CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0009, 0109, 0209 |
| A |
TDP __ TM ___ OTHER MGMT____
| D. SYSTEM / ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| F/A-18 A/B/C/D AIRCRAFT |
| N00019-15-R-0090 |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A00L |
| Integrated Program Management Report (IPMR) |
| Integrated Master Schedule (IMS) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
SOW Para 3.10.4.1, 3.10.4.4; 3.10.6.1; 3.10.9.1
6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861 (See Block 16)
PMA265
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
REQUIRED
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
14. DISTRIBUTION
XX
| MTHLY |
| See Block 16 |
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Final
A
| N/A |
| See Block 16 |
Draft
Reg
Repro
16. REMARKS
Block 4: DID for reference only. Only IMS portion applicable. The Contractor shall submit a program IMS; using Format 6 of Para. 3.6.7 of DI-MGMT-81861 as a guideline only to include, but not limited to: schedule performance, metrics, task descriptions, values assigned to prime / all sub-contractor planned tasks and a percentage completion estimate for all the authorized work, schedule dates (baseline, estimated, and actuals), days float, predecessors, and successors. The first narrative submission shall provide the basis and assumptions of the IMS
Monte Carlo Schedule Risk Assessments shall be conducted monthly in support of Progress Reports as identified in the PWS.
Monthly submissions shall include a written schedule analysis to identify, document, and communicate changes of 14 calendar days. The Contractor shall also provide work around and / or recovery schedules / plans, and associated impacts due to program changes.
The monthly submission shall include an individual schedule for each of the following programs: F/A-18 A/B/C/D HFH Bulletin Suite inductions with concurrent modifications, F/A-18 A/B/C/D inductions for modifications only, and F/A-18C+ Avionics Upgrade inductions.
The IMS Shall contain the initial T/O and all subsequent T/Os issued.
All submissions shall include:
a. Contract , Task Order, and CDRL number
b. Title and subtitle of the document
c. Program name, supplier and version of software used to generate data
d. Security classification
e. Date of submission
Blocks 8 and 12: The first draft submission is due at the Post Award Meeting. At a minimum the first draft submission shall include reporting to the Intermediate levels. The U.S. Government will provide approval and/or disapproval with comments within 7 calendar days of receipt. The Contractor shall have 7 calendar days to incorporate comments and/ or update the IMS and resubmit to the U.S. Government.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only supporting F/A-18 A/B/C/D Depot Level maintenance support and sustainment capabilities (07 August 2014). Other request shall be referred to NAVAIR, PEO (T) PMA265, NAS Patuxent River, MD 20670.
Block 13: Subsequent submittals are due quarterly (U.S. Government fiscal year quarters), all schedule levels. The U.S. Government will provide approval and/or disapproval with comments within 7 calendar days of receipt. The Contractor shall have 7 calendar days to incorporate comments and/ or update the IMS and resubmit to the U.S. Government.
Block 14: The Contractor shall deliver the IMS electronically to the designated F/A-18 website/server. The submission shall be prepared and delivered in Microsoft Office Project 2007 compatible (non-.pdf) file format. Addresses are identified in Supplement 1 to Exhibits.
| See Block 16 |
| 1 |
| 1 |
| 0 |
15. TOTAL
| 1 |
| 1 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
Chuck Delong
Dave VanLanen
DD Form 1423-1, Jun 90 Previous editions are obsolete Page _1_ of _1_Pages 1007/183