Q_AND_A_Responses_3.pdf

PDF 154 KB Posted

Attached to
USNS RICHARD E. BYRD: REGULAR OVERHAUL and DRY DOCKING (ROH/DD) Federal contract opportunity
Solicitation number
N32205-17-R-4207
Issued by
Department of the Navy Military Sealift Command

About this file

Q&A Response 3

View the file

Other files for this federal contract opportunity

Other files attached to USNS RICHARD E. BYRD: REGULAR OVERHAUL and DRY DOCKING (ROH/DD), newest first.
File Type Posted
Q_AND_A_Responses_10.pdf PDF
N32205-17-R-4207_Amendment_0005.pdf PDF
Q_AND_A_Responses_9.pdf PDF
Q_AND_A_Responses_8.pdf PDF
N32205-17-R-4207_Amendment_0004.pdf PDF
J_-_2_Category_A_Items_Rev.xlsx XLSX spreadsheet
Q_AND_A_Responses_7.pdf PDF
Q_AND_A_Responses_4_revised.pdf PDF
Q_AND_A_Responses_6.pdf PDF
Q_AND_A_Responses_5.pdf PDF
Q_AND_A_Responses_4.pdf PDF
Q_AND_A_Responses_2.pdf PDF
N32205-17-R-4207_Amendment_0003.pdf PDF
J_-_3_Category_B_Items_USNS_RICHARD_BYRD.xls XLS spreadsheet
J_-_2_Category_A_Items_Rev.xlsx XLSX spreadsheet
N32205-17-R-4207_Amendment_0002.pdf PDF
Q_AND_A_Responses_1.pdf PDF
N32205-17-R-4207_Amendment_0001.docx DOCX document
J_Attachments.zip ZIP file
RICHARD_BYRD_FBO_Solicitation.pdf PDF
J-6_BYRD_CDRLS.zip ZIP file
USNS_RICHARD_E_BYRD_J&A.pdf PDF
N32205-17-R-4207_Non-Disclosure_Agreement.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-17-R-4207

QUESTIONS AND ANSWERS #3

The following are answers to questions received from potential offerors. The answers provide clarification only and DO

NOT constitute an amendment to the solicitation.

QUESTION #1:

Work Item 1001 Para. 4.4 states “CONTRACTOR FURNISHED Material (CFM):” even though it falls under the GFM section.

If these items are to be CFM please provide a recommended source to contact for them.

ANSWER:

The materials are to be CFM (Contractor Furnished materials).

The POC for part is Oldenburg:

Oldenburg, Lakeshore

Steve Miller, Aftermarket Supervisor

Office: (906) 776-3140 smiller@lakeshoresys.com

2141 Woodward Ave

Pinksford, MI 49802

QUESTION #2:

Work Item 903 In the Abstract Para. 1.1 states – “Remove the Belzona System in the stern tube and replace with GFE PPG

Product.”

Within Para. 7.17.9 section a & c have the contractor applying Belzona.

Belzona material is CFM, while PPG is GFM.

Please clarify which system the Contractor is required to install.

WI 903 was modified to reflect that Belzona will NOT be reapplied to the Stern Tube.

Rev 3 will be issued to reflect the change.

QUESTION #3:

Work item 560 Para. 3.2.1 Instructs the contractor to use reference 2.1 for a BOM.

Para. 3.2.2 States “Contactor will provide material not supplied by the Government as required. A condition report shall be submitted to the Contracting Officer detailing the material short falls required to install a fully functional system. Contractor will receive approval from the Contracting Officer prior to providing material short falls.”

For estimating purposes is it the intent to use all the materials called out in ref 2.1 or please provide how MSC would like the contractor to estimate.

The intent is to use all the materials called out in ref 2.1. All materials will be Contractor Furnished Material (CFM) as indicated by ref 2.1.

QUESTION #4:

WI 559 Para. 3.2.1 instructs the contractor to use reference 2.1 for a BOM.

Para. 3.3 states “Contactor will provide material not supplied by the Government as required.”

There is no GFM list within the spec or the references.

Please provide the GFM list of materials.

There is no GFM for this WI. Everything will be Contractor Furnished Material (CFM).