N32205-17-R-4207_Amendment_0002.pdf
PDF 163 KB Posted
- Attached to
- USNS RICHARD E. BYRD: REGULAR OVERHAUL and DRY DOCKING (ROH/DD) Federal contract opportunity
- Solicitation number
- N32205-17-R-4207
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_AND_A_Responses_10.pdf | ||
| N32205-17-R-4207_Amendment_0005.pdf | ||
| Q_AND_A_Responses_9.pdf | ||
| Q_AND_A_Responses_8.pdf | ||
| J_-_2_Category_A_Items_Rev.xlsx | XLSX spreadsheet | |
| N32205-17-R-4207_Amendment_0004.pdf | ||
| Q_AND_A_Responses_7.pdf | ||
| Q_AND_A_Responses_4_revised.pdf | ||
| Q_AND_A_Responses_6.pdf | ||
| Q_AND_A_Responses_5.pdf | ||
| Q_AND_A_Responses_4.pdf | ||
| Q_AND_A_Responses_3.pdf | ||
| Q_AND_A_Responses_2.pdf | ||
| N32205-17-R-4207_Amendment_0003.pdf | ||
| J_-_3_Category_B_Items_USNS_RICHARD_BYRD.xls | XLS spreadsheet | |
| J_-_2_Category_A_Items_Rev.xlsx | XLSX spreadsheet | |
| Q_AND_A_Responses_1.pdf | ||
| N32205-17-R-4207_Amendment_0001.docx | DOCX document | |
| J_Attachments.zip | ZIP file | |
| RICHARD_BYRD_FBO_Solicitation.pdf | ||
| J-6_BYRD_CDRLS.zip | ZIP file | |
| USNS_RICHARD_E_BYRD_J&A.pdf | ||
| N32205-17-R-4207_Non-Disclosure_Agreement.docx | DOCX document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. Solicitation is being amended for the follow ing:
a. Cancel Work Item 0802 - Laundry Exhaust Duct Cleaning.
b. Add Work Items 0290 - MDE No. 1 and No. 4 12000 hr Maintenance, 0435 - ECDIS Upgrade, 0440 - NAVMACS II Upgrade (T-ALT 454), 0525 - Sounding Tube Cap Replacement, 0565 - Planetary Gear Replace and Refurb, 0575 - Incinerator Tech Assist, 0608 - Galley Repairs and 02 Door Replacement, 1004 - ASD Fan Motor Overhaul, 1005 - Saddle Winch Motor, 1006 - Winch Control (Controlex) Riser, 1007 - RAM
Accumulator Brackets.
c. Revise Work Items 0511 - Cargo, AC, and Ship Serv, 0620 - Mess Deck Polyspec, 0645 - Galley Oven Replacement, 1050 - Flight Deck and Hanger Deck Nonskid,.
d. Correct J Attachments J-2 & J-3 and update C-2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220517R4207
X 9B. DATED (SEE ITEM 11)
24-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jun-2017
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP-64 NAVAL STATION N
NORFOLK VA 23511
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3220517R4207
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
CATEGORY “A” WORK ITEMS
NOT SEPERATELY PRICED (NSP) REQUIREMENTS
001 Intent, Scope, General Conditions and
Definitions 31 MAR 2017
002 Technical & Manufacturer’s Representative 31 MAR 2017
003 Approach, Berth, and Mooring Reuirements 31 MAR 2017
004 Testing and Quality Assurance 31 MAR 2017
005 Eelctrical Safety Procedures 31 MAR 2017
006 Heavy Weather Plan 31 MAR 2017
007 Cold Weather Plan 31 MAR 2017
010 Furnish Office for OMT 31 MAR 2017 011 Furnish General Services Rev 1 31 MAR 2017
012 Telephone Services Rev 1 31 MAR 2017
013 Project Planning and Production Status 31 MAR 2017
014 Preparation of Weight and Moment Report 31 MAR 2017
015 Integrated Logistics & GFM Support
Requirements 31 MAR 2017
016 Fire Protection and Ship's Safety Program 31 MAR 2017
017 Handling Ships Stores 31 MAR 2017
018 Delivery and Re-Delivery of the Vessel 31 MAR 2017
019 Shipboard Access and Security 31 MAR 2017
020 Gas Free Certificates 31 MAR 2017
021 Clean and Gas Free Tanks, Voids, Cofferdams and Spaces Rev 1 31 MAR 2017
022 Dock Trials and Sea Trials Rev 1 31 MAR 2017
023 Hazardous Waste Disposal Rev 1 31 MAR 2017
024 Physical Security at Private Contractor's
Facility 31 MAR 2017
CATEGORY “B” WORK ITEMS
025 Physical Security at Private Contractor’s
Facility 31 MAR 2017
030 Continutation of Services 31 MAR 2017
SECTION 100 Hull Structures
101 Ballast Tank Zinc Inspection 31 MAR 2017
102 Open Clean and Inspect Goosenecks 31 MAR 2017
105 Deck House Cleaning and Painting
(Near White Blast) Rev 31 MAR 2017
107 Tank Coatings Gray WTR and FD Waste 31 MAR 2017
108 Tank Boundary Testing and Structural Survey (ABS) 31 MAR 2017
109 Hull Survey Support (ABS) 31 MAR 2017
SECTION 200 Main Propulsion
201 Propulsion Motor and Cooler Clean, Inspection and Maintenance 31 MAR 2017
202 MDE Fluid Flexible Connectors
Replacement (5-YR) 31 MAR 2017
203 MDG Flexible Coupling Inspection 31 MAR 2017
205 Annual Automation and Propulsion
Cont Insp and Testing 31 MAR 2017
206 Main Diesel Generator RENK Pedestal Bearing Inspection Rev 2 31 MAR 2017
207 Prop Mtr Pedestal Bearing Insp
208 Annual MDE Control Safety Inspection and Testing 31 MAR 2017
231 MDE Splash Oil and Test Circuit
Mod (T-ALT 381) 31 MAR 2017
242 MDE 1 Through 4 Governor Service 31 MAR 2017
251 Main Diesel Engine Start Air System Flush 31 MAR 2017
252 MDG 1 2 3 4 Start Air System Component
Overhaul 31 MAR 2017
285 Engine Resilient Mount Replacement 31 MAR 2017 290 MDE No.1 and No.4 12000 hr Maintenance 24 MAY 2017
SECTION 300 Electrical
301 Cleaning Main Generators and Propulsion
Control System 31 MAR 2017
302 HV Jumper Cable Replacement (T-ALT 428) 31 MAR 2017
303 HV-SS-Emergency Switchboard Cleaning Rev 1 31 MAR 2017
305 Emergency Switchboard Bus-Tie and EDG Breaker Replacement 31 MAR 2017
306 UPS, PLC, Thermographic, AND Degaussing
Surveys 31 MAR 2017
307 Main Diesel Generator Wiring 350 Accommodation Ladder Winch
Replacement (T-ALT 372) 31 MAR 2017
351 Shipyard Support for UPS
Replacement (T-ALT 434) 31 MAR 2017
352 Cargo Hold Light Switch Install(T-ALT 246) 31 MAR 2017
SECTION 400 Communication and Navigation
402 Antenna system Preventive Maintenance Rev 31 MAR 2017
403 Comms System PM 31 MAR 2017
406 Bridge and Nav Equipment Annuals 31 MAR 2017 409 VHS to DVR (T-ALT 346) 31 MAR 2017
431 500 Doppler Speed Log Replacement(T-ALT 431) 31 MAR 2017
432 ADNS-SFF System Support Rev 1 31 MAR 2017
433 Gyrocompass MK27F Upgrade (T-ALT 348) Rev 31 MAR 2017
435 ECDIS Visionmaster Software and Hardware 31 MAY 2017
440 NAVMACS II Upgrade (T-ALT-16-454) 31 MAY 2017
450 Calibrate Wet Bulb Dry Bulb Thermometer 31 MAR 2017
451 OE-570_ SATCOM Antenna Overhaul 31 MAR 2017
452 Echo Depth Sounder Preventative Maintenance 31 MAR 2017 453 AIS-DGPS Renewal (T-ALT 437) 31 MAR 2017
460 VDR Upgrade (T-ALT 413) 31 MAR 2017
SECTION 500 Auxiliary Machinery Systems
501 Firefighting Inspection and Testing (5-YR) Rev 31 MAR 2017
502 SCBA Annual Inspection Rev 31 MAR 2017
503 SCBA Air Compressor and refill Station
Inspection and Maintenance 31 MAR 2017
504 Cargo Crane 10-YR Retest Survey Hydraulic
Hoses Replacement and Recert 31 MAR 2017
506 EDG Annual Testing and Inspection Rev 31 MAR 2017 509 Distilling Plant Maintenance (5-YR) Rev 31 MAR 2017
511 Cargo, AC, Aand Ship Serv Rrefrig 20K HR
Comp OH Replacement 31 MAR 2017
512 Calibrate and Test Oily Water Separators 31 MAR 2017
514 Relief and Overflow Valve Testing 31 MAR 2017
515 Open and Inspect Air Receivers and
HP Air Flask Rev 31 MAR 2017
516 Sewage System Piping Cleaning 31 MAR 2017
518 Relocate RO Sea Suction(T-ALT 351) 31 MAR 2017
519 Propulsion Shaft Turning Gear
Modification (T-ALT 379) 31 MAR 2017 520 Evap Distilling Plant Dump Line (T-ALT 328) 31 MAR 2017
523 SCBA Cylinder Hydrostatic Testing Rev 1 31 MAR 2017
525 Sounding Tube Cap Replacement (VRR17-003) 31 MAY 2017
527 Brine System Flush 31 MAR 2017
528 Brine and Defrost Pump and Motor Overhauls 31 MAR 2017
551 LTFW Plate Cooler Cleaning and Valve
Replacement 31 MAR 2017
552 HTFW Plate Cooler Cleaning 31 MAR 2017
555 HP Air Isolation Valve Installation 31 MAR 2017
556 Steering Gear Preventive Maintenance
7-10 Year 31 MAR 2017
559 Forward AFFF System Piping Replacement (T-ALT 394) 31 MAR 2017
560 MMR AFFF System Piping
Replacememnt (T-ALT 394) 31 MAR 2017
562 Cargo Refrig and AC Plant Expansion 31 MAR 2017
Joint Replacement
565 Planetary Gear Replace and Refurb 31 MAY 2017
570 Tank Level Indicator Repair and Groom 31 MAR 2017
575 Incinerator Tech Assist 31 MAY 2017
SECTION 600 Outfit, Furnishings and Habitability
601 Cargo Hold No 6 Bulk Stowage and Cabinet Space Mods TALT364 31 MAR 2017
602 Accom Ladder Insp and Load Testing (5-YR) Rev 31 MAR 2017
603 Lifeboat Certification and Falls
Renewal (5-YR) Rev 31 MAR 2017
604 Rhib Maintenance and Falls Renewal (5-YR) Rev 31 MAR 2017
605 Liferaft ABS Annual Certification 31 MAR 2017
607 Officers Duty Crew & CPO Mess Stratica
Deck Covering 31 MAR 2017 608 Galley Repairs and 02 Door Replacement 31 MAY 2017
610 Galley Equipment Calibration Rev 31 MAR 2017
615 Exterior Safety Handrails Replacement 31 MAR 2017
620 Mess Deck PolySpec Installation 31 MAR 2017
645 Galley Oven Replacement 31 MAR 2017
652 Deck Tile Replacement 31 MAR 2017
653 State Room Toilet Shower and Laundry
Deck Repair 31 MAR 2017
654 Add Replace Bulkhead Insulation in
06 Level 31 MAR 2017
SECTION 800 Heating, Ventilation and Air Conditioning
801 Galley and Laundry Exhaust Duct Cleaning 31 MAR 2017
851 Install Fan Coils In Engine Room
(T-ALT 210) 31 MAR 2017
852 EOS Air Conditioning Units Install
(T-ALT 360) 31 MAR 2017
853 Air Handler and Fan Coil Unit Cleaning 31 MAR 2017
854 House Accommodation HVAC Duct Cleaning 31 MAR 2017
SECTION 900 Drydocking and Undocking
901 Docking and Undocking 31 MAR 2017
903 Propeller Shaft and Stern Tube Inspection 31 MAR 2017
904 Stern Tube Seal Inspection Overhaul 31 MAR 2017
905 Bow Thruster Maintenance (5-YR) 31 MAR 2017
908 Renew Sea Chest, Rope Guard and BT Zincs 31 MAR 2017
909 Anchor and Anchor Chain Ranging 31 MAR 2017
910 Overhaul Sea Valves 31 MAR 2017
911 Inspect and Repair Cathodic Protection 31 MAR 2017
912 Shaft Grounding System Maint 31 MAR 2017
913 Renew Waster Pieces 31 MAR 2017
915 Underwater Hull Cleaning and Painting 31 MAR 2017
917 Freeboard Cleaning and Painting (Near White Blast) 31 MAR 2017
951 FW Stern Tube Lubrication System
Installation (T-ALT 403) 31 MAR 2017
952 Bow Thruster Tunnel Grating Mod (T-ALT 448) 31 MAR 2017
CATEGORY “B” WORK ITEMS
902 Dry Docking and Undocking Vessel 31 MAR 2017
SECTION 1000 UNREP GEAR
1001 Sliding Block and Transfer Head
Refurbishment- Chain Replacement 31 MAR 2017
1003 Ram Tensioner Upper and Lower Sheave Block Refurbishment and
Ram Packing Replacement 31 MAR 2017
1004 Overhaul ASD Fan Motors and Housing 31 MAY 2017
1005 Saddle Winch Electric Motor Cowl 31 MAY 2017
1006 Winch Push-Pull (Controlex) Cable Winch 31 MAY 2017
1007 RAM Tensioner Bracket 31 MAY 2017
1050 Flight Deck and Hanger Deck Nonskid Renewal 31 MAR 2017
(End of Summary of Changes)