items.xlsx XLSX spreadsheet
J - 2 Category A Items.xlsx XLSX spreadsheet
J - 7 MSC Ship Repair Facility Survey.docx DOCX document
J-4 GFM List.xls XLS spreadsheet
J - 14 Technical Data Non-Disclosure.docx DOCX document
J - 10 Interport Differential.doc DOC document
J - 8 Request for Clarification.doc DOC document
N3220521R4170 USNS ZEUS.docx DOCX document
JandA Redacted.pdf PDF
J - 11 Dry Dock Evaluation Form.docx DOCX document
J - 9 Disclosure of Lobbying Activities.doc DOC document
J - 13 Past Performance Questionnaire.docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220521R4170

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

QUESTION: Specification 707

1. Paragraph 4.2.1 thru 4.2.3 states the govt. is supplying (2) HiPAP units, (2) HiPAP HPU units and (2) HiPAP valves. The work item does not describe the removal of the HiPAP units and the HPU units.

Paragraph 7.1.8 calls for the (2) valves to be removed, overhauled and reinstalled as per the sea valve work item. Please clarify the work item.

ANSWER:

The valves and statement of work to remove and overhaul the HiPAP valves has been removed. See revised Specification.

QUESTION: Specification 101

2. Please clarify quantities of fuel oil and lube oil that will need to be offloaded and stored.

Bid for 100,000 gallons of fuel and 7000 gallons of lube oil. See revised work item paragraph 7.3.1.

QUESTION: Specification 909, various

3. With reference to answers for questions listed below in RFC QandA 8, the item and answers are not clear as to the work to be accomplished. Please review the question #1 below and provide information referenced. How many domes are to be removed – 7 per paragraph 3.1.2 or 4 per paragraph 7.2.2?

Please advise information for fairing. The answer given in RFC QandA 8 states there are 7 transducers.

Are we to assume there are only 7 total transducers to be addressed in this item or are there 7 domes and 12 transducers? Please clarify this item.

1) Paragraph 3.1.2 states there are 7 transducers with domes but paragraphs 7.2.2 and 7.2.3 state 4 domes. The referenced Docking drawing Plan indicates 6 domes and a large fairing. Please clarify the number of domes to be addressed. If it is just 4 please indicate which domes are to be removed and re-installed.

2) The referenced drawings in paragraph 2.0 do not give a clear indication of the domes, transducer installations and the type and configuration of the hardware that is to be replaced in accordance with paragraph 7.2.5. Drawing 184-5503747 identifies hex head bolts ranging from ¼”-20 to 3/8”-16 then moves to ¾” – 10. There is no indication of any monel ½”-13 x 1-1/2” long counter sunk head screws being used. Please clarify the paragraph 7.2.5.

3) Paragraph 7.2.6 states to cover the domes. If they are removed why is covering necessary?

1) Paragraph 3.1.2 is a list of equipment on board and their location. Paragraph 7.2.2 and 7.2.3 is the requested maintenance so 4 domes to be worked on. The maintenance for each dome is the same do which domes to be worked on will be identified upon dry dock of the ship.

2) Upon reinstallation, contractor can determine if the hardware needs to be replaced and what is required if replacement is necessary. Replacements can be covered by a change order. Contractor should have any hardware identified on the drawing on hand for use.

3) Paragraph 7.2.6 installs protective covers after work complete until undocking so to protect them during blasting and painting. Regardless of when the maintenance occurs they need to be covered when blasting and painting measures are taking place.