Form_7_-_Additional_Price_Details_template_(revised_in_Amd_1)_0001.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- CERCLA removal action at Yosemite NP, CA
- Solicitation number
- 140P2123R0005
About this file
This document provides details for a federal solicitation requesting proposals for a CERCLA removal action at Yosemite National Park in California. The National Park Service seeks a contractor to implement a previously developed Non Time-Critical Removal Action work plan to remove approximately 15,000 tons of contaminated soil and debris from a former waste dump site. The selected contractor will transport the soil to appropriate disposal facilities, install five groundwater monitoring wells, perform the first year of groundwater monitoring, and prepare a Response Action Completion Report. Offerors must submit proposals by the specified due date and time. The procurement is set aside for small businesses with a NAICS code of 562910 and size standard of 1,000 employees. The contract will be a firm-fixed-price construction contract subject to prevailing wage requirements. The estimated value is between $5 million and $10 million.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Offeror: | |||||
| CLIN | Quantity | Unit | Unit Price | CLIN Price | |
| 1 | Contract support tasks | LS | $ - 0 | ||
| Project meetings and conference calls, develop project schedule | 1 | LS | |||
| Site Health and Safety Plan (SHASP) | 1 | LS | |||
| Stormwater pollution prevention plan (SWPPP) | 1 | LS | |||
| PFAS work plan | 1 | LS | |||
| Pre-Design Investigation (PDI) Work Plan and PDI report | 1 | LS | |||
| Response Action Completion Reports (RACR) and Response Action Completion Report Fact Sheets | 1 | LS | |||
| Groundwater Monitored Natural Attenuation (MNA) work plan and report | 1 | LS | |||
| General contract administration and project oversight (do not include removal action site superintendent in this line) | 1 | LS |
| 2 | Mobilization, clearing/grubbing, site restoration, and demobilization | LS | $ - 0 | |
| Mobilization | 1 | LS | ||
| Erosion control | 1 | LS | ||
| Clearing and grubbing | 1 | LS | ||
| Temporary Site Access Road - improve for use, return to natural condition; restore trail. | 1 | LS | ||
| Dust monitoring and control | 1 | LS | ||
| Transport and place NPS-furnished soil (~9,520 cubic yards) | 1 | LS | ||
| Backfill and contour/restore site | 1 | LS | ||
| Demobilization | 1 | LS | ||
| 3 | Excavate soil (estimated 9,520 bank cubic yards) | 15,430 | TN | $ - 0 |
4 Transport and dispose of non-RCRA (California) hazardous soil (estimated quantity) 4,930 TN $ - 0
5 Transport and dispose of RCRA (California) hazardous soil (estimated quantity) 9,320 TN $ - 0
6 Transport and dispose of non-hazardous soil (estimated quantity) 1,180 TN $ - 0
| 7 | Sampling | LS | $ - 0 | |
| Waste characterization | 1 | LS | ||
| Confirmation sampling | 1 | LS | ||
| Groundwater sampling | 1 | LS | ||
| 8 | Monitoring wells and groundwater monitoring | LS | $ - 0 | |
| Remove one existing well | 1 | LS | ||
| Install five new wells | 1 | LS | ||
| Groundwater monitoring (four quarters) | 1 | LS |
TOTAL 1 - 8 $ - 0
| OPTION A | Import and place clean soil (ordered in full truckloads) | |||
| Purchase clean soil | 10 | CY | $ - 0 | |
| Transport, place, and contour imported soil | 10 | CY | $ - 0 |
| OPTION B | Additional soil confirmation samples (each) | 13 | EA | $ - 0 |
| Quantity in this table represents one per DU and is an estimate only. |
| OPTION C | Biobased hydraulic fluid in earth-moving equipment | ||
| [List specific equipment and associated price.] | 1 | LS | |
| [List specific equipment and associated price.] | 1 | LS | |
| [List specific equipment and associated price.] | 1 | LS |
&"-,Bold"FORM 7: Additional Price Details for RFP #140P2123R0005 (will be the basis for post-award Schedule of Values).
Refer to Section 11 of Attachment 1, Statement of Work, for line item definitions.