CALL_0005_Atch_1_-_PWS_(Amendment_0005-01).pdf
PDF 502 KB Posted
- Attached to
- Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) Federal contract opportunity
- Solicitation number
- HTC711-14-R-R003
About this file
CALL 0005 Atch 1 - PWS (Amendment 0005-01)
View the file
Other files for this federal contract opportunity
Show all 50
Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stevedoring & Related Terminal Services
Performance Work Statement for
Military Operations Terminal – 832 nd
Cape Detachment
Port of Operations at
Cape Canaveral, Florida
21 August30 September 2014
Stevedoring & Related Transportation Services Performance Work Statement
TABLE OF CONTENTS
Section Section Topic Page
1.0 Background & Scope 2
2.0 Security 2
3.0 Safety 5
4.0 Contract Administration 5
5.0 Contractor General Requirements 6
6.0 Terminal Specific Requirements 9
Contractor Performance Requirements 21
Appendix A Regulations, Publications, & Forms 22
Appendix B Glossary of Terms 25
Appendix C List of Acronyms & Abbreviations 43
1.0 BACKGROUND & SCOPE
1.1 Background-Military Surface Deployment and Distribution Command (SDDC), headquartered at Scott
AFB, IL is a major U.S. Army Command and a vital component of the U.S. Transportation Command. Since its establishment in 1965, SDDC has played a vital role in our nation’s defense by providing support to every war, major contingency, training exercise and humanitarian relief operation where our military forces have been deployed.
1.2 Scope-Stevedoring and Related Terminal Services
1.2.1. The Contractor shall provide stevedoring and related terminal services and management services in connection with the receipt, processing, and/or loading/discharging of cargo via all conveyances as designated by the Contracting Officer or Contracting Officer’s Representative (COR). The Contractor shall provide sufficient qualified labor, gear and equipment and materials to satisfy the scope of this contract, and make every effort to rectify any shortfall, for which the Contractor will be paid at the applicable commodity or man-hour rates as designated in Section B – Schedule of Services in this contract as requested by the COR.
1.3 Ground Rules and Constraints
1. 3.1 Persons Excluded from the Premises-The Contractor shall not allow a person that has been banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to terminal operations.
1.3.2 Persons with Restricted Duties-The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter those areas.
2.0 SECURITY
2.1 The overall performance classification of this PWS is Unclassified.
2.2 Security Related to Personnel-If the Government notifies the Contractor that the employment or the continued employment of any Contractor employee is prejudicial to the interests or endangers the security of the
United States of America, the Contractor shall make any changes necessary in the appointment(s).
2.3 Personnel working IAW this PWS who do not require IA administrative privileges/ system monitoring capability but do require access to Non-Secure Internet Protocol Router Network (NIPRNET) applications, must successfully complete a National Agency Check with Inquiries (NACI). Favorable NACI investigation results must be posted in the Joint Personnel Adjudication System (JPAS) before a contractor is allowed access to the NIPRNET.
2.4. Personnel not requiring a NACI investigation but require access to the port are required to obtain a
Transportation Workers Identification Card (TWIC). TWIC card are issued from TWIC processing centers in port areas IAW mandatory dates provided from the Captain of the port.
2.5 Once the contract is awarded, all names of the contractor employees needing a CAC, will be submitted to
SDDC for vetting through JPAS to ensure investigative and clearance requirements have been obtained before the start date of the contract. This will be completed prior to the Contracting Officer’s Representative (COR) / Trusted
Agent (TA) submission of contractor employees’ names for the Common Access Card(s) (CAC) in the DoD Trusted
Associate Sponsorship System TASS. If a contractor’s employee does not have the appropriate investigative or security clearance requirement the contractor’s employee will be denied the ability to work in support of this PWS and will not be loaded into the TASS. Contractor employees will be loaded in TASS and have expiration on their
CAC for the initial contract period. Upon approval of each option period a new CAC will be issued with new dates for the subsequent option period only.
2. 6 The contractor shall ensure the roles/privileges assigned to contractor employees on the Government computing platforms are limited to the roles/privileges essential to that individual’s performance of his/her assignments. These roles/privileges can be limited or revoked by the Government for any reason.
2.7 If the Government notifies the contractor that the employment or the continued employment of any contractor employee is prejudicial to the interests or endangers the security of the United States of America, that person shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The company receiving award of this task order shall make any changes necessary in the appointment(s).
2.8 Requirement for Contractor Information Assurance (IA) Report
The Contractor shall provide an Information Assurance Report to describe their environment that safeguards DOD non-public information resident on or transiting the contractor's unclassified information systems from unauthorized access and disclosure. Protection measures applied should consider the risks (i.e. consequences and their probability) of loss, misuse, unauthorized access, or modification of information. The report shall address the SANS
(Sys Admin, Audit, Network, Security) Institute's Twenty Critical Security Controls for Effective Cyber Defense:
Consensus Audit Guidelines (http://www.sans.org/critical-security-controls) and be provided in accordance with the attached template at Attachment 1 to the PWS. The contractor is encouraged to provide additional information above and beyond what is outlined in the SANS guidelines to enhance the government’s understanding of their information security posture. The report will be updated 30 days prior to exercise of an option period, if applicable.
2.8.1 Cyber Security Incidents
2.8.1.1 Reporting Requirements
The contractor shall report to the following two Government organizations as soon as possible upon discovery of any suspected cyber intrusion events that affect DOD information resident on or transiting the contractor's unclassified information systems.
1. USTRANSCOM Global Command, Control, Communications and Computers (C4)
Coordination Center (GCCC)
E-mail: ustcJ6-gccc@ustranscom.mil
Commercial Phone: 618-229-4222
2. USTRANSCOM Deployment and Distribution Operation Center (DDOC)
E-mail: ustc-ddocchief@ustranscom.mil
Commercial Phone: 618-220-7700
Initial report shall be provided even if some details are not yet available, with follow-on detailed reporting within 72 hours. Reportable cyber intrusion events include the following:
1. A cyber intrusion event appearing to be an advanced persistent threat
2. A cyber intrusion event involving data exfiltration or manipulation or other loss of any DOD information resident on or transiting the contractor's, or its subcontractors', unclassified information systems
3. Intrusion activities that allow unauthorized access to an unclassified information system on which DOD information is resident or transiting
Definition of advanced persistent threat: An extremely proficient, patient, determined, and capable adversary, including two or more of such adversaries working together.
2.8.1.2 Incident Report Content
The incident report shall include, at a minimum, the following information:
1. Applicable dates (date of suspected compromise and date of discovery)
2. Threat methodology (all known resources used such as Internet Protocol (IP) addresses, domain names, copies malware, etc.)
3. An account of what actions the threat(s) may have taken on the victim system/network and what information may have been accessed
4. A description of the roles and functions of the threat-accessed system
5. An initial list of potentially impacted government programs and each program’s classification
6. What information may have been exfiltrated that may impact government programs
7. A list of all employees and subcontracted employees who work or have worked with the victim system/network
8. A point of contact to coordinate damage assessment activities
2.8.1.3 Incident Report Submission
The contractor will submit unclassified network cyber incident reports to the USTRANSCOM Technical
Information Analysis Center (TIAC) and USTRANSCOM designated government personnel via encrypted email or another mutually agreed upon secure communications method. Copies of malware require special handling and pre-coordination must be accomplished prior to submission.
3.0 SAFETY
The Contractor must comply with applicable international, federal, state, local, installation and SDDC
Transportation Battalion safety and fire regulations. The Contactor must establish and maintain an effective and comprehensive safety program. The Contractor will support the SDDC battalion’s Emergency Disaster Plan. The
Contractor must acquire, maintain, and require the use of safety equipment, personnel protective equipment and devices necessary to protect employees on the installation, port, and on the vessel.
3.1 Safety-Driver Training
3.1.1 The Government will make available driver training for Government vehicles and related processes/procedures and the Contractor shall coordinate with local labor to attend the Government provided training so that sufficient pools of operators are available to operate Government vehicles, within a port as required.
Government vehicles may include, but is not limited to, all classes of Trucks, Stryker vehicles, Heavy Equipment
Transporters (HETS), Mine Resistant Ambush Protective (MRAP) vehicles and Armored Tracked vehicles. Labor shall participate and Contractor shall be compensated at man-hour rates.
3.1.2 The Contractor shall ensure that personnel operating Government Vehicles possess a valid State Drivers
License. In addition, Contractor personnel who operate Government Vehicles must be trained and qualified to operate varieties of military cargo to include those items listed in 3.1.1. The contractor shall furnish list of qualified drivers by name prior to the start of an operation.
3.1.3 All Contractor personnel who operate U.S Government or Contractor furnished munitions laden vehicles shall possess an approved license with HAZMAT endorsement. The Contractor shall provide the COR with a list of drivers being used each day to handle ammunition. The list will include a statement from the Contractor verifying that the individuals performing driving functions comply with paragraphs above. The Government reserves the right to stop contractor personnel at any time to verify their qualifications against the approved list of personnel scheduled to perform ammunition functions. Personnel found to be in non-compliance will be removed from the handling of ammunition and the incident will be reported to the Contracting Officer as well as in the monthly performance report.
3.2 Safety Briefings-The Contractor shall conduct and document safety briefings for all workers at each shift change and must brief new workers as any new labor is added. The Government will conduct safety briefings when necessary, during which time the labor will be on standby/detention time.
3.3 Safety – Operation of Equipment- Equipment operated by the Contractor for use during operations on any
S&RTS Terminal must be maintained and operated IAW applicable Federal / State laws and regulations, OSHA, Army, port, and terminal regulations, directives, instructions and pamphlets. Damage to cargo or injury related to the use of non-compliant equipment or improper use of equipment will result in immediate non-use of that
Contractor’s equipment until the Contractor takes corrective action. The Contractor must notify the COR when equipment is made compliant.
3.4 Safety – Accident Reporting-The Contractor shall immediately notify the COR verbally, of any accident or incident, which results in death or injury to personnel during or arising from performance under this contract.
In all instances where an accident or incident occur resulting in death or injury, the Contractor shall submit a completed DA Form 285, IAW AR385-40, to the COR within 24 hours of incident. The Contractor shall assist the
Government during any investigation of an accident or serious incident.
4.0 CONTRACT ADMINISTRATION
4.1 Detention, Minimum Time, Differentials
4.1.1 Detention and minimum time, computed to the nearest 5 minute multiple, are payable to the contractor, in lieu of commodity or extra labor (XL) rates specified elsewhere in this contract, at the applicable man-hour rates, subject to the following:
4.1.2 When detention occurs during a commodity operation, the Contractor shall absorb each detention of fifteen
(15) minutes or less. The government shall pay the Contractor at detention rates for persons or gangs, including clerks and equipment operators (drivers) for each detention in excess of fifteen minutes including the first fifteen minutes thereof.
4.1.2.1 Detention shall not be authorized for any part of a gang that is not required on commodity operations or when certain classes of labor on commodity operations are required to stand by because of another class of labor performing a commodity operation. For example, commodity vessel load is inclusive of loading and lashing cargo.
Gangs conducting the load & lash are inclusive of each other under one commodity rate; therefore, drivers or lashers during the process of load and lash may be waiting for the other to perform or complete their job. Neither party will be placed on detention while the other is performing commodity work.
4.1.3 Whenever detention occurs prior to or during extra labor operations, the Government shall pay the
Contractor on a detention rate basis for the time of each detention. In the event part of a gang is required to perform an extra labor operation, the balance of the gang standing by shall be paid for at detention rates. In the event certain classes of labor are required to standby because of another class of labor performing an extra labor operation, such certain classes of labor shall be paid at detention rates.
4.1.4 In accordance with applicable collective bargaining agreements, minimum time shall be payable to the
Contractor when work fails to materialize or when work is completed prior to the minimum time and shall not be payable (i) for checkers working in conjunction with longshoremen until completion of the longshoreman commodity activity; and (ii) for any part of a gang not required on a commodity activity. For example, rail unload operation is inclusive of unlash and unload of cargo under one commodity rate. Lashers finish the unlash portion are still on commodity until the drivers are complete with unload and stage to point of rest. During rail load, after drivers complete the load, they remain on commodity until lashers have completed all lashing. While one portion of the gang is on commodity, all are listed as commodity.
4.1.5 The Contractor must obtain pre approval to work overtime authorized by the COR.
4.2 Contract Labor Reporting-The contractor shall provide as requested by the COR a daily time keeper personnel log book for verification of labor services provided for the day’s operations to use for reconciliation. The breakout will include total quantity by class of service.
4.3 Contractor Manpower Reporting Requirements
4.3.1 The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the SDDC Transportation Battalion via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/
4.3.2 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the
FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: http://www.ecmra.mil/
4.4 Training and Contingency Operations- The Government reserves the right to conduct training and contingency operations for Department of Defense personnel during a scheduled or contingency load or discharge for any vessel operation and related terminal operations. The Contracting Officer or COR will advise the Contractor when such training or contingency operation is scheduled; such notification will be provided to the Contractor as soon as it is known but NLT 48 hours prior to training, contingency or special operation mission. During these training/special operation events, the Contractor shall provide, when requested by the COR, sufficient qualified labor to support DoD personnel during these operations. Such labor, to include operators, flagmen, lashers, mechanic or headers when requested, will be compensated at the man-hour rates established in Section B – Schedule of Rates.
5.0 CONTRACTOR GENERAL REQUIREMENTS
5.1 General duties and requirements of the Contractor are defined within this section. Duties and requirements specific to the particular terminal(s) within the scope of this contact are further defined in Section 6.0 -Terminal
Specific Requirements.
5.2 Contractor services will cover the full spectrum of ocean terminal operations to include discharge and load of vessels, vessel stage/call forward areas including designated areas/facilities for washing and/or fumigation.
Vessels anticipated are Large Medium Speed Roll On/Roll Off (LMSR), Fast Sealift Ships (FSS), MARAD/Ready
Reserve Fleet (RRF), Military Sealift Command (MSC) Controlled or Charted Vessels, Maritime Prepositioned
Ships, Cape Class Vessels, Barges, U.S. Army and Navy vessels, car carrier vessels, combined container/Ro-Ro vessels as well as other vessel types and classes. The Contractor must be capable of handling multiple and simultaneous vessel, operations at each terminal as described in this contract’s Area of Responsibility (AOR).
Contractor will handle various classes of supply to include Ammunition, Hazardous Material, sensitive, controlled, and general DoD cargo.
5.3 The Contractor will inspect for damage and discrepancies and immediately report these items to the COR.
The contractor shall report any damage caused by the contractor, to cargo or vessel, immediately to the COR
5.4 The Contractor shall communicate to the COR any labor shortfalls immediately, and make every effort to rectify the shortfall.
5.5 The Contractor shall provide a dedicated manager to serve as a single point of contact for interface with the government during all daily operations; this includes management presence at away ports during terminal operations as described in Section 6.1 Area of Responsibility.
5.6 The Contractor shall provide a single point of contact on-site for each operation for each shift to the COR.
This individual must have decision-making authority and shall act as the central point of contact. During vessel operations, the Contractor must have stevedore oversight for all gang activity onboard vessels and in staging yards.
If any delay of operation is as a result of stevedore absence on deck or in the staging yard; the delay will be at the
Contractor’s expense.
5.7 The Contractor shall participate in daily operations meetings and shall participate in other meetings regarding vessel load or unload as required. The Contractor shall order labor, material, and equipment based upon agreement with the COR.
5.8 The Contractor shall compare Government reports to Contractor documents and identify discrepancies and recommend reconciliations to the COR.
5.9 The Contractor shall provide a certified point of contact for HAZMAT cargo handling IAW CFR49 Part
172.704(d)
5.10 The Contractor shall acquire and maintain access, and submit man-hour input, to the Cargo & Billing
System (CAB), or its future replacement system, for labor operations within seven (7) days following the billing activity.
5.11 The Contractor shall establish a Quality Control Inspection Plan (QCIP) which will emphasize quality control over all contract requirements. The Quality Control Inspection Plan will contain a Quality Control Inspection
Checklist (QCIC) which, at a minimum, will contain all elements of the Performance Requirements Summary
(PRS).
5.12 Out of Pocket (OOP) Expenses- As related to the support of transportation and cargo and terminal operations, upon the request and approval of the COR, the Contractor shall provide specialized equipment
(examples: floating crane, scissor lifts, generators, light sets, etc.) and supplies reimbursed by the Government at actual costs. Vendor receipt must be provided for reimbursement. Types of supplies include, but not limited to, lumber, placards, straps, shackles, tie wire, clips, fuel for military cargo and GFE (other than commodity operation) and banding material. The Contractor will also provide 3rd party services related to the support of transportation and terminal operations such as port-a-lets used in the operational area and crane orders for extra labor operations .
5.13 Stevedoring and Related Terminal Services (Import)
5.13.1 The Contractor will prepare the vessel for discharge to include the unlashing and physical removal of cargo from the vessel. Inclusive of the vessel discharge commodity rate, the Contractor shall discharge and document cargo (to include capturing linked, nested, and secondary items) of inbound cargo IAW with the agreed upon
Discharge Plan and stage in accordance with the agreed upon Staging Plan (e.g. by type and destination) within time frame established at the cargo meeting between the Contractor and the Contracting Officer’s Representative (COR).
The Contractor shall handle multiple classes of cargo including sensitive, classified, HAZMAT cargo and Reefers in accordance with discharge and stage plan and IAW current applicable regulations. Any changes must be approved through the COR.
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of discharge of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition. The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows; discharge hours may or may not be continuous:
VESSEL TYPE DISCHARGEWORK HOURS
FSS (using shipboard crane) 56
FSS (using port crane) 48
BREAKBULK 72
LMSR (NON-PREPO) 72
RORO 48
CONTAINER SHIP 48
MPS 72
MPS/MAERSK 96
150 to 250 FT BARGE 8
5.13.2 The Contractor shall conduct a reconciliation/validation of the cargo discharged.
5.13.3 The Contractor shall return vessel lashing gear to its proper place (lashing bins and wall racks) and will clean contractor debris prior to vessel departure.
5.14 Stevedoring and Related Terminal Services (Export)
5.14.1 The Contractor shall load cargo on the vessel from its place of rest to point of stow aboard vessel in accordance with the approved vessel pre-stow plan furnished by the Government and within the time frame established at cargo meeting between the Contractor and the COR. The Contractor shall handle all multiple classes of cargo including sensitive, classified, HAZMAT and Reefer Cargo IAW the pre-stow plan. The contractor shall secure cargo IAW SDDC TEA Reference 55-22, Marine Lifting and Lashing. The Contractor shall coordinate all vessel activity with the COR, the vessel master/chief mate, and when applicable with the Military Sealift Command
(MSC) representative. The Contractor shall receive and review expected cargo list and pre-stow plan for accuracy and efficiency of vessel operations and report discrepancies, issues or concerns to the COR
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of loading of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition.
The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows;
discharge hours may or may not be continuous:
VESSEL TYPE LOAD WORK HOURS
FSS (using shipboard crane) 72
FSS (using port crane) 60
BREAKBULK 96
LMSR(NON-PREPO) 96
RORO 48
CONTAINER SHIP 48
MPS 96
MPS/MAERSK 120
150 to 250 FT BARGE 8
5.14.2 The Contractor shall provide documentation using load list and scanner/ PDA that reflects the correct stow location, pay, nested, linked, secondary loads(as requested) and condition of the loaded cargo.
5.14.3 For vessel load and vessel discharge the Government will:
-Provide command and control as Single Port Operator/Manager for SDDC Operations.
-Identify specialized, unique military equipment requiring special handling and coordinate for handling this equipment as required.
-Maintain log book/record of events/time for all operations.
-Provide reports to the Contractor as specified within this contract.
-Compare contractor furnished reports with the Government reports, identify further discrepancies and reconcile them with the Contractor.
-Identify the COR to oversee contract operations.
-Provide a qualified point of contact for HAZMAT.
-Provide ICODES pre-stow plans as specified within this contract NLT 48 hours for review with a revised copy provided NLT 24 hours prior to operation.
-Utilize GATES or system of record to document movement of cargo.
-Provide scanners (PDA), tally sheets or Military Shipping Label (MSL) as applicable to the Contractor.
-Process contractor activity pay into GATES or system of record NLT 48 hours after receipt of documentation;
delays to GATES processing may occur due to frustrated cargo records.
-As applicable to type of operations, provide a discharge report; manifest; cargo load list; GATES onhand report;
pre-stow plan for vessel load; staging requirements; and when provided, a final stow plan for vessel discharge, to the Contractor
-Assist to resolve cargo discrepancies such as overages, shortages and Hazardous Material (HAZMAT) documentation.
-Provide input on special handling requirements to include staging of HAZMAT; sensitive; classified cargo and
Refrigerated containers.
-Provide training on scanners (PDA) and Government Documentation System(s), when applicable.
6.0 TERMINAL SPECIFIC REQUIREMENTS (IMPORT/ EXPORT)
6.1 Introduction
Services required will cover the full spectrum of ocean terminal operations to include discharge and loading of cargo and equipment on vessels, rail and truck conveyances, drayage of containers, vehicles or other equipment to, from and between rail, truck, and vessel staging/call forward areas, including designated areas/facilities for washing and/or fumigation of cargo and equipment. Vessels anticipated are Large Medium Speed Roll On/Roll Off (LMSR)
Vessels, Fast Sealift Ships (FSS), MARAD/Ready Reserve Fleet (RRF) Vessels, MSC Controlled or Chartered
Vessels, Maritime Prepositioned Ships, Cape Class Vessels, Liner Service Vessels, Barges, U.S. Army and Navy vessels, as well as NATO and other vessel types and classes. The Contractor must have sufficient trained and qualified labor and equipment capable of handling multiple and simultaneous vessel, rail and truck operations at
Cape Canaveral, FL and Cocoa, Fl (Rail Operations).
Multiple and simultaneous operations include “multi-modal” ocean terminal and yard operations on a 24- hour, around-the-clock basis keeping pace with cargo surge and sustainment of daily throughput capacity (i.e. 2 ships, 150
125 trucks, and various railcars simultaneously), making certain trucks and railcars are loaded and unloaded expeditiously, vessels are loaded/discharged on time to meet deadlines, and ensuring ultimate success of the overall mission.
The Government reserves the right to operate, load and discharge specialized Government equipment as directed by the COR.
6.2 Hours of Operation
The normal hours of operation for the terminal(s) are from 0730 to 1600 hrs; notwithstanding the normal operating hours as set forth in this contract. Operations may require continuation of vessel activities beyond normal operating hours and compensation for work beyond normal operating hours will be at the applicable rates set forth in the schedule of rates, schedule IV.
6.3 Terminal-Specific Scope
The contract covers the handling of Department of Defense sponsored export and import cargo at the 832nd Cape
Canaveral Detachment, located at Cape Canaveral Air Force Station, Cape Canaveral, FL for a base year and three four option periods beginning 1 November 2013 1 February 2015 and ending 31 October 2017 31 January 2020. The operational area of responsibility shall include providing stevedoring and related terminal services for DoD sponsored cargo transiting military facilities at Cape Canaveral Air Force Station and or Port Canaveral, Florida.
The Contractor shall arrange for and provide stevedoring and related terminal services, including materials and equipment incident thereto, except as specified in paragraph 6.4.2 as Government furnished.
6.3.1 Locations
This contract covers the handling of Department of Defense (DoD) sponsored export and import cargo at the 832nd
Cape Canaveral Detachment, located at building # 1063/1062, the Navy Trident Basin and the Poseidon Basin at
Cape Canaveral Air Station, Cape Canaveral, FL. The Rail site will be conduct approximately 11 miles west of Port
Canaveral, Fl in Cocoa, FL.
6.3.2 Scope of Terminal(s) and Operations
The 832nd U.S Army Cape Canaveral Detachment is responsible for coordinating vessel loading and discharge, reception/ onward movement of commercial and government trucks, and the operation of a container freight station daily to ensure timely receipt and efficient management of cargo moving through the terminal. Services include checking cargo upon receipt for damage, discrepancies, and proper documentations. Stevedore and Related
Transportation Service Contract accomplish these functions. Services also include the reception parcel post and small package from either the U.S. postal service (U.S. Postal Service) or from small package delivery service such as United Parcel Service and FEDEX. Cargo operation load and discharge of one Tug and Barge that makes a weekly re-supply trip to Andros Island, Bahamas. Contractor must be capable to support requirements for receiving, loading/discharging, staging and port clearance of a Cape Class vessel on a quarterly/semi-annually basis. The range of cargo handled by the port consists of Navy Exercise and live Torpedo’s, Explosive and Hazardous Material of all type and class, vehicles, containers, general break-bulk cargo, bulk sand /gravel and refrigerated cargo.
Rail operations will be conducted at a designated rail yard in Cocoa, FL approximately 11 miles west of Cape
Canaveral, FL. The Contractor will be responsible for obtaining the necessary authorization to conduct this operation at the designated site.
6.3.3 Training and Contingency Operations
The Government reserves the right to conduct training and contingency operations for US Army personnel during a scheduled or contingency load or discharge for any vessel operation. The Contracting Officer or COR will advise the Contractor when such training or contingency operation is scheduled; such notification will be provided to the
Contractor as soon as known, but should be provided at least 14 calendar days prior to the scheduled start of a normal Government operation, or as soon as possible for contingencies. During these training/special operation events, the Contractor shall provide sufficient qualified labor as required to support vessel loading or discharge operations and related terminal operations. Such labor, when requested, will be compensated at the man-hour rates established in Section B – Schedule of Services.
6.3.4 Hazmat Training
The Contractor will have at least two (2) company personnel trained and qualified in handling Hazardous Materials in accordance with 49CFR Part 172.704(d)
6.3.5 Rigging School Certification
The Contractor will have (2) company foremen/stevedores that are school trained and certified in rigging to inspect and rig heavy lift slings used in all vessel, rail and truck lifting operations. One certified rigger will be present at all times during lifting operations to ensure safe and proper selection of lifting gear, rigging techniques, and lifting points are being employed and utilized.
6.4 Terminal-Specific Contractor Duties
The Contractor shall be responsible for providing all services necessary for the receipt, clerking, checking and transfer of cargo to/from and within the railhead, truck area, staging area and vessel being loaded or discharged, at the commodity rate. Inclusive in these duties and responsibilities will be the requirement for scanning of Military
Shipment Labels (at the direction of the COR) and/or manual tallying of all cargo, at the commodity rate. In addition, the Contractor will mark, label, and place RFID Tags on vehicles, containers and other equipment on an as needed basis. Contractor must prepare documentation and reports as required by the COR to maintain accurate cargo audit and perpetuate the onward movement of both export and import cargo. The Contractor is required to provide escort service for all cargo delivery arriving or departing the Cape Canaveral Air Force Station. The Contractor shall be required to prepare and forward all daily, weekly, and/or monthly reports required by the Terminal Commander and/or higher Headquarters and as directed by the COR. The services described above are intended to totally accommodate all cargo transiting the 832nd Cape Canaveral Detachment facilities. Compensation will be at the applicable commodity rates.
The Contractor will be required to dray, tow, drag, lift, shuttle all disable/inoperable wheeled and tracked vehicles, containers and other cargo from place of rest within the staging area, to the vessel, drive, tow or lift the cargo into its designated stow location on-board the vessel, and lash and secure the cargo at the commodity rate as set forth in
Schedule of Rates, Schedule IA1. The contractor must have the equipments capable of handling all cargo to include disable/inoperable wheeled and track vehicles. For discharging vessel, the reverse procedure applies at commodity rates set forth in schedule IA2.
6.4.1 Stevedoring and Related Terminal Services – Inbound (Import)
Stevedoring and Related Terminal Services – Inbound (Import) involves the planning, vessel discharge, staging and loading of conveyances for onward movement, to include cargo documentation.
6.4.1.1 Planning is the process of stating the objectives of the mission/operation, often in advance of complete information.
The Government will:
1. Provide the Contractor with notice, as soon as known, of any inbound vessel, to include vessel configuration, manifested cargo and copy of stow plan if available.
2. Arrange for the staging area and berths (if applicable).
3. Provide a staging plan at least 3 days prior to commencement of operations, including special instructions.
The Contractor:
1. Shall arrange for staging or pier space, to include covered storage, if requested by the government.
[Commodity]
2. Shall provide a discharge plan, including special instructions, at least three (3) days prior to start of vessel discharge. [Commodity]
3. Shall prepare a staging plan, if requested by the government. (The Contractor shall provide the staging plan to the COR at least three (3) day prior to start of vessel discharge). [Commodity]
6.4.1.2 General Inbound (Import) Operations
6.4.1.2.1 Vessel
The Contractor shall be responsible for the cleaning of vessels upon discharge as requested by the COR. [Man-hour]
6.4.1.2.2 Lashing Gear
6.4.1.2.3 Rail
The Contractor shall dray containers and vehicles from the vessel and/or various staging areas to the railhead, and load onto railcars in accordance with the load plan. Only mobile cranes or top pick loading equipment, approved by the COR, shall be used for loading inoperable, heavy lift, or outsized vehicles and equipment. Lashing and securing of vehicles, containers and other equipment on rail cars shall be performed to the satisfaction of railroad inspectors.
Spanner plates will be secured, and debris policed within the rail yard upon completion of work. [Commodity]
Due to deadlines and time constraints, cargo may also be directed to move from the vessel to rail direct, in which case commodity payments will be made for both operations.
The Contractor shall complete rail loading, lashing and securing of vehicles, containers and other equipment in accordance with Association of American Railroad rules and SDDC TEA Pamphlet 55-19, and to the satisfaction of the COR and railroad inspectors.
6.4.2 Stevedoring and Related Terminal Services – Outbound (Export)
Stevedoring and Related Terminal Services – Outbound (Export) involves the planning, receiving, un-securing, discharging of conveyance (rail and truck), staging, cargo preparation, intra-terminal transfer and loading of cargo outbound from the port via oceangoing vessels, lighters and barges.
6.4.2.1 General Outbound (Export) Operations
6.4.2.1.1 Rail
The Contractor shall discharge and stage vehicles and equipment from rail cars commencing immediately after railcars arrive at their designated railhead sidings, and in conjunction with regular gangs start times. Only mobile cranes or top pick loading equipment, approved by the COR, shall be used for off-loading inoperable, heavy lift, or outsized vehicles and equipment. All vehicles, containers and equipment will be drayed to the government designated place of rest, in accordance with the Government’s staging plan, in preparation for vessel loading.
Spanner plates will be secured, and debris policed within the rail yard upon completion of work. [Commodity]
Due to deadlines and time constraints, cargo may also be directed to move directly from Rail to Vessel for loading, in which case commodity payments will be made for both operations.
6.4.2.1.2 Rail Car Preparation and Loading
The contractor shall raise and position corner pockets within the rail car to accept containers, and ensure locking pins or hooks are operational. [Man-hour]
6.4.2.1.3 Truck
The Contractor shall off-load containers and vehicles from their trucks, move them to the designated staging area/place of rest, segregate and tier containers within the staging area, at the commodity rate. The location of truck loading may change from time to time due to expediency, operational necessity, or space. [Commodity]
Due to deadlines and time constraints, cargo may also be directed to move directly from Truck to Vessel for loading, in which case commodity payments will be made for both operations.
The Contractor shall unload conveyances in accordance with SDDC freight traffic rules publications: 1A – Motor
Carriers , 10 – Rail, and in accordance with DoD, DHS/USCG and USDOT regulations. [Commodity]
The Contractor shall record and report cargo received daily and ensures that all damages are report immediately to the COR. All cargo including Freeze and Chill received shall be properly prepared for onward movement to destination; i.e. shrink wrapping, blocking and bracing, crating to prevent damages or spoilage. [Commodity]
6.4.2.1.3.1 Carpentry Services
Blocking and Bracing of Item 20 must be in accordance with MIL-STD-1320-113C, 1320-201A, 1320- 237B and must be included in the commodity rate.
The contractor shall fabricate and install blocking and bracing, coopering and other similar services as directed by the COR. [Man-hour]
6.4.2.1.3.2 Measuring and Weighing
The contractor shall verify or determine cargo weights and measures and report changes or discrepancies when discovered.
6.4.2.1.3.3 Validation and Reconciliation
The contractor shall validate cargo inventories on-hand and participate in reconciliation with the
Government.
6.4.2.1.4 Onward Movement
Onward movement is the disposition of cargo off the terminal.
The Contractor shall load and secure cargo on outbound conveyances (rail and truck) in accordance with all applicable industry, Federal and State standards and regulations as well as all guidance specified in appendix A.
[Commodity]
6.4.2.1.5 Vehicle Preparations
The contractor shall prepare Government vehicles in transit for onward movement. Preparation may include but not be limited to: reduce configuration, fuel/de-fuel, secure secondary loads, USDA-required cleaning. [Man-hour]
6.4.2.1.6 Vessel
The Contractor shall complete all stevedoring duties for vessels, i.e. all cargo properly stowed, lashed and secured in accordance with the Government’s or Ocean Carrier’s stow plan, to be ready to sail within two hours after completion of loading.
6.4.3 Management
Management involves the allocation and coordination of resources to accomplish a mission/operation.
6.4.3.1 General
For the terminal(s) within the scope of this contract, Government will provide a qualified point of contact for munitions operations.
6.4.3.2 Communication
The Contractor shall provide, maintain, and use the Hazards of Electromagnetic Radiation to Ordinance (HERO) approved communications equipment when conducting ammunition operations. Contractor shall have and maintain radio communications with its employees during normal operations. Contractor shall include the communication plan with the quality control plan. [Commodity]
6.5 Terminal-Specific Special Contract Requirements
6.5.1 Safety
The Contractor must, in performing services under the contract, comply with safety and fire regulations promulgated by the 832nd Cape Canaveral Detachment. In all instances where Contractor's employees are injured, a full report
(U.S. Army Accident Report, DA Form 285, see Attachments) of the fact and the extent of such injury must be submitted by the Contractor to the Contracting Officer, within twenty-four (24) hours following the occurrence of such injury, and in the form prescribed by the Contracting Officer. If an investigation of the accident is conducted, the Contractor must assist the investigator in securing statements from his employees and must make pertinent records available to him.
6.5.1.1 Emergency Response Plan
The Contractor shall provide a comprehensive safety and security Emergency Response Plan, which clearly outlines the procedures for emergency HAZMAT clean up of spills from leaking Materials Handling Equipment (i.e.
forklifts, tugs, and container top handlers, etc.) owned or leased by the Contractor to include damage to property and the environment. When the
Contractor does not have sufficient resources of his own available, he will immediately arrange for outside emergency response personnel who are specialized in spill containment and clean up. Any such clean up will be at the expense of the Contractor.
The Contractor shall comply with the hazardous spill procedures in the Emergency Response Plan. [Commodity]
6.6 Port Support Activity
The contractor shall provide manpower and material resources as necessary to support PSA requirements at the
832nd Cape Detachment. Purpose of the PSA is to support the military port operations in the staging and movement of military equipment through the port, provided assistance in loading and discharging operations of equipment on/off vessels, and to provide assistance to deploying and redeploying units for transgress of unit equipment through the port. PSA may include but are not limited to: maintenance/recovery of equipment moving through the port;
maintenance mechanic contact team; fueling/defueling vehicles; set up and operation of staging areas on the port for military vehicles and equipment; wrecker support for inoperable equipment on/off vessels and procuring services, supplies and equipment (i.e. gun tubes on M1 tanks, M113 ramps wire ropes and clips) inspecting vehicles and procuring and replacing or servicing, as necessary, tires; securing nested cargo and secondary loads; jump starting vehicles; and providing services as required by the COR to support all DoD cargo from all units organizations to include providing traffic control personnel; securing and setting up portable light sets for night operations and marking of equipment. Contractor may also be required to assist U.S. Bureau of customs/Border Protection with
Agriculture Inspection of military equipment to include washing of vehicles.
The Contractor shall provide PSA support as required by the COR. [Man-hour]
6.6.1 Contractor Duties
The Contractor agrees that upon acceptance of this Contract, that he is ready, willing and able to immediately assume and perform additional Port Support Activity (PSA) functions and duties prescribed herein, as part of this
Stevedoring and Related Terminal Services (S&RTS) Contract for the 832d Transportation Battalion area of operations at Cape Canaveral, FL. The Contractor must have sufficient manpower and equipment to support multiple and simultaneous vessel, rail and truck operations, in a rapid, high op tempo environment, within 24 hours of notification. The following provides a synopsis of the additional requirements that the S&RTS Contractor will be required to provide upon award of this contract.
6.6.1.1 Deadline Vehicle Recovery
The Contractor will provide recovery equipment capable of retrieving dead/tow wheel and track vehicles up to
150,000 lb, on and off vessels of various deck heights (lowest profile 10’6”), and traversing vessel ramps, as well as recovery to, from and between rail and truck loading/unloading points, and staging yards. The Contractor will be reimbursed by the Government under Schedule II and V and/or Schedule VIII.
Recovery equipment is of paramount importance for the safe and expeditious handling of deadline equipment. The
COR will notify the Contractor of known requirements, i.e. number and type of dead/tow pieces, as far in advance as possible, to ensure preparedness.
Towing will be conducted using an operationally equivalent vehicle, if available. When towing equipment, a tow bar will be utilized as standard operating procedure. Recovery teams will be responsible for hooking-up/unhooking and recovery of tow bars on the vessel and in the field to include rail and truck yards.
Operators will be trained and qualified on the equipment they are operating.
6.6.1.2 Contact Maintenance Team
The Contractor is responsible to provide maintenance support to vehicles and equipment that need to be made operational as quickly as possible, in order to be loaded or unloaded from vessels, rail cars, and/ or line haul trucks.
The Contractor must be equipped and capable of providing Light Duty maintenance for vehicles up to 50,000 lb, and/or Heavy Duty maintenance for vehicles over 50,000 lb. The Contractor will provide contact maintenance teams and contact maintenance vehicles, which contain air compressors, battery chargers (e.g. Tesla TIMV3000 GPU-24), slave cables, voltmeters, tow bars, bolt cutters, security seals, fuel cans, and tools, as well as fuel truck with pump.
Slave cables and tow bars unique to military equipment will be Government Furnished Equipment (GFE). All other equipment, to include Personal Protective Equipment (PPE) will be Contractor Furnished Equipment (CFE).
It is imperative that the contact maintenance teams be proactive, checking the operational status of equipment being loaded and off-loaded on ships, rail cars, and line-haul vehicles, so that inoperable vehicles can be identified expeditiously, with minimal work delays. It is also particularly important that the maintenance teams be capable of rapidly troubleshooting inoperable vehicles to get them running within 15 minutes, whenever possible.
Military repair parts, such as tires, will be furnished by the government if available. The contractor must be capable of making minor repairs, such as hooking up slave cables and jump starting vehicles, adjusting brakes (caging), inflating or changing tires, fueling vehicles as needed, and any other minor repairs that will allow the inoperable vehicle to be loaded under their own power in a safe and timely manner. Repair parts will be reimbursed as an [Out-of-Pocket expense]. Labor will be compensated at the [Man Hour Rate].
6.6.1.3 Other Duties and Responsibilities.
The following additional duties will be performed by the Contractor under the Man Hour Rate. Materials requested by the Government will be reimbursed as an Out-of-Pocket expense:
1. Setting up Staging Yards with cones and signage, and erecting Shelters with water points in accordance with staging diagram provided by COR.
2. Manning Traffic Control Points (TCP’s).
3. Equipping TCP’s with signal devices for day and night operations.
4. Movement, setting up, fueling and recovery of Generator Light Sets and Port-o-Lets.
5. Movement, initial placement, and recovery of aviation tuggers, scissor lifts and crane trucks.
6. Nesting and de-nesting of cargo, to include lashing and unlashing.
7. Correcting POM deficiencies, such as reducing vehicle configuration, banding secondary loads, replacing…