Q_AND_A_Responses_3.pdf
PDF 154 KB Posted
- Attached to
- USNS RICHARD E. BYRD: REGULAR OVERHAUL and DRY DOCKING (ROH/DD) Federal contract opportunity
- Solicitation number
- N32205-17-R-4207
About this file
Q&A Response 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_AND_A_Responses_10.pdf | ||
| N32205-17-R-4207_Amendment_0005.pdf | ||
| Q_AND_A_Responses_9.pdf | ||
| Q_AND_A_Responses_8.pdf | ||
| N32205-17-R-4207_Amendment_0004.pdf | ||
| J_-_2_Category_A_Items_Rev.xlsx | XLSX spreadsheet | |
| Q_AND_A_Responses_7.pdf | ||
| Q_AND_A_Responses_4_revised.pdf | ||
| Q_AND_A_Responses_6.pdf | ||
| Q_AND_A_Responses_5.pdf | ||
| Q_AND_A_Responses_4.pdf | ||
| Q_AND_A_Responses_2.pdf | ||
| N32205-17-R-4207_Amendment_0003.pdf | ||
| J_-_3_Category_B_Items_USNS_RICHARD_BYRD.xls | XLS spreadsheet | |
| J_-_2_Category_A_Items_Rev.xlsx | XLSX spreadsheet | |
| N32205-17-R-4207_Amendment_0002.pdf | ||
| Q_AND_A_Responses_1.pdf | ||
| N32205-17-R-4207_Amendment_0001.docx | DOCX document | |
| J_Attachments.zip | ZIP file | |
| RICHARD_BYRD_FBO_Solicitation.pdf | ||
| J-6_BYRD_CDRLS.zip | ZIP file | |
| USNS_RICHARD_E_BYRD_J&A.pdf | ||
| N32205-17-R-4207_Non-Disclosure_Agreement.docx | DOCX document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-17-R-4207
QUESTIONS AND ANSWERS #3
The following are answers to questions received from potential offerors. The answers provide clarification only and DO
NOT constitute an amendment to the solicitation.
QUESTION #1:
Work Item 1001 Para. 4.4 states “CONTRACTOR FURNISHED Material (CFM):” even though it falls under the GFM section.
If these items are to be CFM please provide a recommended source to contact for them.
ANSWER:
The materials are to be CFM (Contractor Furnished materials).
The POC for part is Oldenburg:
Oldenburg, Lakeshore
Steve Miller, Aftermarket Supervisor
Office: (906) 776-3140 smiller@lakeshoresys.com
2141 Woodward Ave
Pinksford, MI 49802
QUESTION #2:
Work Item 903 In the Abstract Para. 1.1 states – “Remove the Belzona System in the stern tube and replace with GFE PPG
Product.”
Within Para. 7.17.9 section a & c have the contractor applying Belzona.
Belzona material is CFM, while PPG is GFM.
Please clarify which system the Contractor is required to install.
WI 903 was modified to reflect that Belzona will NOT be reapplied to the Stern Tube.
Rev 3 will be issued to reflect the change.
QUESTION #3:
Work item 560 Para. 3.2.1 Instructs the contractor to use reference 2.1 for a BOM.
Para. 3.2.2 States “Contactor will provide material not supplied by the Government as required. A condition report shall be submitted to the Contracting Officer detailing the material short falls required to install a fully functional system. Contractor will receive approval from the Contracting Officer prior to providing material short falls.”
For estimating purposes is it the intent to use all the materials called out in ref 2.1 or please provide how MSC would like the contractor to estimate.
The intent is to use all the materials called out in ref 2.1. All materials will be Contractor Furnished Material (CFM) as indicated by ref 2.1.
QUESTION #4:
WI 559 Para. 3.2.1 instructs the contractor to use reference 2.1 for a BOM.
Para. 3.3 states “Contactor will provide material not supplied by the Government as required.”
There is no GFM list within the spec or the references.
Please provide the GFM list of materials.
There is no GFM for this WI. Everything will be Contractor Furnished Material (CFM).