About this file
From the source
LEP SEP Draft
Other files
| File |
Type |
Posted |
| Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf |
PDF |
|
| Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx |
DOCX document |
|
| A006_Presentation_Mod_20170605_FH.doc |
DOC document |
|
| Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx |
DOCX document |
|
| LEP_RFP_Industry_Questions_10_January_2017.pdf |
PDF |
|
| A008_CM_Plan.doc |
DOC document |
|
| A013_Systems_Eng_Mgmt_Plan.doc |
DOC document |
|
| Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx |
DOCX document |
|
| A015_Prod_Drawi_Models.doc |
DOC document |
|
| Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf |
PDF |
|
| A004_Contractor's_Risk_Management_Plan.doc |
DOC document |
|
| Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx |
XLSX spreadsheet |
|
| Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx |
XLSX spreadsheet |
|
| A011_Haz_Mat_Mgmt_Prog_Rpt.doc |
DOC document |
|
| A023_Data_Accession_List.doc |
DOC document |
|
| A016_-_OT-16-20052.pdf |
PDF |
|
| A021_Manufacturing_Plan.doc |
DOC document |
|
| A014_Design_Specification.doc |
DOC document |
|
| A016_Test_Plan_and_Proced.doc |
DOC document |
|
| Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx |
XLSX spreadsheet |
|
| A002_Program_Management_Plan.doc |
DOC document |
|
| A015_Att_1_Encl_1_CDEX.pdf |
PDF |
|
| A022_FRACAS.doc |
DOC document |
|
| A015_Att_1_Encl_2_DFISv1.0.xlsx |
XLSX spreadsheet |
|
| A007_Minute_Minutes.doc |
DOC document |
|
| A012_-_OT-16-20002.pdf |
PDF |
|
| A018_FEMCA.doc |
DOC document |
|
| Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf |
PDF |
|
| Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf |
PDF |
|
| A003_Integ_Prog_Mgmt__IMS.doc |
DOC document |
|
| A012_RTVM_Performance_Spec.doc |
DOC document |
|
| A006_Presentation.doc |
DOC document |
|
| A010_Haz_Mat_Mgmt_Prog_Plan.doc |
DOC document |
|
| A017_-_OT-16-20001.pdf |
PDF |
|
| Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx |
DOCX document |
|
| A019_Test-Inspection_Report.doc |
DOC document |
|
| A001_Contracto_Progress_Statu.doc |
DOC document |
|
| Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf |
PDF |
|
| Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf |
PDF |
|
| A020_QA_Program_Plan.doc |
DOC document |
|
| A017_RTVM_Design_Spec.doc |
DOC document |
|
| Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx |
XLSX spreadsheet |
|
| Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx |
XLSX spreadsheet |
|
| A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf |
PDF |
|
| Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx |
XLSX spreadsheet |
|
| Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx |
DOCX document |
|
| Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf |
PDF |
|
| A009_OPSEC_Plan.doc |
DOC document |
|
| Attachment_L-6_TMSA_-_8_Dec_2016.xlsx |
XLSX spreadsheet |
|
| A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf |
PDF |
|
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .