Form_7_-_Additional_Price_Details_template.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
CERCLA removal action at Yosemite NP, CA
Solicitation number
140P2123R0005
Issued by

About this file

This solicitation is for a non-time critical removal action at a former waste dump site in Yosemite National Park, California. The National Park Service seeks a contractor to implement a previously developed work plan to remove approximately 15,000 tons of contaminated soil and debris, transport it to approved disposal facilities, install five groundwater monitoring wells and conduct groundwater monitoring for one year, and prepare required documentation. Additional details include mobilizing and demobilizing equipment; clearing, grubbing and restoring the site; sampling waste, soil and groundwater; and reporting. Proposals are due by the date specified in the solicitation, which will be posted on SAM.gov. This is a best value procurement set aside for small businesses as defined by NAICS code 562910 with a size standard of 1,000 employees. The contract is a firm-fixed-price construction contract subject to Davis-Bacon wage rates with a magnitude estimated between $5-10 million.

View the file

Other files

File Type Posted
Sol_140P2123R0005_Amd_0005.pdf PDF
Attachment_3c_Revised_Wage_Determination_CA20230018_8-11-23_heavy_EXCERPT_0005.pdf PDF
Sol_140P2123R0005_Amd_0004.pdf PDF
Attachment_4d_Clarifications_117_-_187_140P2123R0005_0004.pdf PDF
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_3)_0003.xlsx XLSX spreadsheet
Sol_140P2123R0005_Amd_0003.pdf PDF
Attachment_4c_Clarifications_117_-_160_140P2123R0005_0003.pdf PDF
Attachment_3b_Revised_Wage_Determination_CA20230018_6-30-23_heavy_EXCERPT_0003.pdf PDF
Attachment_4b_Clarifications_70_-_116_140P2123R0005_0002.pdf PDF
Attachment_2a_El_Capitan_NTCRA_Work_Plan_(rev_Figure_9_and_updates_6-30-23)_0002.pdf PDF
Sol_140P2123R0005_Amd_0002.pdf PDF
Form_2_-_Price_Schedule_(revised_in_Amd_2)_0002.docx DOCX document
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_2)_0002.xlsx XLSX spreadsheet
Form_2_-_Price_Schedule_(revised_in_Amd_1)_0001.docx DOCX document
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_1)_0001.xlsx XLSX spreadsheet
Sol_140P2123R0005_Amd_0001.pdf PDF
Form_4_(revised)_-_Limitations_on_Subcontracting_compliance_worksheet_0001.xlsx XLSX spreadsheet
Attachment_3a_Revised_Wage_Determination_CA20230018_6-9-23_heavy_EXCERPT_0001.pdf PDF
Attachment_4a_Clarifications_1_-_69_140P2123R0005_0001.pdf PDF
Attachment_3_Wage_Determination_CA20230018_4-21-23_heavy_EXCERPT.pdf PDF
Form_3_-_FAR_representations.docx DOCX document
Form_6_-_General_References.docx DOCX document
FAQs_for_RFP_140P2123R0005.pdf PDF
Form_5_-_Relevant_Experience.docx DOCX document
Sol_140P2123R0005.pdf PDF
Yosemite_Valley_map.pdf PDF
Form_1_-_SF1442_140P2123R0005.pdf PDF
Attachment_2_El_Capitan_NTCRA_Work_Plan.pdf PDF
Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx XLSX spreadsheet
Form_2_-_Price_Schedule.docx DOCX document
Attachment_1_Statement_of_Work_-_El_Capitan_Removal_Action.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Offeror:
CLINQuantityUnitUnit PriceCLIN Price
1Contract support tasksLS$ - 0
Project meetings and conference calls, develop project schedule1LS
Site Health and Safety Plan (SHASP)1LS
Stormwater pollution prevention plan (SWPPP)1LS
PFAS work plan1LS
Pre-Design Investigation (PDI) Work Plan and PDI report1LS
Response Action Completion Reports (RACR) and Response Action Completion Report Fact Sheets1LS
Groundwater Monitored Natural Attenuation (MNA) work plan and report1LS
General contract administration and project oversight (do not include removal action site superintendent in this line)1LS
2Mobilization, clearing/grubbing, site restoration, and demobilizationLS$ - 0
Mobilization1LS
Erosion control1LS
Clearing and grubbing1LS
Temporary Site Access Road - improve for use, return to natural condition; restore trail.1LS
Dust monitoring and control1LS
Transport and place NPS-furnished soil (~9,520 cubic yards)1LS
Backfill and contour/restore site1LS
Demobilization1LS
3Excavate soil (estimated 9,520 cubic yards)15,430TN$ - 0

4 Transport and dispose of non-RCRA (California) hazardous soil (estimated quantity) 4,930 TN $ - 0

5 Transport and dispose of RCRA (California) hazardous soil (estimated quantity) 9,320 TN $ - 0

6 Transport and dispose of non-hazardous soil (estimated quantity) 1,180 TN $ - 0

7SamplingLS$ - 0
Waste characterization1LS
Confirmation sampling1LS
Groundwater sampling1LS
8Monitoring wells and groundwater monitoringLS$ - 0
Remove one existing well1LS
Install five new wells1LS
Groundwater monitoring (four quarters)1LS

TOTAL 1 - 8 $ - 0

OPTION AImport and place clean soil (ordered in full truckloads)
Purchase clean soil10CY$ - 0
Transport, place, and contour imported soil10CY$ - 0
OPTION BAdditional soil confirmation samples (each)13EA$ - 0
Quantity in this table represents one per DU and is an estimate only.
OPTION CBiobased hydraulic fluid in earth-moving equipment
[List specific equipment and associated price.]1LS
[List specific equipment and associated price.]1LS
[List specific equipment and associated price.]1LS

&"-,Bold"FORM 7: Additional Price Details for RFP #140P2123R0005 (will be the basis for post-award Schedule of Values).

Refer to Section 11 of Attachment 1, Statement of Work, for line item definitions.

Page &P

File details come from the government source that posted it. Updated .