Attachment_J.10_-_Pricing_Worksheets_CENTRAL_A00002.xlsx

XLSX spreadsheet 152 KB Posted

Attached to
Transportation Security Equipment Deployment Services (TEDS) Federal contract opportunity
Solicitation number
HSTS04-14-R-CT4049
Issued by
Department of Homeland Security Transportation Security Administration

About this file

Attachment J.10 - Pricing Worksheets CENTRAL A00002

View the file

Other files for this federal contract opportunity

Other files attached to Transportation Security Equipment Deployment Services (TEDS), newest first.
File Type Posted
Attachment_J_3_-_Question_and_Answer_Sheet_A00003.pdf PDF
HSTS04-14-R-CT4049_-_SF_30_A00003.pdf PDF
Attachment_J.3_-_Question_and_Answer_Sheet_Amendment_A00002.pdf PDF
HSTS04-14-R-CT4049_Amendment_A00002.pdf PDF
Attachment_J.11_-_Pricing_Worksheets_WEST_A00002.xlsx XLSX spreadsheet
Attachment_J.9_-_Pricing_Worksheets_EAST_A00002.xlsx XLSX spreadsheet
HSTS04-14-R-CT4049_-_SF_30_A00002.pdf PDF
Attachment_J.5_-_Task_Order_02.pdf PDF
Attachment_J.15_-_OST_Test_and_Evaluation_Guidebook.pdf PDF
HSTS04-14-R-CT4049_Amendment_A00001.pdf PDF
Attachment_J.7_-_Past_Performance_Statement.docx DOCX document
Attachment_J.11_-_Pricing_Worksheets_WEST_A00001.xlsx XLSX spreadsheet
HSTS04-14-R-CT4049_-_SF_30.pdf PDF
Attachment_J.3_-_Question_and_Answer_Sheet_A00001.pdf PDF
Attachment_J.14_-_DHS_4300A_Sensitive_Systems_Handbook.pdf PDF
Attachment_J.16_-_OST_Test_and_Evaluation_Guide.pdf PDF
Attachment_J.4_-_Task_Order_01.pdf PDF
Attachment_J.10_-_Pricing_Worksheets_CENTRAL_A00001.xlsx XLSX spreadsheet
Attachment_J.13_-_TSA_Information_Assurance_Handbook.pdf PDF
Attachment_J.9_-_Pricing_Worksheets_EAST_A00001.xlsx XLSX spreadsheet
Attachment_J.17_OST_OA_Test_and_Evaluation_Policy.pdf PDF
Attachment_J.4_-_Task_Order_01.pdf PDF
Attachment_J.7_-_Past_Performance_Statement.docx DOCX document
Attachment_J.8_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.11_-_Pricing_Worksheets_WEST.xlsx XLSX spreadsheet
Attachment_J.6_-_DHS_Subcontracting_Plan_Review_Checklist.pdf PDF
Attachment_J.5_-_Task_Order_02.pdf PDF
Attachment_J.3_-_Question_and_Answer_Sheet.xlsx XLSX spreadsheet
Attachment_J.1_-_FED_Map.pdf PDF
HSTS04-14-R-CT4049.pdf PDF
Attachment_J.2_-_SCA_DBA_Spreadsheet.pdf PDF
Attachment_J.9_-_Pricing_Worksheets_EAST.xlsx XLSX spreadsheet
Attachment_J.10_-_Pricing_Worksheets_CENTRAL.xlsx XLSX spreadsheet
Attachment_J.12_-_Pricing_Worksheets_ALL.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL - Y1

CENTRAL - YEAR 1
IDIQ UNIT PRICING
Equipment TypeShipping FP Per Unit/ Per TruckloadEquipment Rigging Per MobilizationEquipment InstallationEquipment De-InstallationPackagingCrating
UnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit Price
FFE
Lightweight (Frames, Pelican Cases, Mats, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Fixtures (Stanchions, Panels, Gates, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Parts (Rollers, Conveyors, AVS, Etc.)1 unitDay1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Furniture (Podiums, Cabinets, Tables, Benches)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Glass (S-Kit)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Small TSE
ETD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
BLS1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
WTMD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
CAT1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
Large TSE
AT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
TRX0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
AIT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
EDS0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
Description of ServicesUnitUnit Price/Rate
Invoice ValidationDay
Site Design - CADHour
Site Lead - Inline CBT (CAT X and I)Day
Site Lead - Inline CBT (CAT II, III, and IV)Day
Site Lead - Stand-Alone CBT (CAT X and I)Day
Site Lead - Stand-Alone CBT (CAT II, III, and IV)Day
Site Lead - CPT (CAT X and I)Day
Site Lead - CPT (CAT II, III, and IV)Day
Temporary StorageWeek
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service RequirementsRate/% **
Program Management Services for IDIQ Contract (TO 02)Month
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month
*Additional CLINs may be negotiated/awarded at the TO-level as necessary.
** This fixed fee rate is the maximum fee to be applied to cost in TOs with cost reimbursable CLINs. The percentage is negotiable based on the level of effort and performance risk associated for the specific work
***Unit prices shall be inclusive of all direct costs including travel

CENTRAL - Y2

CENTRAL - YEAR 2
IDIQ UNIT PRICING
Equipment TypeShipping FP Per Unit/ Per TruckloadEquipment Rigging Per MobilizationEquipment InstallationEquipment De-InstallationPackagingCrating
UnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit Price
FFE
Lightweight (Frames, Pelican Cases, Mats, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Fixtures (Stanchions, Panels, Gates, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Parts (Rollers, Conveyors, AVS, Etc.)1 unitDay1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Furniture (Podiums, Cabinets, Tables, Benches)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Glass (S-Kit)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Small TSE
ETD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
BLS1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
WTMD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
CAT1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
Large TSE
AT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
TRX0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
AIT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
EDS0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
Description of ServicesUnitUnit Price/Rate
Invoice ValidationDay
Site Design - CADHour
Site Lead - Inline CBT (CAT X and I)Day
Site Lead - Inline CBT (CAT II, III, and IV)Day
Site Lead - Stand-Alone CBT (CAT X and I)Day
Site Lead - Stand-Alone CBT (CAT II, III, and IV)Day
Site Lead - CPT (CAT X and I)Day
Site Lead - CPT (CAT II, III, and IV)Day
Temporary StorageWeek
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service RequirementsRate/% **
Program Management Services for IDIQ Contract (TO 02)Month
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month
*Additional CLINs may be negotiated/awarded at the TO-level as necessary.
** This fixed fee rate is the maximum fee to be applied to cost in TOs with cost reimbursable CLINs. The percentage is negotiable based on the level of effort and performance risk associated for the specific work
***Unit prices shall be inclusive of all direct costs including travel

CENTRAL - Y3

CENTRAL - YEAR 3
IDIQ UNIT PRICING
Equipment TypeShipping FP Per Unit/ Per TruckloadEquipment Rigging Per MobilizationEquipment InstallationEquipment De-InstallationPackagingCrating
UnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit Price
FFE
Lightweight (Frames, Pelican Cases, Mats, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Fixtures (Stanchions, Panels, Gates, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Parts (Rollers, Conveyors, AVS, Etc.)1 unitDay1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Furniture (Podiums, Cabinets, Tables, Benches)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Glass (S-Kit)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Small TSE
ETD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
BLS1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
WTMD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
CAT1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
Large TSE
AT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
TRX0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
AIT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
EDS0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
Description of ServicesUnitUnit Price/Rate
Invoice ValidationDay
Site Design - CADHour
Site Lead - Inline CBT (CAT X and I)Day
Site Lead - Inline CBT (CAT II, III, and IV)Day
Site Lead - Stand-Alone CBT (CAT X and I)Day
Site Lead - Stand-Alone CBT (CAT II, III, and IV)Day
Site Lead - CPT (CAT X and I)Day
Site Lead - CPT (CAT II, III, and IV)Day
Temporary StorageWeek
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service RequirementsRate/% **
Program Management Services for IDIQ Contract (TO 02)Month
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month
*Additional CLINs may be negotiated/awarded at the TO-level as necessary.
** This fixed fee rate is the maximum fee to be applied to cost in TOs with cost reimbursable CLINs. The percentage is negotiable based on the level of effort and performance risk associated for the specific work
***Unit prices shall be inclusive of all direct costs including travel

CENTRAL - Y4

CENTRAL - YEAR 4
IDIQ UNIT PRICING
Equipment TypeShipping FP Per Unit/ Per TruckloadEquipment Rigging Per MobilizationEquipment InstallationEquipment De-InstallationPackagingCrating
UnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit Price
FFE
Lightweight (Frames, Pelican Cases, Mats, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Fixtures (Stanchions, Panels, Gates, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Parts (Rollers, Conveyors, AVS, Etc.)1 unitDay1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Furniture (Podiums, Cabinets, Tables, Benches)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Glass (S-Kit)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Small TSE
ETD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
BLS1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
WTMD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
CAT1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
Large TSE
AT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
TRX0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
AIT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
EDS0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
Description of ServicesUnitUnit Price/Rate
Invoice ValidationDay
Site Design - CADHour
Site Lead - Inline CBT (CAT X and I)Day
Site Lead - Inline CBT (CAT II, III, and IV)Day
Site Lead - Stand-Alone CBT (CAT X and I)Day
Site Lead - Stand-Alone CBT (CAT II, III, and IV)Day
Site Lead - CPT (CAT X and I)Day
Site Lead - CPT (CAT II, III, and IV)Day
Temporary StorageWeek
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service RequirementsRate/% **
Program Management Services for IDIQ Contract (TO 02)Month
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month
*Additional CLINs may be negotiated/awarded at the TO-level as necessary.
** This fixed fee rate is the maximum fee to be applied to cost in TOs with cost reimbursable CLINs. The percentage is negotiable based on the level of effort and performance risk associated for the specific work
***Unit prices shall be inclusive of all direct costs including travel

CENTRAL - Y5

CENTRAL - YEAR 5
IDIQ UNIT PRICING
Equipment TypeShipping FP Per Unit/ Per TruckloadEquipment Rigging Per MobilizationEquipment InstallationEquipment De-InstallationPackagingCrating
UnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit PriceUnitUnit Price
FFE
Lightweight (Frames, Pelican Cases, Mats, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Fixtures (Stanchions, Panels, Gates, Etc.)1 unit1 unit1 unit1 unit
2 - 20 units2 - 20 units2 - 20 units2 - 20 units
21 - 50 units21 - 50 units21 - 50 units21 - 50 units
51+ units51+ units51+ units51+ units
Parts (Rollers, Conveyors, AVS, Etc.)1 unitDay1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Furniture (Podiums, Cabinets, Tables, Benches)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Glass (S-Kit)1 unit1 unit1 unit1 unit
2 - 10 units2 - 10 units2 - 10 units2 - 10 units
11+ units11+ units11+ units11+ units
Small TSE
ETD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
BLS1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
WTMD1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
CAT1 unit1 unit1 unit1 unit
2 - 4 units2 - 4 units2 - 4 units2 - 4 units
5+ units5+ units5+ units5+ units
Large TSE
AT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
TRX0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
AIT0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
EDS0 - 200 milesDay1 unit1 unit1 unit
201 - 499 miles
500 - 1000 miles2+ units2+ units2+ units
1000+ miles
Description of ServicesUnitUnit Price/Rate
Invoice ValidationDay
Site Design - CADHour
Site Lead - Inline CBT (CAT X and I)Day
Site Lead - Inline CBT (CAT II, III, and IV)Day
Site Lead - Stand-Alone CBT (CAT X and I)Day
Site Lead - Stand-Alone CBT (CAT II, III, and IV)Day
Site Lead - CPT (CAT X and I)Day
Site Lead - CPT (CAT II, III, and IV)Day
Temporary StorageWeek
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service RequirementsRate/% **
Program Management Services for IDIQ Contract (TO 02)Month
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month
*Additional CLINs may be negotiated/awarded at the TO-level as necessary.
** This fixed fee rate is the maximum fee to be applied to cost in TOs with cost reimbursable CLINs. The percentage is negotiable based on the level of effort and performance risk associated for the specific work
***Unit prices shall be inclusive of all direct costs including travel

CENTRAL - Y1 TWP

CENTRAL - YEAR 1
TOTAL WEIGHTED PRICE (To Be Completed by TSA)
Equipment TypeShippingRiggingInstallationPackagingCratingTOTALWeightWeighted TOTAL
QtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotal
Lightweight FFE100100100010
120012001200010
350035003500010
510051005100010
Fixtures100100100010
120012001200010
350035003500010
510051005100010
Parts100100100100010
600100600600010
110010011001100010
Furniture100100100010
600600600010
110011001100010
Glass (S-Kit)100100100010
600600600010
110011001100010
ETD100100100010
300300300010
500500500010
BLS100100100010
300300300010
500500500010
WTMD100100100010
300300300010
500500500010
CAT100100100010
300300300010
500500500010
AT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
TRX100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
AIT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
EDS100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
0
Description of ServicesUnitUnit Price/RateQtyTOTALWeightWeighted TOTAL
Invoice ValidationDay020010
Site Design - CADHour040010
Site Lead - Inline CBT (CAT X and I)Day020010Total Weighted Price0
Site Lead - Inline CBT (CAT II, III, and IV)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - CPT (CAT X and I)Day020010
Site Lead - CPT (CAT II, III, and IV)Day020010
Temporary StorageWeek04010
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service Requirements not included in CLIN 0001Rate/% **0250000010
Program Management Services for IDIQ Contract (TO 02)Month01010
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month01010
0

* Weight multipliers of 1, 1.5, or 2, as designated in the TSA’s approved Source Selection Plan, will be applied consistently to every pricing worksheet for every proposal. The summation of these weighted prices for the total five year IDIQ contract period will be the Total Evaluated Price for each proposal

CENTRAL - Y2 TWP

CENTRAL - YEAR 2
TOTAL WEIGHTED PRICE (To Be Completed by TSA)
Equipment TypeShippingRiggingInstallationPackagingCratingTOTALWeightWeighted TOTAL
QtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotal
Lightweight FFE100100100010
120012001200010
350035003500010
510051005100010
Fixtures100100100010
120012001200010
350035003500010
510051005100010
Parts100100100100010
600100600600010
110010011001100010
Furniture100100100010
600600600010
110011001100010
Glass (S-Kit)100100100010
600600600010
110011001100010
ETD100100100010
300300300010
500500500010
BLS100100100010
300300300010
500500500010
WTMD100100100010
300300300010
500500500010
CAT100100100010
300300300010
500500500010
AT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
TRX100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
AIT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
EDS100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
0
Description of ServicesUnitUnit Price/RateQtyTOTALWeightWeighted TOTAL
Invoice ValidationDay020010
Site Design - CADHour040010
Site Lead - Inline CBT (CAT X and I)Day020010Total Weighted Price0
Site Lead - Inline CBT (CAT II, III, and IV)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - CPT (CAT X and I)Day020010
Site Lead - CPT (CAT II, III, and IV)Day020010
Temporary StorageWeek04010
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service Requirements not included in CLIN 0001Rate/% **0250000010
Program Management Services for IDIQ Contract (TO 02)Month01010
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month01010
0

* Weight multipliers of 1, 1.5, or 2, as designated in the TSA’s approved Source Selection Plan, will be applied consistently to every pricing worksheet for every proposal. The summation of these weighted prices for the total five year IDIQ contract period will be the Total Evaluated Price for each proposal

CENTRAL - Y3 TWP

CENTRAL - YEAR 3
TOTAL WEIGHTED PRICE (To Be Completed by TSA)
Equipment TypeShippingRiggingInstallationPackagingCratingTOTALWeightWeighted TOTAL
QtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotal
Lightweight FFE100100100010
120012001200010
350035003500010
510051005100010
Fixtures100100100010
120012001200010
350035003500010
510051005100010
Parts100100100100010
600100600600010
110010011001100010
Furniture100100100010
600600600010
110011001100010
Glass (S-Kit)100100100010
600600600010
110011001100010
ETD100100100010
300300300010
500500500010
BLS100100100010
300300300010
500500500010
WTMD100100100010
300300300010
500500500010
CAT100100100010
300300300010
500500500010
AT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
TRX100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
AIT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
EDS100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
0
Description of ServicesUnitUnit Price/RateQtyTOTALWeightWeighted TOTAL
Invoice ValidationDay020010
Site Design - CADHour040010
Site Lead - Inline CBT (CAT X and I)Day020010Total Weighted Price0
Site Lead - Inline CBT (CAT II, III, and IV)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - CPT (CAT X and I)Day020010
Site Lead - CPT (CAT II, III, and IV)Day020010
Temporary StorageWeek04010
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service Requirements not included in CLIN 0001Rate/% **0250000010
Program Management Services for IDIQ Contract (TO 02)Month01010
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month01010
0

* Weight multipliers of 1, 1.5, or 2, as designated in the TSA’s approved Source Selection Plan, will be applied consistently to every pricing worksheet for every proposal. The summation of these weighted prices for the total five year IDIQ contract period will be the Total Evaluated Price for each proposal

CENTRAL - Y4 TWP

CENTRAL - YEAR 4
TOTAL WEIGHTED PRICE (To Be Completed by TSA)
Equipment TypeShippingRiggingInstallationPackagingCratingTOTALWeightWeighted TOTAL
QtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotal
Lightweight FFE100100100010
120012001200010
350035003500010
510051005100010
Fixtures100100100010
120012001200010
350035003500010
510051005100010
Parts100100100100010
600100600600010
110010011001100010
Furniture100100100010
600600600010
110011001100010
Glass (S-Kit)100100100010
600600600010
110011001100010
ETD100100100010
300300300010
500500500010
BLS100100100010
300300300010
500500500010
WTMD100100100010
300300300010
500500500010
CAT100100100010
300300300010
500500500010
AT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
TRX100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
AIT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
EDS100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
0
Description of ServicesUnitUnit Price/RateQtyTOTALWeightWeighted TOTAL
Invoice ValidationDay020010
Site Design - CADHour040010
Site Lead - Inline CBT (CAT X and I)Day020010Total Weighted Price0
Site Lead - Inline CBT (CAT II, III, and IV)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - CPT (CAT X and I)Day020010
Site Lead - CPT (CAT II, III, and IV)Day020010
Temporary StorageWeek04010
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service Requirements not included in CLIN 0001Rate/% **0250000010
Program Management Services for IDIQ Contract (TO 02)Month01010
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month01010
0

* Weight multipliers of 1, 1.5, or 2, as designated in the TSA’s approved Source Selection Plan, will be applied consistently to every pricing worksheet for every proposal. The summation of these weighted prices for the total five year IDIQ contract period will be the Total Evaluated Price for each proposal

CENTRAL - Y5 TWP

CENTRAL - YEAR 5
TOTAL WEIGHTED PRICE (To Be Completed by TSA)
Equipment TypeShippingRiggingInstallationPackagingCratingTOTALWeightWeighted TOTAL
QtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotalQtyUnit PriceTotal
Lightweight FFE100100100010
120012001200010
350035003500010
510051005100010
Fixtures100100100010
120012001200010
350035003500010
510051005100010
Parts100100100100010
600100600600010
110010011001100010
Furniture100100100010
600600600010
110011001100010
Glass (S-Kit)100100100010
600600600010
110011001100010
ETD100100100010
300300300010
500500500010
BLS100100100010
300300300010
500500500010
WTMD100100100010
300300300010
500500500010
CAT100100100010
300300300010
500500500010
AT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
TRX100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
AIT100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
EDS100100100100010
100100100100010
100100100100010
100100100100010
200100200200010
200100200200010
200100200200010
200100200200010
0
Description of ServicesUnitUnit Price/RateQtyTOTALWeightWeighted TOTAL
Invoice ValidationDay020010
Site Design - CADHour040010
Site Lead - Inline CBT (CAT X and I)Day020010Total Weighted Price0
Site Lead - Inline CBT (CAT II, III, and IV)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - Stand-Alone CBT (CAT X and I)Day020010
Site Lead - CPT (CAT X and I)Day020010
Site Lead - CPT (CAT II, III, and IV)Day020010
Temporary StorageWeek04010
Site SurveyLotTBD by TO
Site PrepLotTBD by TO
Site RestorationLotTBD by TO
Fixed Fee for Cost-Reimbursable Service Requirements not included in CLIN 0001Rate/% **0250000010
Program Management Services for IDIQ Contract (TO 02)Month01010
Program Management Services for Adhoc Shipping/Rigging/Installation (TO 01)Month01010
0

* Weight multipliers of 1, 1.5, or 2, as designated in the TSA’s approved Source Selection Plan, will be applied consistently to every pricing worksheet for every proposal. The summation of these weighted prices for the total five year IDIQ contract period will be the Total Evaluated Price for each proposal

CENTRAL - TOTAL TEP

CENTRAL - TOTAL
TOTAL EVALUATED PRICE (To Be Completed by TSA)
YEAR 10
YEAR 20
YEAR 30
YEAR 40
YEAR 50
TEP0