Revised_Spec_Section_334100_(Storm_Piping)_dated_3_June_2016.pdf

PDF 35 KB Posted

Attached to
General Construction for Perimeter Security Improvements Project Federal contract opportunity
Solicitation number
GS11P16MKC7003
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

Revised Spec Storm Piping

View the file

Other files for this federal contract opportunity

Other files attached to General Construction for Perimeter Security Improvements Project, newest first.
File Type Posted
Amendment_5_to_GS11P16MKC7003.pdf PDF
Amendment_4_to_GS11P16MKC7003.pdf PDF
Site_Visit__2_Sign_In_Sheet.pdf PDF
Amendment_3_to_GS11P16MKC7003.pdf PDF
Revised_Spec_Section_321413_(Unit_Paving)_dated_3_June_2016.pdf PDF
Revised_DWG_DETAILS_L503_dated_3_June_2016.pdf PDF
GC_Past_Performance_Reference_Form.pdf PDF
Amendment_1_to_GS11P16MKC7003.pdf PDF
The_Solicitation_dated_9June16_Revised.pdf PDF
Attachment_A_-_SITE_VISIT_Info_Sheet_Revised.pdf PDF
Revised_Pricing_Sheet_dated_9_June_2016.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment_11_EnvironmentalAssessment_Jan_2012.pdf PDF
GSA527-15.pdf PDF
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
Attachment 12B_Traffic Impact Study.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment_3__Final_Drawing_Mylar_Submission.pdf PDF
Attachment_12B_Traffic_Impact_Study.pdf PDF
Pricing_Sheet.pdf PDF
Attachment_6B_C D-Waste-Monthly-Report.PerimeterSecurity_(1).xlsx XLSX spreadsheet
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment_5_Safety__and_Health_Specification_Section_01546.pdf PDF
The_Agreement_Small_Business_Set-Aside_GC_FINAL.pdf PDF
Attachment 6A_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Attachment_2_Project_Specifications_Manual_6_March_2015.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment_4_ConstructionWasteMgmt_and_Disposal_Spec.pdf PDF
Attachment_12A_Traffic_Impact_Study_Jan_2012.pdf PDF
Attachment_9_Geotechnical_Engineering_Report_3_March_2015.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
The_Solicitation_Small_Business_Set_Aside_GC_LPTA__FINAL.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment_8_USMSContractor_Security_clearance_request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 12A_Traffic Impact Study Jan 2012.pdf PDF
Attachment 11_EnvironmentalAssessment Jan 2012.pdf PDF
Attachment 8_USMSContractor Security clearance request.pdf PDF
Attachment 3_ Final Drawing Mylar Submission.pdf PDF
Attachment 5_Safety and Health Specification Section 01546.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 10_ALTA-ACSM Final Survey 06-24-15 —
Attachment 6B_C D-Waste-Monthly-Report.PerimeterSecurity —
Attachment 7_Davis Bacon Wage Rate VA160083.pdf PDF
SF1442_Form_(GS-11-P-16-MK-C-7003).pdf PDF
C301_GC_Reps_ _Certs.pdf PDF
Attachment 9_Geotechnical Engineering Report 3 March 2015.pdf PDF
Attachment 2_Project Specifications Manual 6 March 2015.pdf PDF
Show all 50

General Construction for Perimeter Security Improvements Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Albert V. Bryan U.S. Courthouse Perimeter Security Improvements June 3, 2016

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 1

AMT, LLC Final Submission

SECTION 33 4100 - STORM UTILITY DRAINAGE PIPING

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section includes storm sewer piping and related components outside the building for storm building services and storm mains, including:

1. Pipe and fittings.

2. Manholes and catch basins.

3. Cleanouts.

4. Nonpressure transition couplings.

B. All materials, installation, and quality assurance for storm lines and appurtenances installed in the public right-of-way shall be in accordance with the standards, specifications, and applicable permits of the local authorities.

1.03 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings:

1. Manholes: Include plans, elevations, sections, details, frames, and covers.

2. Catch basins and area drains: Include plans, elevations, sections, details, frames, covers, and grates.

C. Field quality-control reports.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Follow manufacturer's guidelines for storage of plastic manholes, pipe, and fittings, specifically with regard to exposure in direct sunlight.

B. Protect pipe, pipe fittings, and seals from dirt and damage.

C. Handle manholes according to manufacturer's written rigging instructions.

D. Handle catch basins and stormwater inlets according to manufacturer's written rigging instructions.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 2

1.05 PROJECT CONDITIONS

A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by GSA or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:

1. Notify GSA, owners of affected occupied facilities, and the utility provider no fewer than seven days in advance of proposed interruption of service.

2. Do not proceed with interruption of water-distribution service without written permission of those parties mentioned above.

PART 2 - PRODUCTS

2.01 PVC PIPE AND FITTINGS

A. Schedule 40 PVC Drain Pipe:

1. Schedule 40 Polyvinyl chloride (PVC) pipe shall meet requirements of ASTM D 2665.

Unless otherwise approved, 20-foot lengths of pipe shall be used wherever practicable and lengths of wye-branches shall not exceed three feet. Saddle wye-branches shall not be used. Pipe and fittings will be inspected upon delivery. Rejected pipe and fittings shall be removed by the Contractor.

2. Pipe fittings and joints shall meet requirements of ASTM D 3311. Joints shall be solvent welded with solvent cement meeting requirements of ASTM D 2564.

2.02 CONCRETE PIPE AND FITTINGS

A. Reinforced concrete pipe and fittings shall be per ASTM C76, Class IV, Wall B, Class 4000 concrete, for the diameter specified in the Contract.

B. Concrete pipe shall be furnished with bell and spigot, rubber gasket joints per ASTM C443.

Joints shall pass 13 psi hydrostatic test. The bevel or drop on bevel pipe shall not exceed the pipe wall thickness.

2.03 NONPRESSURE TRANSITION COUPLINGS

A. Comply with ASTM C 1173, elastomeric, sleeve-type, reducing or transition coupling, for joining underground nonpressure piping. Include ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end.

B. Sleeve Materials:

1. For Concrete Pipes: ASTM C 443, rubber.

2. For Cast-Iron Soil Pipes: ASTM C 564, rubber.

3. For Plastic Pipes: ASTM F 477, elastomeric seal or ASTM D 5926, PVC.

4. For Dissimilar Pipes: ASTM D 5926, PVC or other material compatible with pipe materials being joined.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 3

C. Unshielded, Flexible Couplings:

1. Description: Elastomeric sleeve with stainless-steel shear ring and corrosion-resistant-metal tension band and tightening mechanism on each end.

D. Shielded, Flexible Couplings:

1. Description: ASTM C 1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.

E. Ring-Type, Flexible Couplings:

1. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.

2.04 CLEANOUTS

A. PVC Cleanouts:

1. Description: Schedule 40 PVC body and fittings with PVC threaded plug meeting the requirements of ASTM D 2665, ASTM D 3311, and ASTM D 2564.

B. Corrugated PE Cleanouts:

1. Corrugated PE Drainage Pipe and Fittings NPS 3 to NPS 10: AASHTO M 252M, Type S, with smooth waterway for coupling joints.

2. Soiltight Couplings: AASHTO M 252M, corrugated, matching tube and fittings.

2.05 ENCASEMENT FOR PIPING

A. Standard: ASTM A 674 or AWWA C105.

B. Material: Linear low-density polyethylene film of 0.008-inch minimum thickness.

C. Form: Sheet or tube.

D. Color: Black or natural.

2.06 MANHOLES AND CATCH BASINS

A. Standard Precast Concrete Manholes and Catch Basins:

1. Description: ASTM C 478, precast, reinforced concrete, of depth indicated, with provision for sealant joints.

2. Diameter: 48 inches minimum unless otherwise indicated.

3. Ballast: Increase thickness of precast concrete sections or add concrete to base section as required to prevent flotation.

4. Base Section: 6-inch minimum thickness for floor slab and 4-inch minimum thickness for walls and base riser section, and separate base slab or base section with integral floor.

5. Riser Sections: 4-inch minimum thickness, and lengths to provide depth indicated.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 4

6. Top Section: Eccentric-cone type unless concentric-cone or flat-slab-top type is indicated, and top of cone of size that matches grade rings.

7. Joint Sealant: ASTM C 990, bitumen or butyl rubber.

8. Resilient Pipe Connectors: ASTM C 923, cast or fitted into manhole walls, for each pipe connection.

9. Steps: ASTM A 615/A 615M, deformed, 1/2-inch steel reinforcing rods encased in

ASTM D 4101, PP, wide enough to allow worker to place both feet on one step and designed to prevent lateral slippage off step. Cast or anchor steps into sidewalls at 12- to 16-inch intervals. Omit steps if total depth from floor of manhole to finished grade is less than 48 inches.

10. Adjusting Rings: Interlocking manufactured rings, designed for H-20 loading, with level or sloped edge in thickness and diameter matching manhole frame and cover, and with height as required to adjust manhole frame and cover to indicated elevation and slope.

Include sealant recommended by ring manufacturer.

11. Grade Rings: Reinforced-concrete rings, 6- to 9-inch total thickness, to match diameter of manhole frame and cover, and height as required to adjust manhole frame and cover to indicated elevation and slope.

B. Manhole Frames and Covers:

1. Description: Ferrous; 24-inch ID by 7- to 9-inch riser, with 4-inch minimum-width flange and 26-inch diameter cover. Include indented top design with lettering cast into cover, using wording equivalent to "SANITARY SEWER."

2. Material: ASTM A 48/A 48M, Class 35 gray iron unless otherwise indicated.

2.07 CONCRETE

A. General: Cast-in-place concrete according to ACI 318, ACI 350/350R, and the following:

1. Cement: ASTM C 150, Type II.

2. Fine Aggregate: ASTM C 33, sand.

3. Coarse Aggregate: ASTM C 33, crushed gravel.

4. Water: Potable.

B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water/cementitious materials ratio.

1. Reinforcing Fabric: ASTM A 185/A 185M, steel, welded wire fabric, plain.

2. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (420 MPa) deformed steel.

C. Manhole and Catch Basin Channels and Benches: Factory or field formed from concrete.

Portland cement design mix, 4000 psi minimum, with 0.45 maximum water/cementitious materials ratio. Include channels and benches in manholes.

1. Channels: Concrete invert, formed to same width as connected piping, with height of vertical sides to three-fourths of pipe diameter. Form curved channels with smooth, uniform radius and slope.

a. Invert Slope: 2 percent through manhole, 1.25% where indicated on the plans.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 5

2. Benches: Concrete, sloped to drain into channel.

a. Slope: 2” - 4”/foot.

D. Ballast and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water/cementitious materials ratio.

1. Reinforcing Fabric: ASTM A 185/A 185M, steel, welded wire fabric, plain.

2. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (420 MPa) deformed steel.

PART 3 - EXECUTION

3.01 EARTHWORK

A. Excavation, trenching, and backfilling are specified in Division 31 Section "Earth Moving."

3.02 PIPING INSTALLATION

A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical.

Where specific installation is not indicated, follow piping manufacturer's written instructions.

B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements.

C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated.

D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.

E. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking process of microtunneling.

F. Install gravity-flow, nonpressure drainage piping according to the following:

1. Install piping pitched down in direction of flow.

2. Install piping with 24-inch minimum cover.

3. Install hub-and-spigot, cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and

Fittings Handbook."

4. Install ductile-iron piping and special fittings according to AWWA C600 or AWWA M41.

5. Install PE corrugated sewer piping according to ASTM D 2321.

6. Install PVC sewer piping according to ASTM D 2321 and ASTM F 1668.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 6

7. Install reinforced-concrete sewer piping according to ASTM C 1479 and ACPA's "Concrete Pipe Installation Manual."

G. Install corrosion-protection piping encasement over the following underground metal piping according to ASTM A 674 or AWWA C105:

1. Hub-and-spigot, cast-iron soil pipe and fittings.

2. Ductile-iron pipe and fittings.

3.03 PIPE JOINT CONSTRUCTION

A. Join gravity-flow, nonpressure drainage piping according to the following:

1. Join hub-and-spigot, cast-iron soil piping with gasketed joints according to CISPI's "Cast

Iron Soil Pipe and Fittings Handbook" for compression joints.

2. Join ductile-iron culvert piping according to AWWA C600 for push-on joints.

3. Join ductile-iron piping and special fittings according to AWWA C600 or AWWA M41.

4. Join corrugated PE piping according to ASTM D 3212 for push-on joints.

5. Join reinforced-concrete sewer piping according to ACPA's "Concrete Pipe Installation

Manual" for rubber-gasketed joints.

6. Join dissimilar pipe materials with nonpressure-type flexible couplings.

3.04 CLEANOUT INSTALLATION

A. Install cleanouts and riser extensions from sewer pipes to cleanouts at grade. Use Schedule 40 PVC fittings in sewer pipes at branches for cleanouts and for riser extensions to cleanouts.

Install piping so cleanouts open in direction of flow in sewer pipe.

1. Use Medium-Duty, top-loading classification cleanouts in paved foot-traffic and unpaved areas.

2. Use Heavy-Duty (H20 loading), top-loading classification cleanouts in vehicle-traffic areas.

3. Use Extra-Heavy-Duty (H20 loading), top-loading classification cleanouts in roads.

B. Set cleanout frames and covers in earth in cast-in-place-concrete block, minimum 18” by 18” by 4” inches deep (6” in vehicle traffic areas). Set with tops flush with surrounding grade.

Recess concrete block minimum 4” below final grade and cover with topsoil.

C. Set cleanout frames and covers in concrete pavement and roads with tops flush with pavement surface.

3.05 MANHOLE AND CATCH BASINS INSTALLATION

A. General: Install manholes and Catch Basins complete with appurtenances and accessories indicated.

B. Install precast concrete manhole and catch basins sections with sealants according to

ASTM C 891.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 7

C. Form continuous concrete channels and benches between inlets and outlet.

D. Set tops of frames and covers flush with finished surface of manholes that occur in pavements.

Retain paragraph below only if specified in "Manholes" Article.

E. Install manhole-cover inserts in frame and immediately below cover.

3.06 AREA DRAIN INSTALLATION

A. Set frames and grates to elevations indicated.

3.07 CONCRETE PLACEMENT

A. Place cast-in-place concrete according to ACI 318.

3.08 CHANNEL DRAINAGE SYSTEM INSTALLATION

A. Install with top surfaces of components, except piping, flush with finished surface.

B. Assemble channel sections to form slope down toward drain outlets. Use sealants, adhesives, fasteners, and other materials recommended by system manufacturer.

C. Embed channel sections and drainage specialties in 4-inch minimum concrete around bottom and sides.

D. Fasten grates to channel sections if indicated.

E. Assemble channel sections with flanged or interlocking joints.

F. Embed channel sections in 4-inch minimum concrete around bottom and sides.

3.09 CONNECTIONS

A. Connect nonpressure, gravity-flow drainage piping in building's storm building drains specified in Division 22 Section "Facility Storm Drainage Piping."

B. Make connections to existing piping and underground manholes.

1. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe; install wye fitting into existing piping; and encase entire wye fitting, plus 6-inch overlap, with not less than 6 inches of concrete with 28-day compressive strength of 3000 psi.

2. Make branch connections from side into existing piping, NPS 4 to NPS 20. Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye with not less than 6 inches of concrete with 28-day compressive strength of 3000 psi.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 8

3. Make branch connections from side into existing piping, NPS 21 or larger, or to underground manholes and structures by cutting into existing unit and creating an opening large enough to allow 3 inches of concrete to be packed around entering connection. Cut end of connection pipe passing through pipe or structure wall to conform to shape of and be flush with inside wall unless otherwise indicated. On outside of pipe, manhole, or structure wall, encase entering connection in 6 inches of concrete for minimum length of 12 inches to provide additional support of collar from connection to undisturbed ground.

a. Use concrete that will attain a minimum 28-day compressive strength of 3000 psi unless otherwise indicated.

b. Use epoxy-bonding compound as interface between new and existing concrete and piping materials.

4. Protect existing piping, manholes, and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate.

C. Connect to sediment interceptors specified in Division 22 Section "Sanitary Waste Interceptors."

D. Pipe couplings and expansion joints with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.

1. Use nonpressure-type flexible couplings where required to join gravity-flow, nonpressure sewer piping unless otherwise indicated.

a. Flexible couplings for same or minor difference OD pipes.

b. Unshielded, increaser/reducer-pattern, flexible couplings for pipes with different OD.

c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation.

3.10 IDENTIFICATION

A. Materials and their installation are specified in Division 31 Section "Earth Moving." Arrange for installation of green warning tape directly over piping and at outside edge of underground structures.

1. Use detectable warning tape over piping and over edges of underground structures.

3.11 FIELD QUALITY CONTROL

A. Inspect interior of piping to determine whether line displacement or other damage has occurred.

Inspect after approximately 24 inches of backfill is in place, and again at completion of Project.

1. Submit separate reports for each system inspection.

2. Defects requiring correction include the following:

a. Alignment: Less than full diameter of inside of pipe is visible between structures.

b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.

c. Damage: Crushed, broken, cracked, or otherwise damaged piping.

d. Infiltration: Water leakage into piping.

Do not remove this notice – Properly destroy or return documents when no longer needed

STORM UTILITY DRAINAGE PIPING 334100 - 9

e. Exfiltration: Water leakage from or around piping.

3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.

4. Reinspect and repeat procedure until results are satisfactory.

B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.

1. Do not enclose, cover, or put into service before inspection and approval.

2. Test completed piping systems according to requirements of authorities having jurisdiction.

3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice.

4. Submit separate report for each test.

5. Gravity-Flow Storm Drainage Piping: Test according to requirements of authorities having jurisdiction, UNI-B-6, and the following:

a. Exception: Piping with soiltight joints unless required by authorities having jurisdiction.

b. Option: Test plastic piping according to ASTM F 1417.

c. Option: Test concrete piping according to ASTM C 924.

C. Leaks and loss in test pressure constitute defects that must be repaired.

D. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.

3.12 CLEANING

A. Clean interior of piping of dirt and superfluous materials. Flush with potable water.

END OF SECTION 33 4100