Amendment_3_to_GS11P16MKC7003.pdf

PDF 659 KB Posted

Attached to
General Construction for Perimeter Security Improvements Project Federal contract opportunity
Solicitation number
GS11P16MKC7003
Issued by
General Services Administration Public Buildings Service National Capital Region

View the file

Other files for this federal contract opportunity

Other files attached to General Construction for Perimeter Security Improvements Project, newest first.
File Type Posted
Amendment_5_to_GS11P16MKC7003.pdf PDF
Amendment_4_to_GS11P16MKC7003.pdf PDF
Site_Visit__1_Sign_In_sheet.pdf PDF
Amendment_2_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_321413_(Unit_Paving)_dated_3_June_2016.pdf PDF
Revised_DWG_DETAILS_L503_dated_3_June_2016.pdf PDF
GC_Past_Performance_Reference_Form.pdf PDF
Amendment_1_to_GS11P16MKC7003.pdf PDF
Attachment_1_-_Statement_of_Work_dated_9_June_2016.pdf PDF
Attachment_13_-_Tactile_Warning_Surfacing_321726_dated_3_June_2016.pdf PDF
Revised_Spec_Section_334100_(Storm_Piping)_dated_3_June_2016.pdf PDF
The_Solicitation_dated_9June16_Revised.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment_11_EnvironmentalAssessment_Jan_2012.pdf PDF
GSA527-15.pdf PDF
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
Attachment 12B_Traffic Impact Study.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment_3__Final_Drawing_Mylar_Submission.pdf PDF
Attachment_10_ALTA-ACSM_Final_Survey_06-24-15_(1).pdf PDF
Attachment_6A_C D-Waste-Monthly-Report.PerimeterSecurity_(2).xlsx XLSX spreadsheet
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
C301_GC_Reps_ _Certs.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment_7_Davis_Bacon_Wage_Rate_VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
Attachment_12B_Traffic_Impact_Study.pdf PDF
Pricing_Sheet.pdf PDF
Attachment_6B_C D-Waste-Monthly-Report.PerimeterSecurity_(1).xlsx XLSX spreadsheet
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment_5_Safety__and_Health_Specification_Section_01546.pdf PDF
The_Agreement_Small_Business_Set-Aside_GC_FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Attachment_2_Project_Specifications_Manual_6_March_2015.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
SF_24-98.pdf PDF
Pricing_Sheet.pdf PDF
The_Solicitation_Small_Business_Set_Aside_GC_LPTA__FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
Show all 50

General Construction for Perimeter Security Improvements Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

GS11P16MKC7003

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

Amendment 03

3. EFFECTIVE DATE

6/21/2016

REQUISITION/PURCHASE REQ. NO.

PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

GSA, NCR, PBS,

Office of Acquisition, Capital Construction 301 7th Street, SW Room 6651 Washington, DC 20407

GSA, NCR, PBS,

Office of Acquisition, Capital Construction 301 7th Street, SW Room 6651 Washington, DC 20407

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9.A. AMENDMENT OF SOLICITATION NO.

(X)

GS11P16MKC7003

To All Prospective Offerors

9B. DATED (SEE ITEM 11)

6/3/2016

TOTAL SMALL BUSINESS SET-ASIDE 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return ________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).

The solicitation is hereby amended as follows:

The following changes, clarifications, additions and supplements are hereby incorporated into this

SOLICITATION in their entirety as submitted. Continued on Page 2 of this Amendment Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jane Facchina, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY Jane Facchina .

(Signature of Contracting Officer)

16C. DATE SIGNED

6/21/2016

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

CONTINUATION OF SF 30: AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT

GS11P16MKC7003

Amendment No. 1

GS11P16MKC7003, General Construction Services for Perimeter Security Improvements at the

Bryan Courthouse, Alexandria, VA

ITEM A: A second site visit will be held on Wednesday, June 22, 2016 at 8:00am.

Offeror’s are to meet in the park directly across from the main entrance of the Courthouse located at 401 Courthouse Square Alexandra, VA 22314. All interested firms are to submit the names of attendees (no more than three (3) per firm) to Jane Facchina at Jane.Facchina@gsa.gov before Wednesday, June 22, 2016 at 7:00am.

Site Visit Reiterations: Offerors are required to bring a government issued, valid picture ID. No electronics are permitted.

ITEM B: The RFI due date has been extended to Thursday, June 23, 2016 at 9:00am.

All RFI’s are to be sent to Jane Facchina at Jane.Facchina@gsa.gov.

ITEM C: Reference Paragraph VI.B Lowest Price Technically Acceptable

Evaluation Process from the "The Solicitation" issued in Amendment #1.

DELETE Paragraph VI.B (1) and REPLACE with the following language:

VI.B Lowest Price Technically Acceptable Evaluation Process

(1) The Government will evaluate technical proposals on a pass/fail basis to determine if an offer meets the minimum technically acceptable requirements. Failure to meet a requirement may result in an offer being determined technically unacceptable. An unacceptable rating for any one factor makes the entire proposal unacceptable. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs. The government will evaluate the lowest priced offer received first and if deemed technically acceptable the award will be made to that firm and no other proposals will be reviewed. The next lowest priced proposal will be evaluated if the lowest price is technically unacceptable and if deemed technically acceptable the award will be made to that firm. This process will continue until a technically acceptable proposal is identified for award.

ITEM D: DELETE in its entirety “Pricing Sheet” as issued in the Amendment #1, and

INSERT the attached “Revised Pricing Sheet dated 21 June 2016”.

ITEM E: INSERT the attached “Responses to RFI Questions” dated 21 June 2016.

ITEM F: Reference “Attachment 2 – Project Specifications Manual 6 March 2016” issued in the RFP.

mailto:Jane.Facchina@gsa.gov mailto:Jane.Facchina@gsa.gov

CONTINUATION OF SF 30: AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT

GS11P16MKC7003

Amendment No. 1

REMOVE Specification Section 32 9113.19 dated March 6, 2016 and

INSERT the attached revised Specification Section 32 9113.19 dated June 20, 2016.

ITEM G: Reference “The Solicitation dated 9 June 16 Revised” section II.D.1 issued in Amendment #1.

REPLACE the “similar project” characteristics located in “Evaluation Factor 1

– Experience on Similar Projects” as follows:

FROM:

● Project involved the construction of any type of rated (min. rated K-4) vehicle perimeter security barrier system;

● Project was performed in an occupied and functioning office building or within a dense urban area;

● Project involved all of the following disciplines: landscape, civil and structural;

● Project included requirements for noise control in an occupied facility during operational hours and/or requirements for noise control within a dense urban setting.

Proposal must clearly demonstrate the noise constraint(s) and how noise controls were managed to the satisfaction of all stakeholders.

TO:

● Project involved the construction of any similar type of rated (min. rated K-4) vehicle perimeter security barrier system;

● Project involved all of the following disciplines: landscape, surveyor (documenting and relocating utilities), civil and structural;

Project included requirements for noise control in an occupied facility during operational hours and/or requirements for noise control within a dense urban setting. Proposal must clearly demonstrate the noise constraint(s) and how noise controls were managed to the satisfaction of all stakeholders.

ITEM H: Offerors must acknowledge receipt of this amendment on offer form, giving number and date.

END OF AMENDMENT NO. THREE (3)

Amended Pricing Sheet

Perimeter Security Improvement Project

6/9/2016; Updated 6/21/2016

Line No. Description Amount

Base Contract -150 calendar day schedule

1 Demo

2 Sitework

3 Security

4 Elec

5 Landscape

6 Street lights

7 (LI 1+ LI 2 + LI3 + LI4 + LI5 + LI6) Subtotal

8 General Conditions, Overhead, Profit

9 ( LI 7 + LI8) Base Contract Price -150 Day Schedule-Construction Total

Option 1: 200 calendar day schedule (amount of adjustment to LI 9 for longer schedule)

11 (LI9 - L10) Option 1 - Total Price

12 Unit Price 1 - Salvaged Brick (4,000sf) Allowance, Unit Price 1

13 Unit Price 2 - New Brick (4,000sf) Allowance, Unit Price 2

New signal gate and traffic light for Jamieson Avenue (if incompatible with new system) Add Alternate, 1

A.V. Bryan Courthouse Perimeter Security Improvement Project

RFP AMENDMENT 003 dated 21 June 2016

ATTACHMENT #1

Pre-Award (RFI) Questions and Answers (Questions 1 through 8)

1. QUESTION:

Specification Section 32 84 00 Part 1 1.1 A states “All planted areas, street trees, and lawn areas are to be irrigated on grade on the east, north, and west sides of the building, and in the interior courtyard.” Please confirm that there is no interior courtyard work in this SOW.

RESPONSE: Confirmed. There is no interior courtyard work in this SOW. (Carvalho & Good)

2. QUESTION:

Please specify manufacturer of the decorative metal sheath for fixed bollards.

RESPONSE: Custom fabricate per 057000 (GBR Architects)

3. QUESTION: Please specify manufacturer for the metal fence panels.

RESPONSE: Custom fabricate per 057000 (GBR Architects)

4. QUESTION: Please clarify the existing pavers construction details.

RESPONSE: Existing pavers are set on sand setting bed with sand swept joints. (Carvalho &

Good)

5. QUESTION: Please provide a specific location for the jersey barrier relocation

RESPONSE: Location will be within 50 miles of the National Capital Region.

6. QUESTION: Please clarify the anticipated start of construction.

RESPONSE: Award is subject to the availability of funding. As such the Government would like to award around August/September 2016.

7. QUESTION: Please provide specifications for the bio-retention soil.

RESPONSE: See attached revised Spec Section 32.9113.19 PLANTING SOIL (Carvalho &

Good).

A.V. Bryan Courthouse Perimeter Security Improvement Project

RFP AMENDMENT 003 dated 21 June 2016

8. QUESTION: Is a sump pump needed for the hydraulic bollard system?

RESPONSE: The basis of design bollards does not require a sump pump, as the drain out of the basin is a gravity drain. The basis of design bollard systems uses a biodegradable oil instead of hydraulic fluid. If a different yet equal product is used, an oil/water separator will be required.

Albert V. Bryan U.S. Courthouse Perimeter Security Improvements June 20, 2016

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY

Do not remove this notice – Properly destroy or return documents when no longer needed

PLANTING SOIL 329113.19 - 1

Geier Brown Renfrow Architects, LLC | Carvalho & Good, PLLC Final Submission

SECTION 32 9113.19

PLANTING SOIL

PART 1 - GENERAL

A. DESCRIPTION OF WORK

1. Furnish all labor, materials, tools, equipment, and services necessary for and reasonably incidental to complete the landscape planting work as shown on the drawings, or specified, including, but not limited to the following:

a. Planting Soil Mix and Amendments to a depth of 18” for all plantings and planted areas.

b. Planting Soil Mix and Amendments to a depth of 4” for all lawn areas.

c. Placement and compaction of soil mix.

B. QUALITY ASSURANCE

1. Planting soil preparation, mixing and placement shall be performed by a firm with a minimum of five years experience in this type of work, or shall show experience with successful installation of this type of work on two similar projects.

C. SUBMITTALS

1. Submit to the Architect copies of manufacturer’s and/or source data for all materials including soils.

2. Samples: Submit to the Architect samples of topsoil, sand, organic matter, and mineral additive to be used in the making of the planting soil mix, and the final planting soil mix.

Samples shall weigh one pound and be packaged in plastic Ziplock bags. Samples shall be typical of the lot of material to be delivered to the site and provide an accurate indication of color, texture, and organic make-up of the material. Soil analyses of the topsoil and of the planting soil mix, stating pH, nutrient levels (N, P, K), and a mechanical analysis of the topsoil conducted in accordance with ASTM D-422 shall be made by a qualified soil testing lab and submitted to the Architect prior to use. The soil analysis must give recommendations for soil amendments for the intended use.

a. Soil Chemical Analysis: Submit a soil chemical analysis performed by a recognized testing laboratory. Soil analysis shall contain recommendations for adjustments to obtain optimum pH, nitrogen, phosphorous, potassium, soluble salts and trace elements.

1). Provide additive and amendments recommended by the testing laboratory upon review and approval or adjustment of the Architect.

2). Provide a minimum of three particle size analysis tests from samples obtained randomly throughout the source stock pile or field.

b. Testing and all adjustments and amendments shall be at the Contractor’s expense.

D. PROJECT CONDITIONS

Do not remove this notice – Properly destroy or return documents when no longer needed

PLANTING SOIL 329113.19 - 2

1. Identify and protect building waterproofing during placement of planting soil mixture. Do not allow soil mix to penetrate or disturb system (waterproof membrane, protection board, drainage fabric and soil separator) at any time during placement and installation of planting soils.

2. Identify and protect any underground utilities present within the area(s) of work.

3. Prior to installation of soil mix, test the drainage system for proper operation in the presence of the Architect or The Owner.

PART 2 – PRODUCTS

A. PLANTING SOIL MIXTURE

1. The planting Soil Mixture shall be composed as described below. However, percentages may be adjusted by the Architect upon submission of topsoil analysis:

a. 80% bio-retention soil

b. 10% organic material

c. pH and fertilizer amendments as indicated by laboratory test of the planting soil mixture.

2. Bio-retention soil: Soil shall be natural surface soil, in a friable condition and shall contain less than 3 percent subsoil. The bio-retention soil shall be free of hardpan material, stones and clods larger than ½ inch in diameter, sticks, tree or shrub roots, debris, toxic substances such as residual herbicides, and any other material detrimental to plant growth. Bio-retention soil shall be free of plants or plant parts or undesirable plants such as but not limited to Bermuda grass, nut sedge, mugwort, Johnson grass, quack grass, Canada thistle, or other noxious weeds. The bio-retention soil shall be certified to meet the following requirements:

a. Bio-retention soil shall contain the following particle size distribution:

1). Approximate Particle Distribution

Gravel 15-25%

Course to medium sand 25-40%

Fine sand 15-25%

Very fine sand 10-20%

Silt 30-45%

Clay 10-25%

b. Soil shall have at least 2%, but not more than 5%, organic matter.

c. Soil pH shall be 5.5 to 6.5 inclusive unless otherwise specified.

Agricultural limestone at not more than 5 pounds per cubic yard of soil may be used to adjust the pH of soil provided it is well mixed in a manner which does not destroy the structure of the soil.

d. Soil salinity by electrical conductivity measurement shall not exceed 500 parts per million (ppm) as determined by Black (editor),‘Method of Soil Analysis’, Part 2, published by the American Society of Agronomy. The soil nutrient level shall be greater than 100 lbs/acre of magnesium, 150 lbs/acre of phosphorous, and 120 lbs/acre of potassium.

3. Sand shall be clean, washed, coarse, USGA rated root zone sand.

Do not remove this notice – Properly destroy or return documents when no longer needed

PLANTING SOIL 329113.19 - 3

4. Organic matter used in planting soil and back fill shall be composted bark or leaf mold, or other material approved by Architect.

a. Composted bark shall be potting grade pine bark.

b. Leaf mold shall be fully composted leaves, free of branches, twigs, bark, or other foreign material.

5. Dolomitic lime shall be agricultural grade ground limestone containing total carbonates of 85% with a minimum of 30% magnesium carbonates.

6. Iron Sulfate shall be agricultural grade formulated for use on azaleas, rhododendrons, and hollies.

7. Fertilizer:

a. Commercial Fertilizer shall be granular, packet or pellet, with 50% of the total nitrogen in a slowly available form. Fertilizer shall be a complete fertilizer with a minimum analysis of 10% nitrogen, 6% phosphorous, and 4% potassium.

b. Azalea, rhododendron, and holly fertilizer shall be a slow release fertilizer or granular fertilizer formulated specifically for use on these plants. Acceptable products include: Osmocota 10-6-4, Sierra

17-6-10, and Espoma Holly Tone.

8. Trace elements shall be commercially available slow release materials containing zinc

(Zn), molybdenum (Mo), copper (Cu), boron (B), magnesium (Mg), iron (Fe), manganese (Mn), calcium (Ca), and sulfur (S).

PART 3 - EXECUTION

A. GENERAL

1. Establish extent of planting soil installation and grading of planting soil elevation and area. Designate and identify datum elevation and project engineering reference points.

Set required lines, levels, and elevation

2. Identify and protect building waterproofing system (waterproof membrane, protection board, drainage board, and soil separator) during placement of planting soils. Do not allow planting soil to penetrate or disturb system or any component at any time during placement and installation of planting soils.

B. MIXING AND PLACEMENT OF PLANTING SOIL

1. Mixing of planting soil components shall be done off-site at a location suitable for producing a homogenous mixture free of contaminants.

2. Mixing: Mix soil components by hand or mechanical means prior to placement. Thoroughly mix to insure homogeneous structure and complete distribution of soil amendments throughout the mixture.

3. Prior to placing plant materials, place planting soil mixture in 6” to 8” layers maximum. Pass over each lift lightly with a compactor to eliminate air pockets and minimize settlement. Soil mixture shall not be so densely compacted as to restrict the free flow of water through the soil. Place soil mx +/- 2” above finished elevations to provide for ay anticipated settlement to

Do not remove this notice – Properly destroy or return documents when no longer needed

PLANTING SOIL 329113.19 - 4

the finished elevation shown.

END OF SECTION