C_TEAMS Task Order 1.doc
DOC document 26 KB Posted
- Solicitation number
- HDTRA2-08-R-0002
- Issued by
-
Defense Threat Reduction Agency
About this file
SampleTask Oder 1 dated 11 Sep 09.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TEAMS SF30 Amend 0004.pdf | ||
| TEAMS SF33 and RFP Slip pg 54.pdf | ||
| TEAMS Final Questions and Answers SEP 30.doc | DOC document | |
| SF30 TEAMS.pdf | ||
| TEAMS RFP-Questions Answers Final.doc | DOC document | |
| C_TEAMS Task Order 2.doc | DOC document | |
| TEAMS Pre-proposal Briefing 4 Sep 2009.ppt | PPT presentation | |
| TEAMS SF30 Amend 0002.pdf | ||
| C_TEAMS SOW.doc | DOC document | |
| TEAMS PRE SIGN_IN SHEET.doc | DOC document | |
| C_TEAMS Socio-Economic Commitment_R.pdf | ||
| C_TEAMS Task Order 2.doc | DOC document | |
| C_TEAMS Wage Determination.pdf | ||
| C_TEAMS Task Order 1.doc | DOC document | |
| C_TEAMS DD254.pdf | ||
| C_RFP TEAMS.doc | DOC document | |
| C_TEAMS SOW.doc | DOC document | |
| C_TEAMS RATE TABLE.xls | XLS spreadsheet | |
| C_TEAMS CDRLs.pdf | ||
| C_TEAMS ATTACHMENT L1 and L2.doc | DOC document | |
| C_TEAMS Socio-Economic Commitment.xls | XLS spreadsheet |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
HDTRA2-08-R-0002
Sample Task Order 1
Statement of Work
“TEAMS FACILITY MAINTENANCE AND OPERATIONS SUPPORT”
September 11, 2009
1.0 OBJECTIVE: This maintenance task order is to provide general administration and operation support for the overall contract to include maintenance, documentation, and operation of Government Furnished Equipment and Facilities at DTRA’s TEAMS facility, located on Kirtland Air Force Base (KAFB).
2.0 DESCRIPTION: The contractor shall perform the following tasks in accomplishing the requirements of this TO over a five- (5) year period.
2.1 Facility Management: The contractor shall manage the execution of all tasks to associated with infrastructure planning, environmental planning, submitting KAFB work order requests for TEAMS.
2.1.1 The contractor shall provide a Task Order Management Plan and Task Order Progress Report for the effort and the contractor shall update as required. The Task Order Cost Performance Report shall include all Task Orders under the TEAMS contract. The contractor shall develop a detailed management plan. This plan shall outline a full and detailed work breakdown structure as well as a master schedule with a complete discussion of timelines, resources required, and associated technological risks. (CDRLs A001, A002, and A006)
2.2 Operational Services: The contractor shall maintain the operational status of the TEAMS facility to associated infrastructure, IT systems, facility vehicles, video cameras, facility cleanliness, visitor control, security, personnel and facility safety.
2.2.1 Facility Security: The contractor shall conduct daily security checks of the TEAMS facility associated with facility fenced perimeter, buildings, safes, personnel, vehicles, and radiation sources. The contractor shall provide administration operation of the TEAMS IT security system.
2.2.2 Environmental Management: The contractor shall be responsible for returning the Kirtland Air Force Base (KAFB) test site to its pretest condition in accordance with Federal, DoD, and KAFB regulations, and shall perform pretest environmental assessments. This shall be documented in an environmental assessment report and shall include all hazards developed during use, all cleanup actions required, and those actually performed. (CDRL A004)
2.2.3 TEAMS Facility Visitor Control: The contractor shall monitor TEAMS facility visitors.
2.2.4 Tours and Demonstrations: The contractor shall conduct tours or demonstrations of the TEAMS facility or assigned programs as requested.
2.2.5 Facility and Personal Safety: The contractor shall develop safety plans, provide safety training as applicable, and maintain safety oversight for all contract operations. (CDRL A004)
2.2.6 Custodial Services: The contractor shall escort custodial service personnel contractually assigned to TEAMS facilities.
2.2.7 Hazardous Material Residue: The contractor shall be responsible for the removal, destruction, and/or clean up of all hazardous material residue, including leftover explosives.
2.2.8 Procedures and Support Plans: The contractor shall prepare Standard Operating
Procedures and Experimental Support Plans as required. (CDRL A004)
PAGE
HDTRA2-08-R-0002
File details come from the government source that posted it. Updated .