Attachment_A_-_SITE_VISIT_Info_Sheet_(Bryan_Courthouse)_FINAL.pdf

PDF 154 KB Posted

Attached to
General Construction for Perimeter Security Improvements Project
Solicitation number
GS11P16MKC7003
Issued by

About this file

Site visit information sheet

View the file

Other files

File Type Posted
Amendment_5_to_GS11P16MKC7003.pdf PDF
Amendment_4_to_GS11P16MKC7003.pdf PDF
Site_Visit__2_Sign_In_Sheet.pdf PDF
Amendment_3_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_321413_(Unit_Paving)_dated_3_June_2016.pdf PDF
Revised_DWG_DETAILS_L503_dated_3_June_2016.pdf PDF
GC_Past_Performance_Reference_Form.pdf PDF
Amendment_1_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_334100_(Storm_Piping)_dated_3_June_2016.pdf PDF
The_Solicitation_dated_9June16_Revised.pdf PDF
Attachment_A_-_SITE_VISIT_Info_Sheet_Revised.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment_11_EnvironmentalAssessment_Jan_2012.pdf PDF
GSA527-15.pdf PDF
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
Attachment 12B_Traffic Impact Study.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment_3__Final_Drawing_Mylar_Submission.pdf PDF
Attachment_12B_Traffic_Impact_Study.pdf PDF
Pricing_Sheet.pdf PDF
Attachment_6B_C D-Waste-Monthly-Report.PerimeterSecurity_(1).xlsx XLSX spreadsheet
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment_5_Safety__and_Health_Specification_Section_01546.pdf PDF
The_Agreement_Small_Business_Set-Aside_GC_FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Attachment_2_Project_Specifications_Manual_6_March_2015.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment_4_ConstructionWasteMgmt_and_Disposal_Spec.pdf PDF
Attachment_12A_Traffic_Impact_Study_Jan_2012.pdf PDF
Attachment_9_Geotechnical_Engineering_Report_3_March_2015.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
The_Solicitation_Small_Business_Set_Aside_GC_LPTA__FINAL.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment_8_USMSContractor_Security_clearance_request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
C301_GC_Reps_ _Certs.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA, National Capital Region

Perimeter Security Improvements at the Bryan Courthouse

Solicitation: GS-11-P-16-MK-C-7003

Non-Mandatory Site Visit Information Sheet

1. Agency:

General Services Administration, Public Buildings Svc, NCR, Office of Acquisition, Capital Construction

301 7 th St SW, Washington DC

Jane Facchina, Contracting Officer

202-680-0276, jane.facchina@gsa.gov

2. Project Name:

Construction Contract for Perimeter Security

Improvement Project at the Bryan Courthouse

3. Site Visit POCs:

Gelencia Millwood, GSA Gelencia.Millwood@gsa.gov

John Bolen, USMS

Participants must possess and present either a valid driver’s license or passport with a picture ID to gain access to the

Site Visit. Participants will be required to sign in at the site visit.

4. Date and Time of Site Visit:

DATE: 14 June 2016 (Tuesday)

ARRIVAL: NO LATER than 9:30 AM to be processed through Security.

SITE VISIT Starts Promptly at

10:00 AM and goes until 1:00pm

5. SITE VISIT INFORMATION:

Offerors shall arrive no later than 9:30 AM at the 401 Courthouse Square Alexandria, Virginia 22314 to begin the security screening process. If you arrive after 9:30 AM, you will not be processed in time for the tour. The pre-bid conference will begin promptly at 10:00 AM (followed by a site visit) in the Jury Assembly Room located on the third floor, Room 302. The visit is expected to be completed by 1:00pm.

A Government issued, valid picture I.D. is required for entry into the site. A valid and current state issued driver’s license is preferred.

No electronic devices (cameras, cell phones with cameras, smart watches, laptops, computer tablets, and/or recording devices) will be allowed inside the Courthouse. There is no a holding option or otherwise storage available for electronics inside or on the Courthouse grounds.

Do not bring anyone on the tour whose required information was not submitted to POCs by 1:00 PM on 10 June

2016. They will not be permitted to enter the site or join the tour.

Offeror's representative must remain with the tour at all times. Offeror's representatives must NOT deviate from the tour route, enter unauthorized spaces, make noises, speak loudly, touch or disturb Government property and/or disrupt Government operations while on the tour.

Offerors may bring paper and pencils to write questions for submissions per RFI Instruction Sheet. Do not ask questions regarding scope issues during the tour. All such questions shall be formally submitted in writing.

Offerors are not permitted to note or sketch any information deemed sensitive but unclassified (SBU).

Wear comfortable shoes.

mailto:jane.facchina@gsa.gov mailto:Gelencia.Millwood@gsa.gov

File details come from the government source that posted it. Updated .