This solicitation package requests proposals for a non-time critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at a former waste dump site located in Yosemite National Park, California. The contractor will implement a previously developed work plan to remove approximately 15,000 tons of contaminated soil and debris, transport it to appropriate disposal facilities, install five groundwater monitoring wells and perform the first year of monitoring, and prepare a required completion report. Proposals are due by the date and time specified in the solicitation, which will be posted on SAM.gov along with any amendments.

The procurement is set aside for small businesses and will result in a single firm-fixed price construction contract subject to prevailing wage requirements. The estimated value is between $5-10 million. A payment bond, performance bond and liability insurance will be required. The National Park Service Pacific West Region is the contracting agency. Site visits will be held on July 12, 2023 and the contractor must comply with limitations on subcontracting.

View the file

Other files

File Type Posted
Sol_140P2123R0005_Amd_0005.pdf PDF
Attachment_3c_Revised_Wage_Determination_CA20230018_8-11-23_heavy_EXCERPT_0005.pdf PDF
Sol_140P2123R0005_Amd_0004.pdf PDF
Attachment_4d_Clarifications_117_-_187_140P2123R0005_0004.pdf PDF
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_3)_0003.xlsx XLSX spreadsheet
Sol_140P2123R0005_Amd_0003.pdf PDF
Attachment_4c_Clarifications_117_-_160_140P2123R0005_0003.pdf PDF
Attachment_3b_Revised_Wage_Determination_CA20230018_6-30-23_heavy_EXCERPT_0003.pdf PDF
Attachment_4b_Clarifications_70_-_116_140P2123R0005_0002.pdf PDF
Attachment_2a_El_Capitan_NTCRA_Work_Plan_(rev_Figure_9_and_updates_6-30-23)_0002.pdf PDF
Sol_140P2123R0005_Amd_0002.pdf PDF
Form_2_-_Price_Schedule_(revised_in_Amd_2)_0002.docx DOCX document
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_2)_0002.xlsx XLSX spreadsheet
Form_2_-_Price_Schedule_(revised_in_Amd_1)_0001.docx DOCX document
Form_7_-_Additional_Price_Details_template_(revised_in_Amd_1)_0001.xlsx XLSX spreadsheet
Sol_140P2123R0005_Amd_0001.pdf PDF
Form_4_(revised)_-_Limitations_on_Subcontracting_compliance_worksheet_0001.xlsx XLSX spreadsheet
Attachment_3a_Revised_Wage_Determination_CA20230018_6-9-23_heavy_EXCERPT_0001.pdf PDF
Attachment_4a_Clarifications_1_-_69_140P2123R0005_0001.pdf PDF
Attachment_3_Wage_Determination_CA20230018_4-21-23_heavy_EXCERPT.pdf PDF
Form_7_-_Additional_Price_Details_template.xlsx XLSX spreadsheet
Form_3_-_FAR_representations.docx DOCX document
Form_6_-_General_References.docx DOCX document
FAQs_for_RFP_140P2123R0005.pdf PDF
Form_5_-_Relevant_Experience.docx DOCX document
Sol_140P2123R0005.pdf PDF
Yosemite_Valley_map.pdf PDF
Form_1_-_SF1442_140P2123R0005.pdf PDF
Attachment_2_El_Capitan_NTCRA_Work_Plan.pdf PDF
Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx XLSX spreadsheet
Attachment_1_Statement_of_Work_-_El_Capitan_Removal_Action.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Conduct NTCRA under CERCLA at El Capitan former dump site Yosemite NP FORM 2 Price Schedule.

Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for base items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of an error in the calculation of extended prices, the unit price governs. In case of an error in summation, the total of the corrected amounts governs. Round totals and extended prices to whole dollars. Complete this page and return with other documents described in Section L.

CONTRACT PRICE SCHEDULE

All work shall be performed in accordance with the attached Statement of Work, referenced documents, and wage determination. Refer to Attachment 1 for line item definitions.

*Unit-priced CLINs show an estimated quantity; see Paragraph H.8.

Contract Line Item
Quantity* and Unit
Unit Price
Price
1: Contract support tasks
1 lump sum
--
$______________
2: Mobilization, clearing/grubbing, site restoration, and demobilization
1 lump sum
--
$______________
3: Excavate soil (estimated 9,520 cubic yards)
15,430 tons
$___________
$______________
4: Transport and dispose of non-RCRA (California) hazardous soil
4,930 tons
$___________
$______________
5: Transport and dispose of RCRA (California) hazardous soil
9,320 tons
$___________
$______________
6: Transport and dispose of non-hazardous soil
1,180 tons
$___________
$______________
7: Sampling
1 lump sum
--
$______________
8: Monitoring wells and groundwater monitoring
1 lump sum
--
$______________
TOTAL PRICE FOR BASE ITEMS 1 through 8:
$______________

The Government reserves the right to unilaterally award any or no options at or after time of award. See Paragraphs H.7 and M.1 C for details.

Option A – Import and place clean soil (ordered in full truckloads). Option may be exercised multiple times.
10 cubic yards
$___________
$_____________
Option B – Additional soil confirmation samples. Quantity in this table is an estimate only. Option may be exercised multiple times in increments of one (1).
1 each
$___________
$_____________

Option C – Biobased hydraulic fluid in earth-moving equipment. Option will be per piece of equipment; combine all machines listed in Form 7 into one LS price here.

TOTAL FOR ALL ITEMS and ALL OPTIONS
$____________