CDRL_A001_-__Program_Plan_-_QA.docx

DOCX document 31 KB Posted

Attached to
Alternative Source -F/A-18A/B/C/D Depot Level Maintenance
Solicitation number
N00019-15-R-0090
Issued by

About this file

DRAFT CDRL A001 - Program Plan - QA

View the file

Other files

File Type Posted
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
Site_Visit_Q As.pdf PDF
Final_RFP_Q As_Vol_3.pdf PDF
CDRL_A004_-_Program_Plans_-_Airfield_Operations _Flight_Planning _and_Flight_Missions.PDF PDF
CDRL_A00M_-_Contractor_Cost_Data_Reporting.pdf PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
PASS_ID_FORM_.pdf PDF
Site_Visit_Request.pdf PDF
A003.PDF PDF
Attachment_9_Task_Order_Summary.xlsx XLSX spreadsheet
Attachment_15_-_CSDR.xls XLS spreadsheet
A00A.PDF PDF
Attachment_3_Cybersecurity_Plan.docx DOCX document
Attachment_6A_--_PR_Tracking_(Part_1_of_2).docx DOCX document
A00L.PDF PDF
Attachment_13_-_Government_Furnished_Property_List.xlsx XLSX spreadsheet
Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx DOCX document
A00C.PDF PDF
A004.PDF PDF
Supplemental_SOW.PDF PDF
L-4_Vol_4_Unit_Price_Matrix.xlsx XLSX spreadsheet
L-2_PPQ_N00019-15-R-0090.docx DOCX document
A005.PDF PDF
L-3_PP-1_Contract_Data.xlsx XLSX spreadsheet
A009.PDF PDF
A00E.PDF PDF
Attachement_11_--_OOMA_Req_Specs.pdf PDF
A00B.PDF PDF
Draft_RFP_Q As_Deferred_Questions_15APR2015.pdf PDF
Attachment_5B_--_HFH_Inspection_Results_Summary_(Part_2_of_2).xlsx XLSX spreadsheet
CDRL_A00P_-_TECHNICAL_REPORT.pdf PDF
CDRL_A005_-_Program_Plans_-_Aviation_Safety.docx DOCX document
CDRL_A006_-_PPIP.docx DOCX document
CDRL_A00A_-_SLEA_Requests.docx DOCX document
CDRL_A00J_-_FUNCTIONAL_COST-HOUR_REPORT_(DD_FORM_1921-1).docx DOCX document
CDRL_A00L_-_IMS.docx DOCX document
CDRL_A002_-_Program_Plan_-_CM.docx DOCX document
Supplement_1_-_Supplement_to_the_Exhibits.doc DOC document
CDRL_A007_-_OPSEC.docx DOCX document
Attachment_11_OOMAServerSpecs.pdf PDF
Attachment_13_-_Government_Furnished_Property_List.xlsx XLSX spreadsheet
L-5_Vol_4_Prime_CCS.xlsx XLSX spreadsheet
Attachment_6A_--_PR_Tracking_(Part_1_of_2).docx DOCX document
Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx DOCX document
CDRL_A00C_-_Procurement_Request_Report.docx DOCX document
CDRL_A00M_-___Incurred_Cost_and_Reporting.pdf PDF
CDRL_A00H_-_Cost_Data_Summary_Report_DD1921.docx DOCX document
CDRL_A00D_-_Progress_Reports.docx DOCX document
CDRL_A00G_-_Action_Items _Meeting_Minutes _Presentation_Material.docx DOCX document
CDRL_A00E_-_RFTI.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0009, 0109, 0209
A

TDP ____ TM ___ OTHER _QCIC__

D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
F/A-18 A/B/C/D AIRCRAFT
N00019-15-R-0090
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

Quality Assurance Program Plan
Program Plan: Quality Assurance (QA)

A001

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-QCIC-81794
SOW Para 3.3.1, 3.3.2.1
PMA265
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

DD

ASREQ
30DAC (See Block 16)

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Final

A

N/A
ASREQ

Draft

Reg

Repro

16. REMARKS

Block 4: Contractor Format Acceptable

All submissions shall include:

a. Contract, Task Order, and CDRL number

b. Title and subtitle of the document

c. Program name, supplier and version of software used to generate data

d. Security classification

e. Date of submission

Block 8: Submission of draft document required. U.S. Government will provide approval and/or disapproval with comments within 30 days of submission. The Contractor shall have 30 days to incorporate comments and resubmit the data to the U.S. Government. Upon re-submittal, the U.S. Government will provide final approval within 30 days.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only supporting F/A-18 A/B/C/D Depot Level maintenance support and sustainment capabilities (07 August 2014). Other requests shall be referred to NAVAIR, PEO (T) PMA265, NAS Patuxent River, MD 20670.

Blocks 10 and 13: Provide change pages as program plan is updated.

Block 12: The Initial submission of the QA Program Plan shall be delivered to the U.S. Government in contractor format NLT 30 calendar days from contract award.

Block 14: The Contractor shall deliver the QA Program Plan electronically to the designated F/A-18 website/server. The submission shall be prepared and delivered in Microsoft Office 2007 compatible (non-.pdf) file format. Addresses are identified in Supplement 1 to Exhibits.

See Block 16
1
1
0

15. TOTAL

1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

Chuck Delong

Dave VanLanen

DD Form 1423-1, Jun 90 Previous editions are obsolete Page _1_ of _1_Pages 1007/183

File details come from the government source that posted it. Updated .