Q A for Pre Solicitation FD2060-10-21507.pdf

PDF 20 KB Posted

Attached to
Loadmaster Crashworthy Seats (LCWS)
Solicitation number
FD2060-10-21507
Issued by

About this file

Questions and Answers pertaining to the pre solicitation FD2060-10-21507

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers relating to the pre-solicitation of FD2060-10-21507

Q: Requirement is to update engineering drawings (to include tie down) and manufacture group A kits?

A: The requirement is to update engineering drawings and TO’s as well as manufacturing both the Group A and Group B. The Group B portion does have a seat that is COTS but part of the Group B must be manufactured (IAW Drawings).

Q: The potential contractor shall be supplied with a LCWS group B kit to be installed as one of the post kit proof production kits - -supplied as GFE to all potential contractors?

A: The LCWS Group B kit will be supplied only to the contractor that wins the bid.

Q: Will the TO’s be available for evaluation before bid is due – this helps in evaluating TMCR requirement.

A: Yes, Mod specific TO’s will be made available to potential contractors.

Q: Have any aircraft been previously updated?

A: Yes.

Q: Is travel to site survey involved?

A: Travel to site survey is involved Post Contract award, not during proposal phase.

Q: Is the above solicitation to manufacture Group A Kits, and not the LCWS seats, is that correct?

A: The solicitation is to manufacture both the Group A and Group B kits (the Group B is a “seat assembly” that includes a seat that is COTS and manufactured seat attachments.)

File details come from the government source that posted it. Updated .