Q A for Pre Solicitation FD2060-10-21507.pdf
PDF 20 KB Posted
- Attached to
- Loadmaster Crashworthy Seats (LCWS)
- Solicitation number
- FD2060-10-21507
About this file
Questions and Answers pertaining to the pre solicitation FD2060-10-21507
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answers relating to the pre-solicitation of FD2060-10-21507
Q: Requirement is to update engineering drawings (to include tie down) and manufacture group A kits?
A: The requirement is to update engineering drawings and TO’s as well as manufacturing both the Group A and Group B. The Group B portion does have a seat that is COTS but part of the Group B must be manufactured (IAW Drawings).
Q: The potential contractor shall be supplied with a LCWS group B kit to be installed as one of the post kit proof production kits - -supplied as GFE to all potential contractors?
A: The LCWS Group B kit will be supplied only to the contractor that wins the bid.
Q: Will the TO’s be available for evaluation before bid is due – this helps in evaluating TMCR requirement.
A: Yes, Mod specific TO’s will be made available to potential contractors.
Q: Have any aircraft been previously updated?
A: Yes.
Q: Is travel to site survey involved?
A: Travel to site survey is involved Post Contract award, not during proposal phase.
Q: Is the above solicitation to manufacture Group A Kits, and not the LCWS seats, is that correct?
A: The solicitation is to manufacture both the Group A and Group B kits (the Group B is a “seat assembly” that includes a seat that is COTS and manufactured seat attachments.)
File details come from the government source that posted it. Updated .