H.01.01 794_AIT_PH4_SID_RTA_SUBMITTAL.pdf
PDF 1 MB Posted
- Attached to
- AIT Barracks Fort Eustis VA (Amendment 0004) Federal contract opportunity
- Solicitation number
- W9123620B0015
About this file
This document package includes interior design specifications and drawings for the structural interior design (SID) of Phase 4 of the AIT Barracks at Fort Eustis, Virginia. The specifications cover interior finish materials and schedules, floor and wall patterns, signage placement, and furniture plans for all areas on the first and second floors. Key interior finishes and products specified include ceiling tiles, wall bases, metal bullnose wall tiles, transition strips, corner guards, paints, floor tiles, toilet partitions, resilient flooring, laminate, solid surfaces, entry mats, grouts, rubber flooring, static dissipative tiles, window blinds, and wall protection. The related federal contract opportunity is solicitation number W9123620B0015 for the construction of the AIT Barracks at Fort Eustis, with an amendment date of 04/01/2020. Drawings associated with the solicitation can be requested from the Department of the Army Corps of Engineers Engineering District in Norfolk.
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks Fort Eustis VA (Amendment 0004) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIT BARRACKS PHASE 4
STUCTURAL INTERIOR
DESIGN (SID)
RTA SUBMITTAL
02/18/2020
Norfolk District U.S. Army Corps of Engineers Engineering and Construction Division Engineering Branch 803 Front Street Norfolk, VA 23510
US Army Corps Of Engineers
Property of the United States Government
TABLE OF CONTENTS
1.0 Structural Interior Design (SID) / Narrative
2.0 General Notes
3.0 Color Boards
4.0 Drawings
AIT BARRACKS – PHASE 4
STRUCTURAL INTERIOR DESIGN (SID)
GENERAL DESCRIPTION/ NARRATIVE
• The Structural Interior Design (SID) is being provided in accordance with UFC 3-120-10, Interior Design.
The objective of a functional, aesthetically pleasing, and value centered facility provided the basis for interior finish material selections. Specified and illustrated products, all suited for commercial application, answer not only the main priority of appearance retention but also will meet or exceed project requirements of durability, ease of maintenance. Sustainable characteristics and/or recycled content were paramount considerations in developing the interior finish package.
The requirement for the selection of the interior materials within the scheme is to provide a completely neutral envelope. This concept will allow the environment’s aesthetics to be timeless while providing the opportunity to re-evaluate and modify the theme and personality of the space when needed or desired. Colors/finishes were distributed in such a way as to represent an essentially neutral scheme, but pattern, texture and the correct mix of selected colors raise the level of quality and style representative of the building’s function and population.
In conclusion, the interior environment will complement the building’s architectural style, and provide long-term value and performance for all occupants. This binder contains the schedules, samples, and documentation of the interior finish schemes for this 100% submittal.
AIT BARRACKS – PHASE 4
AIT BARRACKS – PHASE 4
Property of the United States Government
US Army Corps Of Engineers
GENERAL NOTES
CLARIFICATION AND QUESTIONS
Should clarifications be necessary or questions arise relating to these specifications or furnishings plans, contact Crystal R, Giltinan Norfolk Army Corps of Engineers - Architecture, Telephone: 757-201-7658 or email Crystal.Giltinan@usace.army.mil
AIT BARRACKS – PHASE 4
ACT-1
MANUFACTURER:
Armstrong
APPLICATION:
Ceiling Tile
RB-1
MANUFACTURER:
Johnsonite
Wall Base
RB-2
MANUFACTURER:
Johnsonite
Wall Base
HM-1
MANUFACTURER:
Schluter Systems
APPLICATION:
Metal Bullnose Wall Tile Edging
TS-1
MANUFACTURER:
Schluter Systems
Transition Strip
CG-1
MANUFACTURER:
Koroguard
Corner Guard
CR-1
Schluter
APPLICATION: Wall Protection Edging Trim
PT-1
MANUFACTURER:
Sherwin Williams
APPLICATION:
Paint
PT-2
MANUFACTURER:
Scuffmaster
APPLICATION:
Paint
PT-3
MANUFACTURER:
Scuffmaster
Paint
PT-4
Scuffmaster
WS-1
Miniwax
Wood Stain
PT-5
Scuffmaster
PRC-1
MANUFACTURER:
Daltile
Floor Tile
PRC-2/PTB-1
MANUFACTURER:
Daltile
Corridor Floor Tile/Wall Base
PRC-3/PTB-2
MANUFACTURER:
Daltile
Floor Tile/Wall Base
PRC-4
MANUFACTURER:
Crossville
APPLICATION:
Bathroom Wall Tile
TP-1
MANUFACTURER:
Laminating Technologies
Toilet Partition
RF-1
MANUFACTURER:
Patcraft
APPLICATION:
Resilient Flooring
RF-2
MANUFACTURER:
Patcraft
Resilient Flooring
LAM-1
MANUFACTURER:
Pionite
APPLICATION:
Laminate
SS-1
MANUFACTURER:
Corian
APPLICATION:
Solid Surface (Sills, Sinks, Reception Desk)
RFM-1
MANUFACTURER:
Mats Inc.
Recessed Entry Mat
GR-1
MANUFACTURER:
Fusion Pro
Grout
GR-2
Mapei
Grout
ARF-1
MANUFACTURER:
Johnsonite
APPLICATION:
Rubber Floor (Recovery Room)
IS-1
MANUFACTURER:
Takeform
Interior Signage
VCT-1
MANUFACTURER:
Armstrong
Static Dissipative Tile
WB-1
Bali Blinds
Window Blinds
WP-1
MANUFACTURER:
Koroseal
Wall Protection
IS-1
Takeform
Interior Signage
| Table of Contents |
| General Description/ Narrative |
| General Notes |
| Color Boards |
| Drawings |
| Sheets |
| I-001 - ABBREVIATION |
| I-002 - INTERIOR FINISH LEGEND |
| I-003 - INTERIOR FINISH LEGEND |
| I-004 - INTERIOR FINISH SCHEDULE |
| I-005 - INTERIOR FINISH SCHEDULE |
| I-006 - INTERIOR FINISH SCHEDULE |
| I-007 - INTERIOR FINISH SCHEDULE |
| I-008 - INTERIOR FINISH SCHEDULE |
| I-009 - INTERIOR FINISH SCHEDULES BID OPTIONS |
| I-101 - OVERALL FIRST FLOOR PATTERN PLAN |
| I-102 - OVERALL SECOND FLOOR PATTERN PLAN |
| I-111 - FIRST FLOOR PATTERN PLAN - AREA A |
| I-112 - FIRST FLOOR PATTERN PLAN - AREA B |
| I-113 - FIRST FLOOR PATTERN PLAN - AREA C |
| I-114 - FIRST FLOOR PATTERN PLAN - AREA D |
| I-115 - FIRST FLOOR PATTERN PLAN - AREA E |
| I-115A - FIRST FLOOR PATTERN PLAN - AREA E BID OPTION POOL |
| I-116 - FIRST FLOOR PATTERN PLAN - AREA F |
| I-116B - FIRST FLOOR PATTERN PLAN - AREA F BID OPTION INDOOR RANGE |
| I-121 - SECOND FLOOR PATTERN PLAN - AREA A |
| I-122 - SECOND FLOOR PATTERN PLAN - AREA B |
| I-123 - SECOND FLOOR PATTERN PLAN - AREA C |
| I-124 - SECOND FLOOR PATTERN PLAN - AREA D |
| I-125 - SECOND FLOOR PATTERN PLAN - AREA E |
| I-125A - SECOND FLOOR PATTERN PLAN - AREA E BID OPTION POOL |
| I-126 - SECOND FLOOR PATTERN PLAN - AREA F |
| I-151 - FLOOR FINISH DETAILS |
| I-152 - ENLARGED FIRST FLOOR PATTERN PLANS |
| I-153 - ENLARGED SECOND FLOOR PATTERN PLANS |
| I-161 - FLOOR PATTERN DETAILS |
| I-211 - FIRST FLOOR WALL FINISH PLAN - AREA A |
| I-212 - FIRST FLOOR WALL FINISH PLAN - AREA B |
| I-213 - FIRST FLOOR WALL FINISH PLAN - AREA C |
| I-214 - FIRST FLOOR WALL FINISH PLAN - AREA D |
| I-215 - FIRST FLOOR WALL FINISH PLAN - AREA E |
| I-215A - FIRST FLOOR WALL FINISH PLAN - AREA E BID OPTION POOL |
| I-216 - FIRST FLOOR WALL FINISH PLAN - AREA F |
| I-216B - FIRST FLOOR WALL FINISH PLAN - AREA F BID OPTION INDOOR RANGE |
| I-221 - SECOND FLOOR WALL FINISH PLAN - AREA A |
| I-222 - SECOND FLOOR WALL FINISH PLAN - AREA B |
| I-223 - SECOND FLOOR WALL FINISH PLAN - AREA C |
| I-224 - SECOND FLOOR WALL FINISH PLAN - AREA D |
| I-225 - SECOND FLOOR WALL FINISH PLAN - AREA E |
| I-226 - SECOND FLOOR WALL FINISH PLAN - AREA F |
| I-261 - WALL PATTERN DETAILS |
| I-262 - WALL PATTERN DETAIL |
| I-311 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA A |
| I-312 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA B |
| I-313 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA C |
| I-314 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA D |
| I-315 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA E |
| I-315A - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA E POOL OPTION |
| I-316 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA F |
| I-316B - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA F BID OPTION INDOOR RANGE |
| I-321 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA A |
| I-322 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA B |
| I-323 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA C |
| I-324 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA D |
| I-325 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA E |
| I-326 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA F |
| I-351 - INTERIOR SIGNAGE DETAILS |
| I-361 - EXTERIOR SIGNAGE DETAILS |
| I-371 - SIGNAGE SCHEDULE |
| I-372 - SIGNAGE SCHEDULE |
| I-373 - SIGNAGE SCHEDULE BID OPTION INDOOR RANGE |
| IF001 - FURNITURE LEGEND |
| IF002 - FURNITURE LEGEND |
| IF101 - OVERALL FIRST FLOOR FURNITURE PLAN |
| IF102 - OVERALL SECOND FLOOR FURNITURE PLAN |
| IF111 - FIRST FLOOR FURNITURE PLAN - AREA A |
| IF112 - FIRST FLOOR FURNITURE PLAN - AREA B |
| IF113 - FIRST FLOOR FURNITURE PLAN - AREA C |
| IF114 - FIRST FLOOR FURNITURE PLAN - AREA D |
| IF115 - FIRST FLOOR FURNITURE PLAN - AREA E |
| IF116 - FIRST FLOOR FURNITURE PLAN - AREA F |
| IF121 - SECOND FLOOR FURNITURE PLAN - AREA A |
| IF122 - SECOND FLOOR FURNITURE PLAN - AREA B |
| IF123 - SECOND FLOOR FURNITURE PLAN - AREA C |
| IF124 - SECOND FLOOR FURNITURE PLAN - AREA D |
| IF125 - SECOND FLOOR FURNITURE PLAN - AREA E |
| IF126 - SECOND FLOOR FURNITURE PLAN - AREA F |
| Blank Page |
| SID AIT100_final.pdf |
| Blank Page |
| Blank Page |
| AIT ARMY BARRACKS PHASE-4 - SID 100% F.pdf |
| Table of Contents |
| General Description/ Narrative |
| General Notes |
| Color Boards |
| Drawings |
| Sheets |
| I-001 - ABBREVIATION |
| I-002 - INTERIOR FINISH LEGEND |
| I-003 - INTERIOR FINISH LEGEND |
| I-004 - INTERIOR FINISH SCHEDULE |
| I-005 - INTERIOR FINISH SCHEDULE |
| I-006 - INTERIOR FINISH SCHEDULE |
| I-007 - INTERIOR FINISH SCHEDULE |
| I-008 - INTERIOR FINISH SCHEDULE |
| I-009 - INTERIOR FINISH SCHEDULES BID OPTIONS |
| I-101 - OVERALL FIRST FLOOR PATTERN PLAN |
| I-102 - OVERALL SECOND FLOOR PATTERN PLAN |
| I-111 - FIRST FLOOR PATTERN PLAN - AREA A |
| I-112 - FIRST FLOOR PATTERN PLAN - AREA B |
| I-113 - FIRST FLOOR PATTERN PLAN - AREA C |
| I-114 - FIRST FLOOR PATTERN PLAN - AREA D |
| I-115 - FIRST FLOOR PATTERN PLAN - AREA E |
| I-115A - FIRST FLOOR PATTERN PLAN - AREA E BID OPTION POOL |
| I-116 - FIRST FLOOR PATTERN PLAN - AREA F |
| I-116B - FIRST FLOOR PATTERN PLAN - AREA F BID OPTION INDOOR RANGE |
| I-121 - SECOND FLOOR PATTERN PLAN - AREA A |
| I-122 - SECOND FLOOR PATTERN PLAN - AREA B |
| I-123 - SECOND FLOOR PATTERN PLAN - AREA C |
| I-124 - SECOND FLOOR PATTERN PLAN - AREA D |
| I-125 - SECOND FLOOR PATTERN PLAN - AREA E |
| I-125A - SECOND FLOOR PATTERN PLAN - AREA E BID OPTION POOL |
| I-126 - SECOND FLOOR PATTERN PLAN - AREA F |
| I-151 - FLOOR FINISH DETAILS |
| I-152 - ENLARGED FIRST FLOOR PATTERN PLANS |
| I-153 - ENLARGED SECOND FLOOR PATTERN PLANS |
| I-161 - FLOOR PATTERN DETAILS |
| I-211 - FIRST FLOOR WALL FINISH PLAN - AREA A |
| I-212 - FIRST FLOOR WALL FINISH PLAN - AREA B |
| I-213 - FIRST FLOOR WALL FINISH PLAN - AREA C |
| I-214 - FIRST FLOOR WALL FINISH PLAN - AREA D |
| I-215 - FIRST FLOOR WALL FINISH PLAN - AREA E |
| I-215A - FIRST FLOOR WALL FINISH PLAN - AREA E BID OPTION POOL |
| I-216 - FIRST FLOOR WALL FINISH PLAN - AREA F |
| I-216B - FIRST FLOOR WALL FINISH PLAN - AREA F BID OPTION INDOOR RANGE |
| I-221 - SECOND FLOOR WALL FINISH PLAN - AREA A |
| I-222 - SECOND FLOOR WALL FINISH PLAN - AREA B |
| I-223 - SECOND FLOOR WALL FINISH PLAN - AREA C |
| I-224 - SECOND FLOOR WALL FINISH PLAN - AREA D |
| I-225 - SECOND FLOOR WALL FINISH PLAN - AREA E |
| I-226 - SECOND FLOOR WALL FINISH PLAN - AREA F |
| I-261 - WALL PATTERN DETAILS |
| I-262 - WALL PATTERN DETAIL |
| I-311 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA A |
| I-312 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA B |
| I-313 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA C |
| I-314 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA D |
| I-315 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA E |
| I-315A - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA E POOL OPTION |
| I-316 - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA F |
| I-316B - FIRST FLOOR SIGNAGE PLACEMENT PLAN - AREA F BID OPTION INDOOR RANGE |
| I-321 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA A |
| I-322 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA B |
| I-323 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA C |
| I-324 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA D |
| I-325 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA E |
| I-326 - SECOND FLOOR SIGNAGE PLACEMENT PLAN - AREA F |
| I-351 - INTERIOR SIGNAGE DETAILS |
| I-361 - EXTERIOR SIGNAGE DETAILS |
| I-371 - SIGNAGE SCHEDULE |
| I-372 - SIGNAGE SCHEDULE |
| I-373 - SIGNAGE SCHEDULE BID OPTION INDOOR RANGE |
| IF001 - FURNITURE LEGEND |
| IF002 - FURNITURE LEGEND |
| IF101 - OVERALL FIRST FLOOR FURNITURE PLAN |
| IF102 - OVERALL SECOND FLOOR FURNITURE PLAN |
| IF111 - FIRST FLOOR FURNITURE PLAN - AREA A |
| IF112 - FIRST FLOOR FURNITURE PLAN - AREA B |
| IF113 - FIRST FLOOR FURNITURE PLAN - AREA C |
| IF114 - FIRST FLOOR FURNITURE PLAN - AREA D |
| IF115 - FIRST FLOOR FURNITURE PLAN - AREA E |
| IF116 - FIRST FLOOR FURNITURE PLAN - AREA F |
| IF121 - SECOND FLOOR FURNITURE PLAN - AREA A |
| IF122 - SECOND FLOOR FURNITURE PLAN - AREA B |
| IF123 - SECOND FLOOR FURNITURE PLAN - AREA C |
| IF124 - SECOND FLOOR FURNITURE PLAN - AREA D |
| IF125 - SECOND FLOOR FURNITURE PLAN - AREA E |
| IF126 - SECOND FLOOR FURNITURE PLAN - AREA F |
File details come from the government source that posted it. Updated .