DRAFT CDRL A00L - Integrated Master Schedule (IMS)

View the file

Other files

File Type Posted
Site_Visit_Q As.pdf PDF
Final_RFP_Q As_Vol_3.pdf PDF
CDRL_A00M_-_Contractor_Cost_Data_Reporting.pdf PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
CDRL_A003_-_Program_Plans_-_Ground_Operations.PDF PDF
CDRL_A00L_-_IMS.PDF PDF
Amendment_0001_-_N00019-15-R-0090.pdf PDF
CDRL_A005_-_Program_Plans_-_Aviation_Safety.PDF PDF
Attachment_1_-_Contractor_Depot_Level_Maintenance_Statement_of_Work.PDF PDF
Site_Visit_Request.pdf PDF
A004.PDF PDF
Supplemental_SOW.PDF PDF
L-4_Vol_4_Unit_Price_Matrix.xlsx XLSX spreadsheet
L-2_PPQ_N00019-15-R-0090.docx DOCX document
A005.PDF PDF
L-3_PP-1_Contract_Data.xlsx XLSX spreadsheet
A009.PDF PDF
A00E.PDF PDF
Attachement_11_--_OOMA_Req_Specs.pdf PDF
A00B.PDF PDF
A007.PDF PDF
A002.PDF PDF
A00Q.PDF PDF
A001.PDF PDF
Attachment_10_NAVAIR_NMCI_process_for_DFCs.docx DOCX document
A00P.PDF PDF
A00K.pdf PDF
N00019-15-R-0090_signed_SOW.PDF PDF
FINAL_RFP_N00019-15-R-0090.pdf PDF
Attachment_5B_--_HFH_Inspection_Results_Summary_(Part_2_of_2).xlsx XLSX spreadsheet
A00N.PDF PDF
Attachment_8_DD-254.docx DOCX document
Draft_RFP_Q As_Deferred_Questions_15APR2015.pdf PDF
Attachment_6A_--_PR_Tracking_(Part_1_of_2).docx DOCX document
Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx DOCX document
CDRL_A00C_-_Procurement_Request_Report.docx DOCX document
CDRL_A00M_-___Incurred_Cost_and_Reporting.pdf PDF
CDRL_A00H_-_Cost_Data_Summary_Report_DD1921.docx DOCX document
CDRL_A00D_-_Progress_Reports.docx DOCX document
CDRL_A00G_-_Action_Items _Meeting_Minutes _Presentation_Material.docx DOCX document
CDRL_A00E_-_RFTI.docx DOCX document
CDRL_A008_-_O A_Work_Requests.docx DOCX document
L-7_Vol_4_CSDR.xlsx XLSX spreadsheet
L-4_Vol_4_Unit_Price_Matrix.xlsx XLSX spreadsheet
Attachment_1_--_SOW.docx DOCX document
Attachment_4_--_HFH_Induction_Configurations.xlsx XLSX spreadsheet
Attachment_7_Unit_Price_Matrix_(FFP).xlsx XLSX spreadsheet
Attachment_2_--_Supplemental_SOW.docx DOCX document
Attachment_10_NAVAIR_NMCI_process_for_DFCs.docx DOCX document
Attachment_9_Task_Order_Summary.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0009, 0109, 0209
A

TDP __ TM ___ OTHER MGMT____

D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
F/A-18 A/B/C/D AIRCRAFT
N00019-15-R-0090
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A00L
Integrated Program Management Report (IPMR)
Integrated Master Schedule (IMS)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE

SOW Para 3.10.4.1, 3.10.4.4; 3.10.6.1; 3.10.9.1

6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-81861 (See Block 16)

PMA265

7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

XX

MTHLY
See Block 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Final

A

N/A
See Block 16

Draft

Reg

Repro

16. REMARKS

Block 4: DID for reference only. Only IMS portion applicable. The Contractor shall submit a program IMS; using Format 6 of Para. 3.6.7 of DI-MGMT-81861 as a guideline only to include, but not limited to: schedule performance, metrics, task descriptions, values assigned to prime / all sub-contractor planned tasks and a percentage completion estimate for all the authorized work, schedule dates (baseline, estimated, and actuals), days float, predecessors, and successors. The first narrative submission shall provide the basis and assumptions of the IMS

Monte Carlo Schedule Risk Assessments shall be conducted monthly in support of Progress Reports as identified in the PWS.

Monthly submissions shall include a written schedule analysis to identify, document, and communicate changes of 14 calendar days. The Contractor shall also provide work around and / or recovery schedules / plans, and associated impacts due to program changes.

The monthly submission shall include an individual schedule for each of the following programs: F/A-18 A/B/C/D HFH Bulletin Suite inductions with concurrent modifications, F/A-18 A/B/C/D inductions for modifications only, and F/A-18C+ Avionics Upgrade inductions.

The IMS Shall contain the initial T/O and all subsequent T/Os issued.

All submissions shall include:

a. Contract , Task Order, and CDRL number

b. Title and subtitle of the document

c. Program name, supplier and version of software used to generate data

d. Security classification

e. Date of submission

Blocks 8 and 12: The first draft submission is due at the Post Award Meeting. At a minimum the first draft submission shall include reporting to the Intermediate levels. The U.S. Government will provide approval and/or disapproval with comments within 7 calendar days of receipt. The Contractor shall have 7 calendar days to incorporate comments and/ or update the IMS and resubmit to the U.S. Government.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only supporting F/A-18 A/B/C/D Depot Level maintenance support and sustainment capabilities (07 August 2014). Other request shall be referred to NAVAIR, PEO (T) PMA265, NAS Patuxent River, MD 20670.

Block 13: Subsequent submittals are due quarterly (U.S. Government fiscal year quarters), all schedule levels. The U.S. Government will provide approval and/or disapproval with comments within 7 calendar days of receipt. The Contractor shall have 7 calendar days to incorporate comments and/ or update the IMS and resubmit to the U.S. Government.

Block 14: The Contractor shall deliver the IMS electronically to the designated F/A-18 website/server. The submission shall be prepared and delivered in Microsoft Office Project 2007 compatible (non-.pdf) file format. Addresses are identified in Supplement 1 to Exhibits.

See Block 16
1
1
0

15. TOTAL

1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Chuck Delong

Dave VanLanen

DD Form 1423-1, Jun 90 Previous editions are obsolete Page _1_ of _1_Pages 1007/183