J - 11 Dry Dock Evaluation Form.docx
DOCX document 118 KB Posted
- Attached to
- ZEUS ROH/DD Federal contract opportunity
- Solicitation number
- N3220521R4170
About this file
This document contains a drydock evaluation form and solicitation for the USNS ZEUS (T-ARC 7) Regular Overhaul/Dry Docking requirement. The drydock evaluation form provides ship characteristics, drydock capabilities, minimum services required, safety response plans, and certifications. The solicitation from the Department of the Navy's Military Sealift Command seeks a contractor to perform the regular overhaul and drydocking of the USNS ZEUS to include blocking, maintenance, repairs, tests, and certifications while drydocked. Interested offerors are required to read the attached documents and provide the vessel and drydocking experience, accidents, and corrective actions taken over the past five years in order to bid on this solicitation.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSC DRYDOCK EVALUATION FORM
| Ship name: |
| USNS ZEUS |
| Hull No: |
| T-ARC 7 |
PART A (to be completed by MSC)
PART B (to be completed by ALL shipyards)
Drydock Certification / Classification Info
Shipyard name
Drydock No.
Drydock Type Graving |_| Floating |_| Marine Railway |_|
I
Certified? Yes |_| No |_|
Certifying / Classifying Agency
Certificate No.
Date of expiration
| Ship Characteristics |
| English measure |
| Metric measure |
Provide date in English and Metric Units:
| Length, overall |
| 337.9 |
| ft - |
0.0 m
Drydock Characteristics
| Breadth, molded |
| 93.5 |
| ft - |
0.0 m
Length, overall ft-in m
| Draft, light load line |
| 12.85 |
| ft - |
0.0 m
Breadth ft-in m
Gross Tonnage (U. S.)
Tons
MT
| Displacement, Full Load |
| 2460 |
| LT |
MT
Maximum drydock lift capability
LT
MT
Minimum Displacement/Draft
| Displacement |
| 2069 |
| LT |
MT
| Draft - forward |
| 11 |
| ft - |
m
Maximum entry draft rating:
LT
MT
| Draft – aft |
| 11 |
| ft - |
m
| Max stern trim for graving dock |
| 0 |
| ft - |
m
Water depths around dock ft-in m area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/
| Draft - forward |
| 11 |
| ft - |
| 0 |
| in |
| m |
leaving the drydock.
| Draft - aft |
| 11 |
| ft - |
| 0 |
| in |
| m |
Depth Over Floor ft-in m
Positioning Clearances
Comments
Depth Over Blocks ft-in m
Bottom: keel to drydock floor
| ft - |
| 0 |
| in |
| See Docking Plan |
Depth Over Sill ft-in m
Side: hull to drydock wall
| ft - |
| 0 |
| in |
| See Docking Plan |
Depth Over KEEL ft-in m
Loading Pressures
Max block loading
| Tons Per square ft. |
| See Docking Plan |
Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.
Max Block Loading Capability
Blocking Requirements
Block Capability
LT/ft2
LT/m2
| Construction |
| HardWood |
See Docking Plan
Keel & Side Block Information
| Cap material |
| Soft Wood |
See Docking Plan
Construction
| Cap thickness (min) |
| 2 |
See Docking Plan
Cap Material
| Side blocks (e.g., shaped, wedged, etc.) |
| Shaped |
See Docking Plan
Cap Thickness in cm
Block Age
Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in m
Blue Gum, American Rock Elm or Preserved Red Oak.
Width ft-in m
Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock
Length ft-in m
MSC DRYDOCK EVALUATION FORM (cont’d)
PART A (to be completed by MSC)
PART B (to be completed by ALL shipyards)
Provide data in English and Metric units
Minimum Required Services
Electrical power
See Work Item 0011
Minimum Available Services
| AC volts | |
| 450 | |
| VAC | |
| See Work Item 0011 |
Electrical power
| number of phases | |
| 3 |
AC volts
VAC
| amperage (total) | |
| 800 | |
| Amps |
number of phases
| frequency | |
| 60 | |
| Hz |
amperage (total) amps
| number of lines | |
| 2 |
frequency
Hz number of lines
Ground connections
See Work Item 0011
| number | |
| 2 |
Ground connections
| cable size, each | |
| 500,000 | |
| cir mils |
number cable size, each cir mils
Sewage connections
See Work Item 0011
| number | |
| 1 |
Sewage connections
| pipe size | |
| 2 1/2 | |
| inch ips |
number
| capacity | |
| 100 | |
| gals per day |
pipe size inch ips cm capacity gal/day ltr/day
Fire Main
See Work Item 0016
| number of connections | |
| 2 |
Fire Main
| connection size | |
| 2 1/2 | |
| inch ips |
number of connections
| pressure | |
| 125 | |
| Psig | |
| 8.8 | kg per sq cm |
connection size inch ips cm
| capacity | |
| 1,000 | |
| gals per min | |
| 3,785 liters per min |
pressure psig kg/m2 capacity gpm ltr/min
Aux Seawater
See Work Item 0011
| pressure | |
| 100 | |
| Psig | |
| 7.0 | kg per sq cm |
Aux Seawater
| capacity | |
| 600 | |
| gals per min | |
| 2,271 liters per min |
pressure psig kg/m2 capacity gpm ltr/min
Fresh Water
See Work Item 0011
| pressure | |
| 60 | |
| Psig | |
| 4.2 | kg per sq cm |
Fresh Water
| capacity | |
| 100 | |
| gals per min | |
| 378 | liters per min |
pressure psig kg/m2 capacity gpm ltr/min
Compressed Air
See Work Item 0011
| pressure | |
| 125 | |
| Psig | |
| 8.8 | kg per sq cm |
Compressed Air
| capacity | |
| 300 | |
| cu ft per min |
pressure psig kg/m2 capacity cfm ltr/min
Shore Steam
N/A pressure psig
Shore Steam capacity lbs per hour pressure psig kg/m2 capacity lb/hr kg/hr
| High Pressure Water Wash pressure | |
| 3,000 | |
| psig | |
| 211 | kg per sq cm |
High Pressure Water Wash pressure psig kg per sq cm
Safety Response Plans Required
Safety Response Plans Available (circle correct answer)
| Firefighting | |
| Yes | X |
| No | |_| |
| Firefighting |
| Yes |
| No |
| Flooding (accidental) | |
| Yes | X |
| No | |_| |
| Flooding (accidental) |
| Yes |
| No |
| Earthquake | |
| Yes | |_| |
| No | X |
| Earthquake |
| Yes |
| No |
| Typhoon | |
| Yes | |_| |
| No | X |
| Typhoon |
| Yes |
| No |
MSC DRYDOCK EVALUATION FORM (cont’d)
PART C (to be completed by Shipyard if drydock is not certified by IACS or under MIL STD 1625C)
Dockmaster info
Contractor name
Dockmaster name
Certifying Agency
Certificate No.
Years experience
Drydock Insurance Info
| Is Drydock insured? | |
| Yes |_| | No |_| |
Insurer
Policy No.
Amount Insured
Date of expiration
IS SNUBBING NECESSARY?
YES NO
IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
TIDAL RANGE (DIFF. OF M.L. M.H)
CERTIFICATION DATE &
CERTIFIED BY WHOM
LIFT CAPACITY
(std. tons)
TYPE
CRANES SERVING WAY
NO.
AT DROP
OFF
OVER
WAY END
DEPTH OF WATER
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
BUILDING WAYS (M. I. W.)
SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
SHIPYARD AND ADDRESS
Commander (Code M-4E3) Military Sealift Command Washington, DC 20390 NOTE: If survey form has been previously submitted, then enter changes only.
MSC SHIP REPAIR FACILITY SURVEY
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions) DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT RAILROAD CONNECTION (identify)
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
DOCK
NO.
DRY DOCKS (continued) LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
LIFTING CAPACITY
(ton 2,240)
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD) BLOCKS
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
LENGTH
at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON
(FD)
MATERIAL TYPE
Floating--(FD) Graving--(GD) Marine Railway (MR)
DOCK
SERVICES AVAILABLE
(Use abbreviation of service below)
USE
REPAIR/
OUTFIT-
ING
HEIGHT
OF
DOCK
(M.L.W.)
OUT-
BOARD
IN-
BOARD
WATER DEPTH
(M. L. W.)
LENGTH
(actual & usable)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
TYPE
| BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) | DRY DOCKS (means high water) | ||
| MSC SHIP REPAIR FACILITY SURVEY (continued) | SHIPYARD: |
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGT HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE
LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION
LIST TYPES OF WORK NORMALLY SUBCONTRACTED
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
LARGEST EXIT
WIDTH HEIGHT
DIMENSIONS OF
SHOP OR BUILDING
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
PRINCIPAL SHOPS AND BUILDINGS
| SHIPYARD: | |
| MSC SHIP FACILITY SURVEY (continued) |
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
NORMAL
SHIFTS
NORMAL
MAXIMUM
POTENTIAL MAXIMUM
CURRENT
CURRENT
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)
PART D (to be completed by ALL Shipyards)
1. The Offeror shall provide a list of the vessels (and their principal characteristics) drydocked in this drydock over the past 2 years. (Attach a separate page)
| 2. | The Offeror shall describe the nature and cause of accidents experienced by the shipyard in drydocking operations over the past 5 years. The Offeror shall |
| describe corrective action taken or practices implemented to prevent recurrence of accident. (Attach a separate page) |
I hereby certify that the above information is true and accurate.
Name and Title of Shipyard Official
Signature of Shipyard Official
Date
Attachment J – 11
ATTACHMENT J - 11
File details come from the government source that posted it. Updated .