Sheet1

Attachment 7B
Construction and Demolition Waste Management Report
Project Name: Perimeter Security Improvement
Project Location: 401 Courthouse Square, Alexandria Virginia 22314
If this report includes the waste results from other concurrent projects at the facility, indicate these project names here:
DateWaste DescriptionHauler of Waste MaterialName and Location of Waste Processing FacilityTotal Weight (tons) of Waste MaterialMethod of Waste Material Disposal or Diversion (Salvage, Reuse, Recycle, Incinerate, or Landfill)Reason Why Waste Not Diverted
Total:
Total Weight Of Waste Materials For Entire Project(s) (tons):
Total Weight Of Waste Materials For Entire Project(s) Reused, Recycled, or Salvaged (tons):
Percentage Of Waste Materials For Entire Project(s) Reused, Recycled, or Salvaged (%):

Certification by Firm

I, _________________________________ (name of certifier), am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

__________________________________________________
[Signature of the Officer or Employee]
__________________________________________________
[Typed Name of the Officer or Employee]
__________________________________________________
[Title]
__________________________________________________
[Name of Company, Firm, or Organization]
__________________________________________________
[Date]

Sheet2

Sheet3 image00.png

Other files for this federal contract opportunity

Other files attached to General Construction for Perimeter Security Improvements Project, newest first.
File Type Posted
Amendment_5_to_GS11P16MKC7003.pdf PDF
Amendment_4_to_GS11P16MKC7003.pdf PDF
Site_Visit__2_Sign_In_Sheet.pdf PDF
Amendment_3_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_321413_(Unit_Paving)_dated_3_June_2016.pdf PDF
Revised_DWG_DETAILS_L503_dated_3_June_2016.pdf PDF
GC_Past_Performance_Reference_Form.pdf PDF
Amendment_1_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_334100_(Storm_Piping)_dated_3_June_2016.pdf PDF
The_Solicitation_dated_9June16_Revised.pdf PDF
Attachment_A_-_SITE_VISIT_Info_Sheet_Revised.pdf PDF
Revised_Pricing_Sheet_dated_9_June_2016.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment_11_EnvironmentalAssessment_Jan_2012.pdf PDF
GSA527-15.pdf PDF
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
Attachment 12B_Traffic Impact Study.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment_3__Final_Drawing_Mylar_Submission.pdf PDF
Attachment_12B_Traffic_Impact_Study.pdf PDF
Pricing_Sheet.pdf PDF
Attachment_6B_C D-Waste-Monthly-Report.PerimeterSecurity_(1).xlsx XLSX spreadsheet
Attachment_5_Safety__and_Health_Specification_Section_01546.pdf PDF
The_Agreement_Small_Business_Set-Aside_GC_FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Attachment_2_Project_Specifications_Manual_6_March_2015.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment_4_ConstructionWasteMgmt_and_Disposal_Spec.pdf PDF
Attachment_12A_Traffic_Impact_Study_Jan_2012.pdf PDF
Attachment_9_Geotechnical_Engineering_Report_3_March_2015.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
The_Solicitation_Small_Business_Set_Aside_GC_LPTA__FINAL.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment_8_USMSContractor_Security_clearance_request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
C301_GC_Reps_ _Certs.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Show all 50

General Construction for Perimeter Security Improvements Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .