Atch_1_CALL_0001_PWS.pdf
PDF 812 KB Posted
- Attached to
- Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) Federal contract opportunity
- Solicitation number
- HTC711-14-R-R003
About this file
Atch 1 CALL 0001 PWS
View the file
Other files for this federal contract opportunity
Show all 50
Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stevedoring & Related Terminal Services
Performance Work Statement for
Military Operations Terminal – 841st Transportation Battalion
Charleston, South Carolina / Savannah, Georgia, Wilmington, NC and Morehead City, NC
HTC711-14-R-R003
CALL 0001
Attachment 1
Stevedoring & Related Transportation Services Performance Work Statement
TABLE OF CONTENTS
Section Section Topic Page
1.0 Background & Scope 2
2.0 Security 2
3.0 Safety 5
4.0 Contract Administration 5
5.0 Contractor General Requirements 6
6.0 Terminal Specific Requirements 9
Contractor Performance Requirements 21 Appendix A Regulations, Publications, & Forms 22 Appendix B Glossary of Terms 25 Appendix C List of Acronyms & Abbreviations 42
1.0 BACKGROUND & SCOPE
1.1 Background-Military Surface Deployment and Distribution Command (SDDC), headquartered at Scott AFB, IL is a major U.S. Army Command and a vital component of the U.S. Transportation Command. Since its establishment in 1965, SDDC has played a vital role in our nation’s defense by providing support to every war, major contingency, training exercise and humanitarian relief operation where our military forces have been deployed.
1.2 Scope-Stevedoring and Related Terminal Services
1.2.1. The Contractor shall provide stevedoring and related terminal services and management services in connection with the receipt, processing, and/or loading/discharging of cargo via all conveyances as designated by the Contracting Officer or Contracting Officer’s Representative (COR). The Contractor shall provide sufficient qualified labor, gear and equipment and materials to satisfy the scope of this contract, and make every effort to rectify any shortfall, for which the Contractor will be paid at the applicable commodity or man-hour rates as designated in Section B – Schedule of Services in this contract as requested by the COR.
1.3 Ground Rules and Constraints
1. 3.1 Persons Excluded from the Premises-The Contractor shall not allow a person that has been banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to terminal operations.
1.3.2 Persons with Restricted Duties-The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter those areas.
2.0 SECURITY (PHYSICAL, PERSONNEL, INFORMATION, INDUSTRIAL, OPERATIONS,
ANTITERRORISM, and FORCE PROTECTION) REQUIREMENTS
2.1 The overall performance classification of this PWS is Unclassified.
2.2 Personnel working IAW this PWS who do not require IA administrative privileges/ system monitoring capability but do require access to Non-Secure Internet Protocol Router Network (NIPRNET) applications, must successfully complete a National Agency Check with Inquiries (NACI). Favorable NACI investigation results must be posted in the Joint Personnel Adjudication System (JPAS) before a contractor is allowed access to the NIPRNET.
The NACI will be completed through the local SDDC security office.
HTC711-14-R-R003
2.3. Personnel not requiring a NACI investigation but require access to the port are required to obtain a Transportation Workers Identification Card (TWIC). TWIC card are issued from TWIC processing centers in port areas IAW mandatory dates provided from the Captain of the port
2.4 Once the contract is awarded, all names of the contractor employees needing a CAC, will be submitted to the SDDC security office for vetting through JPAS to ensure investigative and clearance requirements have been obtained before the start date of the contract. This will be completed prior to the Contracting Officer’s Representative (COR) / Trusted Agent (TA) submission of contractor employees’ names for the Common Access Card(s) (CAC) in the DoD Trusted Associate Sponsorship System (TASS). If a contractor’s employee does not have the appropriate investigative or security clearance requirement the contractor’s employee will be denied the ability to work in support of this PWS and will not be loaded into the TASS. Contractor employees will be loaded in TASS and have an expiration on their CAC for the initial contract period. Upon approval of each option period a new CAC will be issued with new dates for the subsequent option period only.
2. 5 The contractor shall ensure the roles/privileges assigned to contractor employees on the Government computing platforms are limited to the roles/privileges essential to that individual’s performance of his/her assignments. These roles/privileges can be limited or revoked by the Government for any reason.
2.6 If the Government notifies the contractor that the employment or the continued employment of any contractor employee is prejudicial to the interests or endangers the security of the United States of America, that person shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The company receiving award of this task order shall make any changes necessary in the appointment(s).
2.7 Personnel needing installation access will need to report to the Visitor Center and follow protocol. Upon successful completion (meaning no felonies or wants and warrants) the visitor center will issue an installation pass authorization. Personnel needing a NACI investigation will contact Ms. Peggy Clevenger at 597th TTG S2, Commercial: 757-878-8839 or peggy.l.clevenger.civ@mail.mil
2.8 All contractor employees (to include subcontractor employees), requiring access to Government installations, facilities and controlled access areas shall complete “AT Level I Awareness” training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the Contracting Officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level 1 awareness training is available at the following website: https://atlevel1.dtic.mil/at.
2.9 All contractor employees (to include subcontractor employees), within an Army controlled installation, facility or area shall brief all employees on the local iWATCH program when required (training standards to be provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
2.10 Contracting officers or contracting officer representatives will ensure Army contractors with security clearances comply with threat awareness and reporting requirements specified in AR 381-12. Additionally, persons employed by Army contractors will report threat-related incidents, behavioral indicators, and other matters of Counter-Intelligence (CI) interest specified in AR 381-12, Chapter 3, to the Facility Security Officer, the HQ SDDC Industrial Security Manager, the nearest military CI Office, the Federal Bureau of Investigation, or the Defense Security Service.
2.11 All information furnished to the Contractor is to be used FOR OFFICIAL USE ONLY (FOUO). The contractor is required to be aware of OPSEC requirements from SDDC. Information determined as FOUO or included as part of the OPSEC Critical Information List is not to be released to the public.
HTC711-14-R-R003
CALL 0001
Attachment 1 mailto:peggy.l.clevenger.civ@mail.mil https://atlevel1.dtic.mil/at
HQ SDDC Industrial Security Point of Contact:
Standa “Tony” Cameron 1 Soldier Way
SDDC G-2
Scott Air Force Base, IL 62225 Commercial: 618-220-6559
Email at standa.t.cameron.civ@mail.mil
HQ SDDC G2 Approval: Tony Cameron, 25 June 2014 HQ SDDC G2 Tracking #: HQSDDCG2-089-14
2.12 Requirement for Contractor Information Assurance (IA) Report
The Contractor shall provide an Information Assurance Report to describe their environment that safeguards DOD non-public information resident on or transiting the contractor's unclassified information systems from unauthorized access and disclosure. Protection measures applied should consider the risks (i.e. consequences and their probability) of loss, misuse, unauthorized access, or modification of information. The report shall address the SANS (SysAdmin, Audit, Network, Security) Institute's Twenty Critical Security Controls for Effective Cyber Defense:
Consensus Audit Guidelines (http://www.sans.org/critical-security-controls) and be provided in accordance with the attached template at Attachment 1 to the PWS. The contractor is encouraged to provide additional information above and beyond what is outlined in the SANS guidelines to enhance the government’s understanding of their information security posture. The report will be updated 30 days prior to exercise of an option period, if applicable.
2.12.1 Cyber Security Incidents
2.12.1.1 Reporting Requirements
The contractor shall report to the following two Government organizations as soon as possible upon discovery of any suspected cyber intrusion events that affect DOD information resident on or transiting the contractor's unclassified information systems.
1. USTRANSCOM Global Command, Control, Communications and Computers (C4) Coordination Center (GCCC) E-mail: ustcJ6-gccc@ustranscom.mil Commercial Phone: 618-229-4222
2. USTRANSCOM Deployment and Distribution Operation Center (DDOC)
E-mail: ustc-ddocchief@ustranscom.mil Commercial Phone: 618-220-7700
Initial report shall be provided even if some details are not yet available, with follow-on detailed reporting within 72 hours. Reportable cyber intrusion events include the following:
1. A cyber intrusion event appearing to be an advanced persistent threat
2. A cyber intrusion event involving data exfiltration or manipulation or other loss of any DOD information resident on or transiting the contractor's, or its subcontractors', unclassified information systems
3. Intrusion activities that allow unauthorized access to an unclassified information system on which DOD information is resident or transiting
Definition of advanced persistent threat: An extremely proficient, patient, determined, and capable adversary, including two or more of such adversaries working together.
HTC711-14-R-R003
CALL 0001
mailto:standa.t.cameron.civ@mail.mil
2.12.1.2 Incident Report Content
The incident report shall include, at a minimum, the following information:
1. Applicable dates (date of suspected compromise and date of discovery)
2. Threat methodology (all known resources used such as Internet Protocol (IP) addresses, domain names, copies malware, etc.)
3. An account of what actions the threat(s) may have taken on the victim system/network and what information may have been accessed
4. A description of the roles and functions of the threat-accessed system
5. An initial list of potentially impacted government programs and each program’s classification
6. What information may have been exfiltrated that may impact government programs
7. A list of all employees and subcontracted employees who work or have worked with the victim system/network
8. A point of contact to coordinate damage assessment activities
2.12.1.3 Incident Report Submission
The contractor will submit unclassified network cyber incident reports to the USTRANSCOM Technical Information Analysis Center (TIAC) and USTRANSCOM designated government personnel via encrypted email or another mutually agreed upon secure communications method. Copies of malware require special handling and pre-coordination must be accomplished prior to submission.
3.0 SAFETY
The Contractor must comply with applicable international, federal, state, local, installation and SDDC Transportation Battalion safety and fire regulations. The Contactor must establish and maintain an effective and comprehensive safety program. The Contractor will support the SDDC battalion’s Emergency Disaster Plan. The Contractor must acquire, maintain, and require the use of safety equipment, personnel protective equipment and devices necessary to protect employees on the installation, port, and on the vessel.
3.1 Safety-Driver Training
3.1.1 The Government will make available driver training for Government vehicles and related processes/procedures and the Contractor shall coordinate with local labor to attend the Government provided training so that sufficient pools of operators are available to operate Government vehicles, within a port as required.
Government vehicles may include, but is not limited to, all classes of Trucks, Stryker vehicles, Heavy Equipment Transporters (HETS), Mine Resistant Ambush Protective (MRAP) vehicles and Armored Tracked vehicles. Labor shall participate and Contractor shall be compensated at man-hour rates.
3.1.2 The Contractor shall ensure that personnel operating Government Vehicles possess a valid State Drivers License. In addition, Contractor personnel who operate Government Vehicles must be trained and qualified to operate varieties of military cargo to include those items listed in 3.1.1. The contractor shall furnish list of qualified drivers by name prior to the start of an operation.
3.1.3 All Contractor personnel who operate U.S Government or Contractor furnished munitions laden vehicles shall possess an approved license with HAZMAT endorsement. The Contractor shall provide the COR with a list of drivers being used each day to handle ammunition. The list will include a statement from the Contractor verifying that the individuals performing driving functions comply with paragraphs above. The Government reserves the right to stop contractor personnel at any time to verify their qualifications against the approved list of personnel scheduled to perform ammunition functions. Personnel found to be in non-compliance will be removed from the handling of ammunition and the incident will be reported to the Contracting Officer as well as in the monthly performance report.
3.2 Safety Briefings-The Contractor shall conduct and document safety briefings for all workers at each shift change and must brief new workers as any new labor is added. The Government will conduct safety briefings when necessary, during which time the labor will be on standby/detention time.
3.3 Safety – Operation of Equipment- Equipment operated by the Contractor for use during operations on any S&RTS Terminal must be maintained and operated IAW applicable Federal / State laws and regulations, OSHA, Army, port, and terminal regulations, directives, instructions and pamphlets. Damage to cargo or injury related to the use of non-compliant equipment or improper use of equipment will result in immediate non-use of that Contractor’s equipment until the Contractor takes corrective action. The Contractor must notify the COR when equipment is made compliant.
3.4 Safety – Accident Reporting-The Contractor shall immediately notify the COR verbally, of any accident or incident, which results in death or injury to personnel during or arising from performance under this contract.
In all instances where an accident or incident occur resulting in death or injury, the Contractor shall submit a completed DA Form 285, IAW AR385-40, to the COR within 24 hours of incident. The Contractor shall assist the Government during any investigation of an accident or serious incident.
4.0 CONTRACT ADMINISTRATION
4.1 Detention, Minimum Time, Differentials
4.1.1 Detention and minimum time, computed to the nearest 5 minute multiple, are payable to the contractor, in lieu of commodity or extra labor (XL) rates specified elsewhere in this contract, at the applicable man-hour rates, subject to the following:
4.1.2 When detention occurs during a commodity operation, the Contractor shall absorb each detention of fifteen
(15) minutes or less. The government shall pay the Contractor at detention rates for persons or gangs, including clerks and equipment operators (drivers) for each detention in excess of fifteen minutes including the first fifteen minutes thereof.
4.1.2.1 Detention shall not be authorized for any part of a gang that is not required on commodity operations or when certain classes of labor on commodity operations are required to stand by because of another class of labor performing a commodity operation. For example, commodity vessel load is inclusive of loading and lashing cargo.
Gangs conducting the load & lash are inclusive of each other under one commodity rate; therefore, drivers or lashers during the process of load and lash may be waiting for the other to perform or complete their job. Neither party will be placed on detention while the other is performing commodity work.
4.1.3 Whenever detention occurs prior to or during extra labor operations, the Government shall pay the Contractor on a detention rate basis for the time of each detention. In the event part of a gang is required to perform an extra labor operation, the balance of the gang standing by shall be paid for at detention rates. In the event certain classes of labor are required to standby because of another class of labor performing an extra labor operation, such certain classes of labor shall be paid at detention rates.
4.1.4 In accordance with applicable collective bargaining agreements, minimum time shall be payable to the Contractor when work fails to materialize or when work is completed prior to the minimum time and shall not be payable (i) for checkers working in conjunction with longshoremen until completion of the longshoreman commodity activity; and (ii) for any part of a gang not required on a commodity activity. For example, rail unload operation is inclusive of unlash and unload of cargo under one commodity rate. Lashers finish the unlash portion are still on commodity until the drivers are complete with unload and stage to point of rest. During rail load, after drivers complete the load, they remain on commodity until lashers have completed all lashing. While one portion of the gang is on commodity, all are listed as commodity.
4.1.5 The Contractor must obtain pre approval to work overtime authorized by the COR.
4.2 Contract Labor Reporting-The contractor shall provide as requested by the COR a daily time keeper personnel log book for verification of labor services provided for the day’s operations to use for reconciliation. The breakout will include total quantity by class of service.
4.3 Contractor Manpower Reporting Requirements
4.3.1 CONTRACTOR MANPOWER REPORT (CMR). The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Military Surface Deployment and Distribution Command via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://cmra.army.mil/.
4.3.2 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under Help Resources on the right side of the login page.
4.4 Training and Contingency Operations- The Government reserves the right to conduct training and contingency operations for Department of Defense personnel during a scheduled or contingency load or discharge for any vessel operation and related terminal operations. The Contracting Officer or COR will advise the Contractor when such training or contingency operation is scheduled; such notification will be provided to the Contractor as soon as it is known but NLT 48 hours prior to training, contingency or special operation mission. During these training/special operation events, the Contractor shall provide, when requested by the COR, sufficient qualified labor to support DoD personnel during these operations. Such labor, to include operators, flagmen, lashers, mechanic or headers when requested, will be compensated at the man-hour rates established in Section B – Schedule of Rates.
5.0 CONTRACTOR GENERAL REQUIREMENTS)
5.1 General duties and requirements of the Contractor are defined within this section. Duties and requirements specific to the particular terminal(s) within the scope of this contact are further defined in Section 6.0 -Terminal Specific Requirements.
5.2 Contractor services will cover the full spectrum of ocean terminal operations to include discharge and load of vessels, vessel stage/call forward areas including designated areas/facilities for washing and/or fumigation.
Vessels anticipated are Large Medium Speed Roll On/Roll Off (LMSR), Fast Sealift Ships (FSS), MARAD/Ready Reserve Fleet (RRF), Military Sealift Command (MSC) Controlled or Charted Vessels, Maritime Prepositioned Ships, Cape Class Vessels, Barges, U.S. Army and Navy vessels, car carrier vessels, combined container/Ro-Ro vessels as well as other vessel types and classes. The Contractor must be capable of handling multiple and simultaneous vessel, operations at each terminal as described in this contract’s Area of Responsibility (AOR).
Contractor will handle various classes of supply to include Ammunition, Hazardous Material, sensitive, controlled, and general DoD cargo.
5.3 The Contractor will inspect for damage and discrepancies and immediately report these items to the COR.
The contractor shall report any damage caused by the contractor, to cargo or vessel, immediately to the COR
5.4 The Contractor shall communicate to the COR any labor shortfalls immediately, and make every effort to rectify the shortfall.
5.5 The Contractor shall provide a dedicated manager to serve as a single point of contact for interface with the government during all daily operations; this includes management presence at away ports during terminal operations as described in Section 6.1 Area of Responsibility.
https://cmra.army.mil/
5.6 The Contractor shall provide a single point of contact on-site for each operation for each shift to the COR.
This individual must have decision-making authority and shall act as the central point of contact. During vessel operations, the Contractor must have stevedore oversight for all gang activity onboard vessels and in staging yards.
If any delay of operation is as a result of stevedore absence on deck or in the staging yard; the delay will be at the Contractor’s expense.
5.7 The Contractor shall participate in daily operations meetings and shall participate in other meetings regarding vessel load or unload as required. The Contractor shall order labor, material, and equipment based upon agreement with the COR.
5.8 The Contractor shall compare Government reports to Contractor documents and identify discrepancies and recommend reconciliations to the COR.
5.9 The Contractor shall provide a certified point of contact for HAZMAT cargo handling IAW CFR49 Part 172.704(d)
5.10 The Contractor shall acquire and maintain access, and submit man-hour input, to the Cargo & Billing System (CAB), or its future replacement system, for labor operations within seven (7) days following the billing activity.
5.11 The Contractor shall establish a Quality Control Inspection Plan (QCIP) which will emphasize quality control over all contract requirements. The Quality Control Inspection Plan will contain a Quality Control Inspection Checklist (QCIC) which, at a minimum, will contain all elements of the Performance Requirements Summary
(PRS).
5.12 Out of Pocket (OOP) Expenses- As related to the support of transportation and cargo and terminal operations, upon the request and approval of the COR, the Contractor shall provide specialized equipment (examples: floating crane, scissor lifts, generators, light sets, etc.) and supplies reimbursed by the Government at actual costs. Vendor receipt must be provided for reimbursement. Types of supplies include, but not limited to, lumber, placards, straps, shackles, tie wire, clips, fuel for military cargo and GFE (other than commodity operation) and banding material. The Contractor will also provide 3rd party services related to the support of transportation and terminal operations such as port-a-lets used in the operational area and crane orders for extra labor operations .
5.13 Stevedoring and Related Terminal Services (Import)
5.13.1 The Contractor will prepare the vessel for discharge to include the unlashing and physical removal of cargo from the vessel. Inclusive of the vessel discharge commodity rate, the Contractor shall discharge and document cargo (to include capturing linked, nested, and secondary items) of inbound cargo IAW with the agreed upon Discharge Plan and stage in accordance with the agreed upon Staging Plan (e.g. by type and destination) within time frame established at the cargo meeting between the Contractor and the Contracting Officer’s Representative (COR).
The Contractor shall handle multiple classes of cargo including sensitive, classified, HAZMAT cargo and Reefers in accordance with discharge and stage plan and IAW current applicable regulations. Any changes must be approved through the COR.
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of discharge of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition. The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows; discharge hours may or may not be continuous:
VESSEL TYPE DISCHARGEWORK HOURS
FSS (using shipboard crane) 56 FSS (using port crane) 48
HTC711-14-R-R003
BREAKBULK 72
LMSR (NON-PREPO) 72
RORO 48
CONTAINER SHIP 48
MPS 72
MPS/MAERSK 96
5.13.2 The Contractor shall conduct a reconciliation/validation of the cargo discharged.
5.13.3 The Contractor shall return vessel lashing gear to its proper place (lashing bins and wall racks) and will clean contractor debris prior to vessel departure.
5.14 Stevedoring and Related Terminal Services (Export)
5.14.1 The Contractor shall load cargo on the vessel from its place of rest to point of stow aboard vessel in accordance with the approved vessel pre-stow plan furnished by the Government and within the time frame established at cargo meeting between the Contractor and the COR. The Contractor shall handle all multiple classes of cargo including sensitive, classified, HAZMAT and Reefer Cargo IAW the pre-stow plan. The contractor shall secure cargo IAW SDDC TEA Reference 55-22, Marine Lifting and Lashing. The Contractor shall coordinate all vessel activity with the COR, the vessel master/chief mate, and when applicable with the Military Sealift Command (MSC) representative. The Contractor shall receive and review expected cargo list and pre-stow plan for accuracy and efficiency of vessel operations and report discrepancies, issues or concerns to the COR
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of loading of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition.
The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows;
discharge hours may or may not be continuous:
VESSEL TYPE LOAD WORK HOURS
FSS (using shipboard crane) 72 FSS (using port crane) 60
BREAKBULK 96
LMSR(NON-PREPO) 96
RORO 48
CONTAINER SHIP 48
MPS 96
MPS/MAERSK 120
5.14.2 The Contractor shall provide documentation using load list and scanner/ PDA that reflects the correct stow location, pay, nested, linked, secondary loads(as requested) and condition of the loaded cargo.
5.14.3 For vessel load and vessel discharge the Government will:
-Provide command and control as Single Port Operator/Manager for SDDC Operations.
-Identify specialized, unique military equipment requiring special handling and coordinate for handling this equipment as required.
-Maintain log book/record of events/time for all operations.
-Provide reports to the Contractor as specified within this contract.
HTC711-14-R-R003
-Compare contractor furnished reports with the Government reports, identify further discrepancies and reconcile them with the Contractor.
-Identify the COR to oversee contract operations.
-Provide a qualified point of contact for HAZMAT.
-Provide ICODES pre-stow plans as specified within this contract NLT 48 hours for review with a revised copy provided NLT 24 hours prior to operation.
-Utilize GATES or system of record to document movement of cargo.
-Provide scanners (PDA), tally sheets or Military Shipping Label (MSL) as applicable to the Contractor.
-Process contractor activity pay into GATES or system of record NLT 48 hours after receipt of documentation;
delays to GATES processing may occur due to frustrated cargo records.
-As applicable to type of operations, provide a discharge report; manifest; cargo load list; GATES onhand report;
pre-stow plan for vessel load; staging requirements; and when provided, a final stow plan for vessel discharge, to the Contractor -Assist to resolve cargo discrepancies such as overages, shortages and Hazardous Material (HAZMAT) documentation.
-Provide input on special handling requirements to include staging of HAZMAT; sensitive; classified cargo and Refrigerated containers.
-Provide training on scanners (PDA) and Government Documentation System(s), when applicable.
6.0 TERMINAL SPECIFIC REQUIREMENTS (IMPORT/ EXPORT)
6.1 The 841st Transportation Battalion is located on the Joint Base Charleston Station (JBC), South Annex in North Charleston, SC and serves as the Single Port Manager (SPM) for ports in South Carolina, Georgia, and North Carolina. The operational areas for SC includes the Joint Base Charleston Main station, Wharf A, South Annex, TC Dock and SC State Port Authority facilities within the Charleston area. Operational areas for Georgia include Garden City and Ocean Terminal, and areas for NC include Wilmington and Morehead City. The GA and NC ports are mostly used for exercises, contingencies, humanitarian, and war effort or as result of another AOR site impacted by natural disaster or construction.
6.2 The normal hours of operation for the terminals are 0800 to 1700 hours, Monday through Friday. When operational requirements dictate, work may include overtime, weekend and holiday work hours.
6.3 Scope of Terminal(s) and Operations-
6.3.1 The Contractor shall handle ammunition/explosive cargo IAW the terms of this contract. Compensation for the handling of explosives of a type requiring a U.S. Coast Guard permit, will be IAW the Schedule of Rates for labor, Ammunition differential pay.
6.3.2 In Charleston, the operations meeting will be held daily, Monday through Friday at 1500 in the Operations Conference Room in B3852. COR will notify Contractor of temporary changes to time or location.
6.3.3 ILA\Stevedore Employees Travel/Transportation-At the Contractor’s expense, the Contractor will provide transportation of employees between the ILA gate/ parking area (currently designated as Gate 4 for JBC) and all work sites. When JBC base access is restricted due to a threat level change, the Contracting Officer will discuss options with the Contractor for extra labor travel time considerations. All travel from Gate 4/ ILA parking lot to work area is at the Contractor’s expense and will not be reimbursable through man-hour rates. This includes locations at commercial ports described within this contract for 841st AOR.
6.4 Government Furnished Facilities, Equipment, Supplies, Services, and Information
6.4.1 Facility space for offices, gear room, and limited covered storage area necessary for the performance of the contract, are located in building 3838. Prior to making any changes that require altering existing structures, the Contractor shall submit plans for approval to the Contracting Officer ACO and COR. All such costs will be at the Contractor’s expense. Upon completion of this contract, the Contractor shall be responsible for returning the
HTC711-14-R-R003
facilities and premises to substantially the same condition as at the time of contract award if directed by the Contracting Officer, otherwise modifications will remain in place and become the property of the U.S. Government.
6.4.2 Government Furnished Equipment/Vehicles
6.4.2.1 The Contractor shall hand receipt for all GFE using DA Form 2062
6.4.2.2 Equipment may include spanner plates, ramps, tow-bars, and NATO booster cables.
6.4.2.3 The Contractor shall not use GFE (such as KALMAR, Shuttle wagon, and warehouse forklift) or military cargo except on a case-by-case basis and only when approved in advance by the COR. At the Contractor’s expense, the Contractor will refuel GFE after each operations use. Labor used to operate GFE during a commodity operation is compensated IAW the applicable Commodity Schedule of Rates. GFE approved for use will be returned to the Government in the same operating condition.
6.4.2.4 Cranes used for vessel operations to include Container crane, Gantry crane or mobile dock cranes.
6.4.2.5 Mobile crane for XL yard work operations as requested by the COR.
6.4.3 Government Furnished Supplies/Services
6.4.3.1 Blank Government Forms (electronic versions when available) required for operations as described within the Technical Exhibits or other forms as approved by the COR.
6.4.3.2 Services may include water, sewer, electricity and base telephone lines. This excludes long distance telephone service.
6.4.3.3 On JBC, dumpsters for debris and refuse generated by cargo operations. The Government will control pickup and disposal.
6.4.3.4 Access to Government Enterprise Email and Cargo & Billing System (CAB). Computers and software programs are to be furnished by the Contractor. Contractor access to Government information systems requires registration in Army Training Certification Tracking System (ATCTS) at the commencement of services, and Contractor must successfully complete the DOD Information Assurance Awareness (IA) training before issuance to Government information systems access. The IA training is an annual requirement.
6.4.3.5 Cargo Status Reports, to include the following: Enroute lists, Onhand lists and Load Lists provided by Traffic Management, if deemed mission-relevant by the COR.
6.4.3.6 The Government will identify and provide port specific training requirements for the Contractor to acquire.
The Government will make available training for Government furnished equipment and processes/procedures and the Contractor shall coordinate with local labor to attend the Government provided training so that sufficient pools of operators are available to operate Government furnished equipment. Labor shall participate at no cost to the Government.
6.4.4 The Contractor shall provide operator-level inspection of GFE prior to each use and communicate any GFE deficiencies or maintenance requirements to the COR at discovery. The COR will inform the Contractor if the GFE can be used for the mission dependent on deficiency discovered or maintenance requirement to prevent unsafe use.
The Contractor shall ensure that GFE is returned to the Government in the same condition as received, fair wear and tear accepted. The Contractor shall, at his own expense, either repair all gear and/or equipment damaged in the course of his operations or reimburse the Government for the cost thereof.
6.5 The Contractor shall furnish the following supplies and services:
6.5.1 Wire cables, turnbuckles, shackles, clips, ratchet straps, lumber, dunnage, chocking, and blocking materials, which are required in the performance of the services hereunder. Contractor shall only order sufficient quantities of
HTC711-14-R-R003
materials to satisfy the mission requirement as requested the COR. Costs are reimbursed for only the materials used, as an out of pocket expense, upon approval of the COR. Serviceable material/supplies recovered from down-loading ships will be reused at no additional cost to the Government. Dunnage and lashing materials furnished by Contractor will be of grade, quality, size, and dimensions suitable for the intended use. The Contractor shall deliver these materials to shipside or other designated location(s), as required. The Contractor supplies HAZMAT placards/labels when requested by the COR, reimbursed as out of pocket cost.
6.5.2. The Contractor must maintain sufficient quantities of dry sweep, absorbent pads, absorbent materials, drip pans, and EPA disposal containers to be used on and off the vessels, and for rail operations, truck operations, dray operations and all yard work for HAZMAT spills and/ or leaks. The stevedore will ensure the operator does not drive thru spills in yard or on vessel and will ensure vehicle has drain pan to contain leaks in progress. The Contractor has the responsibility to immediately react to all leaks, spills, etc. with initial clean-up and must report the incident to the COR immediately for decision if EPA needs to be notified for further cleanup. The COR will direct the Contractor to complete the cleanup job if EPA cleanup is not warranted. The Contractor is required to provide personnel to cleanup spills and /or leaks and properly dispose of such materials IAW all OSHA and JBC EPA guidelines. The Contractor is responsible for all costs associated with cleanup if incident is due to the Contractor’s negligence as witnessed by a Government representative or if it originates from the Contractor’s equipment. For spills and/or leaks caused by defective cargo or found not to be caused by the fault of the Contractor, cleanup costs will be absorbed by the Government to include labor under the man-hour schedule of rates.
6.5.3 The Contractor must insure that all work areas, to include the ILA /Contractor employee parking areas, are cleaned after operations and that all trash, debris, lumber and lashing equipment which have accumulated in the work areas is policed and placed in trash receptacles or appropriate areas prior to close of business. The Contractor shall segregate debris, scrap lumber and scrap dunnage into designated containers ready for removal; keep piers, warehouse floors and adjacent operation areas free of debris and dunnage generated from Contractor’s operation.
Sort, assemble and stack empty pallets in designated areas as required by the COR.
6.6 With the exception of equipment specified as Government furnished, the Contractor at his own expense must furnish all gear and equipment required to perform all services under this contract (for both single and multiple vessel operations and yard work). This includes appropriate material handling equipment (MHE) for handling 20 foot and 40 foot containers, with or without their lifting pockets (Containers without lifting pockets will only be lifted using a top lift), and equipment (under 10’6” in height and weighing less than 35 tons) capable of towing up to a M1A1 tank’s (70 tons) weight equivalency on or off vessel, or for draying to or from rail. Contractor will need ability to tow M1000 HET trailers without M1070 prime mover, as well as MAFI trailers, on and off vessels. Upon request by the COR, the Contractor shall make record of required equipment inspection, load testing and certification available for review. Maintenance of Equipment-Equipment operated under this contract must be maintained and operated in accordance with applicable federal/state laws and regulations, OSHA, Army, port, and SDDC regulations.
6.7 Government Use of Contractor’s Equipment (Rental)-If for any reason, the Contractor is unable to perform services under this contract, it is agreed that the Government may elect to rent and that the Contractor shall rent to the Government such of the contractor’s gear and equipment as had customarily been allocated to the performance of this contract at rental rates negotiated by the Contracting Officer at time of requirement. The Government will accept such gear and equipment as it may elect to rent where is and as is, and furnish fuels, lubricants, and operators.
A joint condition survey shall be made when the gear and equipment is turned over to the Government and also when returned to the Contractor. The Contractor shall deliver such gear and equipment to a mutually agreed location. The government agrees to maintain the gear and equipment and to return it to the Contractor in as good condition as originally received, fair wear and tear excepted. The rental period may continue for the duration of the Contractor’s inability to perform services under the contract, but not to exceed 180 days, unless extended or sooner terminated by agreement of the parties.
6.8 The incoming Contractor, without additional compensation, must participate with the COR and predecessor Contractor (if applicable) in a joint wall-to-wall inventory of all Government Furnished Facilities, Equipment and Property and cargo inventory for which the Contractor assumes responsibility. The Contractor, along with a designated Government rep, shall conduct a property inventory on an annual basis. At the completion of the
HTC711-14-R-R003
contract, or prior to contract completion, as designated by the COR, the Contractor shall conduct a joint inventory of all Government Furnished Facilities, Equipment, and Property and cargo inventory for which the Contractor has been responsible so that a final reconciliation can be made pending contract completion. Inventory areas include vehicle staging areas, outside storage and warehouse areas.
6.9 The Contractor shall protect cargo, facilities and equipment entrusted to his care and shall exercise reasonable diligence to secure it and comply with security standards commensurate to industry practice. For cargo, the Contractor shall ensure cargo doors, hatch covers, and windows are closed.
6.10 Safety Requirements
6.10.1 The Contractor shall adhere to all base, vessels and port speed limits as directed per regulation or as defined by the SDDC Commander and SDDC Safety Officer. For all SDDC vessel operations at all terminals/ports, the speed limit inside vessel, on vessel ramps, and on dock/pier is 5 MPH. In all SDDC Stage locations, the speed limit is 10 MPH or less. On base roads, MHE speed limit is 10 MPH. The JBC and commercial port road speed limits are posted or in regulations.
6.10.2 The Contractor shall place traffic cones at intersections where cargo operations interfere with base vehicular traffic e.g. 10th Street at ATRAC. The Contractor shall pickup and shall return cones to storage once operation is complete. The Government will provide the traffic cones, maintained as Government property.
6.10.3 During all operations, the Contractor shall leave no cargo running unattended.
6.10.4 During vessel operations, the Contractor shall 1) not remain idle across watertight door areas, maintain only one vehicle moving on a ramp at all times and 3) will test vehicle brakes before moving vehicle on ramps.
6.10.5 The Contractor and the Government will complete a joint inspection using DD Form 626 for all equipment to include MHE used in the handling of munitions cargo prior to operation commencement as required by the COR. Contractor is liable for all Detention Time due to inspection failure. DD Form 626 will be available for USCG review during munitions operation; a copy will be maintained by the Government
6.10.6 The Contractor shall provide, maintain, and use the Hazards of Electromagnetic Radiation to Ordinance (HERO) approved communications equipment when conducting ammunition operations.
6.10.7 All Contractor personnel, including ILA members, will not use cell phone(s) in or around staging areas, vessel, rail operations, and truck operations or while driving stevedore equipment, Government furnished equipment or cargo. On JBC, the wearing of any other portable headphones, earphones, or other listening devices (except hands-free cellular phones) while operating a motor vehicle is prohibited.
6.11 Documentation
Inclusive of commodity schedule of rates for vessel, truck, rail and checker operations, documentation is the process of capturing cargo status and accurate cargo details (e.g. correct dimensions, model number, identification of HAZMAT, linked cargo, secondary cargo or sensitive), and contractor’s activity pay for SDDC cargo transiting through terminal by various modes of transportation. Contractor shall pickup and returns scanners and cargo documentation from the Traffic Management Division (TMD) unless otherwise specified.
6.11.1 The Contractor shall document (scan and tally) cargo arriving or departing via vessel, rail, truck, car carrier, drive/tow or convoy. Convoy documentation is only when requested by the COR using extra labor man-hour schedule of rates. The Traffic Management section will instruct checkers on scanner use and tally form. The Contractor shall retrieve scanners and tally sheets from the Traffic Management section no earlier than one hour prior to operation commencement. The Contractor shall return scanners and tally sheets to the Traffic Management section at the beginning of all meal breaks where they will be issued a new scanner to continue with after the meal break.
For rail upload, rail load tally sheets will be provided to the Traffic Management Freight office every two hours.
HTC711-14-R-R003
For truck load, the Contractor shall return original Truck Load Tally sheet to the driver for his bill, and will provide a second copy to TMD at each meal break. Third copy is retained by the Contractor.
For cargo that requires an ILA checker for CBL/GBL Waybill data capture and does not require use of ILA operator to load, the Contractor will be paid IAW Commodity Schedule of Rates- 1G for Charleston e.g.
tow in, drive in, tow out, drive out and car carrier. This does not apply to convoy cargo.
6.11.2 To accept custody and responsibility for cargo as it arrives at the terminal, the Contractor shall sign for all driver’s Commercial Bill of Ladings, Government Bill of Ladings, and Commercial Waybills for cargo offloaded by ILA to include drive-ins, tow-ins, or car carriers. The signed documentation will be provided to the Traffic Management Freight office for record by COB each day.
6.11.3 The Contractor shall place Radio Frequency Identification (RFID) tags on cargo as requested by the COR and as instructed by Traffic Management using extra labor man-hour schedule of rates
6.11.4 The Contractor shall scan cargo into ICODES stow locations via scanners (PDA) for vessel loads inclusive of the vessel load commodity schedule of rates. The Contractor shall collect, issue, and return scanners to/from the ICODES section in Cargo Ops unless directed by the COR to use TMD provided scanners. Scanners will be returned upon completion of compartment and /or at each meal hour. New scanners include ICODES stow capture and stevedore pay under one function within the scanner. When load gang includes vessel plans clerk, the vessel plans clerk will resolve issues in regards to missing info, unclear stow position and incomplete data.
6.12 Cargo Stage
6.12.1 The Contractor shall prepare and submit stage plan to COR NLT 48 hours in advance of operations for approval. The stage plan will reflect cargo staged by destination, type, frustrated, sensitive, hazardous, mode of inland transportation (e.g. rail, commercial truck, or convoy) as required for port clearance. This includes providing information on marking and /or flagging assignments for destinations.
The Contractor shall stage cargo to the initial point of rest or into stow location, as agreed by the COR, to facilitate onward movement via vessel load or port clearance. The COR will communicate changes/events that may affect the Contractor’s stage plan. The Contractor is responsible for setting up and managing staging areas.
The Contractor will segregate HAZMAT, sensitive and other special cargo as required by the COR. The placement of cargo to initial point of rest in stage area is inclusive of truck, rail and vessel commodity rates.
TC Dock stage area includes Lots A through E; Wharf A stage area is the gated compound across from Wharf A pier.
For vessel offload, The Contractor shall stage cargo by final destination, port clearance mode (rail/truck) and by type of line-haul conveyance (RGN/Flatbed/Step deck).
For vessel load, the Contractor must stage by POD when loading for multiple ports, HAZMAT, sensitive and other special requirements, as required by the COR.
6.12.2 The Contractor shall validate cargo inventories on-hand and participate in reconciliation with the Government to ensure accurate accountability for ITV.
6.13 Transfer of Cargo
This is the repositioning of cargo from its initial point of rest to other staging locations within and around the terminal.