PROS_V_Draft_RFP_CDRL_Package_-_Exhibit_A.pdf

PDF 610 KB Posted

Attached to
Parts and Repair Ordering System (PROS) Federal contract opportunity
Solicitation number
FA8630-14-R-5030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Section J - CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Parts and Repair Ordering System (PROS), newest first.
File Type Posted
Q_and_A_23_July_15.pdf PDF
Amend_0006.pdf PDF
Questions_and_Responses_-_16_Jul_15.docx DOCX document
Section_J_Exhibit_A_-_CDRLs.pdf PDF
Section_J _Attachment_5_Pricing_Matrix_2_July_2015.xlsx XLSX spreadsheet
Amend_0005.pdf PDF
Section_J_Attachment_1_-_PWS_Amendment_5.pdf PDF
Section_J_Attachment_10-Final_Certification_Statement.pdf PDF
Section_J_Attachment_1_-_PWS_Amendment_5.pdf PDF
Questions_and_Responses_-_12_June_15.docx DOCX document
Final_Certification_Statement.docx DOCX document
Copy_of_Section_L_Attachment_2_-_Scenario_Matrix_v5.xlsx XLSX spreadsheet
Section_M_5_June_2015.pdf PDF
Section_J_Attachment_1_-_PWS_5_June_2015.pdf PDF
Questions_and_Responses_Amendment_0002.docx DOCX document
Section_M_-_Eval_Factors.pdf PDF
Section_L_Attachment_6_-_Client_Authorization_Letter.pdf PDF
Section_J _Attachment_4_-_SDR_Process.pdf PDF
Section_J_Attachment_2_-_DD254.pdf PDF
Section_L_Attachment_4_-_Past_Performance_Questionnaire.pdf PDF
Section_J _Attachment_7_-_Wage_Rate_Determination.pdf PDF
Section_L_Attachment_2_-_Scenario_Matrix_v3.xlsx XLSX spreadsheet
Exhibit_A_-_CDRLs.pdf PDF
Section_L_Attachment_3_-_Past_Performance_Information_Tool_Instructions.pdf PDF
Section_J_Attachment_2A_-DD254_Continuation_Sheet.pdf PDF
Section_J _Attachment_1_-_PWS.pdf PDF
Section_J _Attachment_5_-_Pricing_Matrix_v5.xlsx XLSX spreadsheet
Section_L_Attachment_5_-_Subcontractor_or_Teaming_Partner_Consent_Letter.pdf PDF
Section_J _Attachment_6_-_Specs_and_Standards.pdf PDF
Section_L_Attachment_2_-_Scenario_Matrix_v2.xlsx XLSX spreadsheet
Final_RFP_Q_and_A_050515.pdf PDF
PROS_V_Pre-Proposal_Conf_Deck_Final.pdf PDF
PROS_V_Pre-Proposal_Conf_Attendees_041515_R1.docx DOCX document
042715_PROS_V_Addl_Q_and_A.xlsx XLSX spreadsheet
042215_PROS_V_Pre-Proposal_Conf_Q_and_A.xlsx XLSX spreadsheet
PROS_V_Pre-Proposal_Conference_041515_Attendee_List.pdf PDF
PROS_V_Pre-Proposal_Conf_Deck_041515_-_for_FBO.pdf PDF
PROS_V_Pre-proposal_conference_notice.docx DOCX document
Presolicitation_Notice-PROS_V.docx DOCX document
Section_L_Attachment_4_-_Past_Performance_Questionnaire_Draft.pdf PDF
H001_Objective_Performance_Incentive_(OPI)_(January_2015).pdf PDF
Section_L_Attachment_5_-_Subcontractor_or_Teaming_Partner_Consent_Letter_Draft.pdf PDF
Section_M_Draft.pdf PDF
Section_L_Attachment_2_-_Scenario_Matrix_Draft.xlsx XLSX spreadsheet
Section_L_Attachment_6_-_Client_Authorization_Letter_Draft.pdf PDF
Section_L_Draft.pdf PDF
Section_L_Attachment_7_-_Electronic_Format_Instructions_Draft.pdf PDF
Section_J _Attachment_1_PWS_Draft.pdf PDF
Final_Combined_PROS_V_Industry_Day_Brief _v._1.pptx PPTX presentation
PROS_V_Industry_Day_Notes.docx DOCX document
Show all 50

Parts and Repair Ordering System (PROS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

FA8630-16-D-5030

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE O F DATA ITEM 3. SUBTITLE

SMALL BUSINESS SUBCONTRACTING

PLAN

A001

SMALL BUSINESS SUBCONTRACTOR REPORT

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFLCMC/WFALC

DI-MGMT-81642 PWS 2.2

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission

14. DISTRIBUTION

NO SEMIA 30 DAC

a. ADDRESSEE

b. COPIES

8.APP CODE

N/A

D 11. AS OF DATE

Blk 16

13.Date of Subsequent Subm.

SEMIA

Final Draft Reg Repro

16. REMARKS: AFLCMC/WFALC 1

Blk 4: This DID is tailored as follows:

Use/Relationship is changed to read: The Small Business Subcontracting Plan will be used to ensure compliance with Public Laws 95-507, 99-661, 100-180, and 100-656, along with the Federal Acquisition Regulation (FAR) and other acts or regulations that relate to subcontracting with small businesses.

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format.

For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blk 11: Submit 30 Days After Contract (DAC) start and annually thereafter.

Blk 14: Electronic media required via email.

AFLCMC/WFGC 1

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DAVID R BANKS

PROS QUALITY PROGRAM MGR

5 JAN 2015

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 page

17. PRICE

GROUP

18.ESTIMATED

TOTAL PRICE

DRAFT

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Data Accession List (DAL)

A002

DATA ACCESSION LIST (DAL)

DI-MGMT-81453/A

PWS 2.3.1.1

14. DISTRIBUTION

NO ASREQ TBD

A

D 11. AS OF DATE

TBD

13.Date of Subsequent Subm.

ASREQ

Final Draft Reg Repro

16. REMARKS: AFLCMC/WFALC 1 1

Blk 4: This DID is tailored as follows:

Use/Relationship: The purpose of the Data Accession List (DAL) is to provide a medium for identifying contractor internal data which has been generated by the contractor in compliance with the work effort described in the PWS. The DAL is an index of the generated data that is made available upon request.

3. Content. The DAL shall specify internally generated data including but not limited to vendor list and entire procurement history. The format and content of the data listed on the DAL shall be as prepared by the contractor to document compliance with the PWS requirements. The DAL shall include a vendor list which shall contain the following fields at a minimum: Company Name, CAGE code/DUNS, Company Address, Company Phone Number, and Point of Contact name.

4. DISTRIBUTION STATEMENT D

Blk 8: The DAL shall be submitted no later than 90 calendar days before end of ordering period and no later than 60 calendar days before end of closeout period.

Contractor shall provide DAL to Government for review. Government will respond with consolidated comments within 14 days after receipt. If disapproved, the contractor shall correct and resubmit within 14 days after notification of comments.

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format.

For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blk 14: Electronic media required via email in a format readable by Microsoft Excel.

AFLCMC/WFGC 1 1

15. TOTAL 2 2 0

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 page

GROUP

NSP

18.ESTIMATED

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Task Order - Study/Analysis Report A003 TECHNICAL REPORT - STUDY/SERVICES

DI-MISC-80508B PWS 3.5

14. DISTRIBUTION

NO As Required See Blk 16

A

D 11. AS OF DATE

See Blk 16

13.Date of Subsequent Subm.

As Required

Final Draft Reg Repro

16. REMARKS: AFLCMC/WFALC 1 1

Blk 4: This DID is tailored as follows:

Contractor format is acceptable.

Blk 8: Contractor shall report findings of studies/analysis to Government for review within 14 days after completion of task order. Government will respond with consolidated comments within 14 days after receipt. If disapproved, the contractor shall correct and resubmit within 14 days after notification of comments.

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format.

For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blks 11,12 &13: The contractor shall submit draft report as required by Task Order.

Reports and dates of submission shall be specified in individual delivery orders from the Government Contracting Officer.

DAVID R BANKS

5 JAN 15

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 3

GROUP

NSP

18.ESTIMATED

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

16. REMARKS (Continued):

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 2 of 3

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP -Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc. Item D. Enter name of system/item being acquired that data will support. Item E.

Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item I.

Signature of CDRL approval authority. Item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition -Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition -Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition -Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price -Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 3 of 3

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Task Order - Completion Report A004 Contract Summary Report

DI-ADMN-80447A PWS 3.5

14. DISTRIBUTION

NO As Required See Blk 16

A

D 11. AS OF DATE

See Blk 16

13.Date of Subsequent Subm.

As Required

Final Draft Reg Repro

16. REMARKS: AFLCMC/WFALC 1 1

Blk 4: This DID is tailored as follows:

Use/relationship:

This report summaries all work performed under the Task Order.

2.2.3 Task Order Number.

Blk 8: Contractor shall report findings of studies/analysis to Government for review within 14 days after completion of task order. Government will respond with consolidated comments within 14 days after receipt. If disapproved, the contractor shall correct and resubmit within 14 days after notification of comments.

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format. For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blks 11,12 &13: The contractor shall submit draft report as required by Task Order. Reports and dates of submission shall be specified in individual delivery orders from the Government Contracting Officer.

JAN 2014

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP -Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc. Item D. Enter name of system/item being acquired that data will support. Item E.

Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item I.

Signature of CDRL approval authority. Item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible listed on the DD Form 1423.

a. Group I. Definition -Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition -Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition -Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price -Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Task Order - Monthly Status Summary Report

A005 Contractor’s Progress, Status and Management Report

DI-MGMT-80227 PWS 3.5

14. DISTRIBUTION

NO Monthly 30 DAC

N/A

D 11. AS OF DATE

See Blk 16

13.Date of Subsequent Subm.

Monthly

Final

16. REMARKS: AFLCMC/WFALC 1

3.1: Delete “reports costs,”

10.2 Format – This report shall be in contractor’s format in Microsoft Excel.

10.3 a, g, h, i, j, k deleted

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format.

For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blk 11: 30 days after completion of last open task order.

Blk 12: First submission shall be 30 Days After Contract start and every 30 days thereafter.

DAVID R BANKS

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP -Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc. Item D. Enter name of system/item being acquired that data will support. Item E.

Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item I.

Signature of CDRL approval authority. Item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible listed on the DD Form 1423.

a. Group I. Definition -Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition -Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition -Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price -Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

QUALITY ASSURANCE PLAN A006 QUALITY ASSURANCE PROGRAM PLAN

DI-QCIC-81794 PWS 4.1.3

14. DISTRIBUTION

PWS 4.1.4 Annual 30 DACA

A

D 11. AS OF DATE

See Blk 16

13.Date of Subsequent Subm.

See Blk 16

Final

All instances of "QAPP" are changed to "QAP"

The following paragraphs are changed to read:

Use/Relationship: The purpose of the Quality Assurance Plan (QAP) is to provide complete coverage of all of the information, instructions and documentation necessary to provide quality parts, repairs, studies/analysis, and technical services of high acceptance by FMS customers and in complete conformity with contractual requirements. The QAP will contain measurable quality objectives and the metrics by which they are to be measured. The QAP will describe how the Contractor administers its quality assurance performance processes to include policy and training of personnel.

3.2 Management: Provides the organizational structure, and their responsibilities that will influence the quality of the products and services. Examples of elements to be addressed include quality planning, implementation, control and monitoring; internal discrepancy/deficiency investigations and reporting processes; how functional areas contribute to quality; significant interfaces that affect products and services; vendor rating system; vendor contracts, standard terms and conditions applied to vendors; how vendor surveillance and audits are conducted; review of audit results; problem reporting and resolution; supplier/vendor corrective and preventive action process; first article validation/inspection and testing procedures; quality records and data management; analysis and continuous process improvement; conformance with FAR and supplements; communication and customer relations; authorization for deviation to quality policy and control of corrective and preventive actions.

3.4 Vendors: Provides details of how all relevant quality assurance requirements will be applied to vendors. Depicts the method used to evaluate, select and control vendors.

3.5 Control of Customer Supplied Products: Provide specifics on how customer supplied products or maintenance items are identified and controlled.

3.7 Inspection and Testing: Delineates process to require inspection and testing reports from vendors; describes use of third party verification in the event of a dispute between contractor and vendor.

Continued next page

DAVID R BANKS

5 JAN 2014

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

3.9 Handling, Storage, Marking, Packaging, Preservation and Delivery: describe the methodology used to verify that handling, storage, marking, packaging, accuracy of shipping documentation, and delivery requirements are met. Includes the method used to verify that the delivered products have not degraded beyond the requirements.

3.13 Quality Audits: Identifies the nature and extent of the quality audits to be performed internally, on vendors, regulatory and ISO registration; how the results will be used in the corrective and preventive action system, and to what extent the customer and USG influences the internal quality audits.

Blk 7: See PWS 4.1.4 Certificate of Conformity (CoC)

Blk 8: The Government will review, approve and/or disapprove with consolidated comments within 30 days after receipt. If disapproved, the contractor shall correct and resubmit within 30 days after notification of comments.

Blk 9: Unless otherwise authorized by contract or agreement, further distribution of information subject to the restrictions identified in this Contract by non-Government entities or individuals is strictly prohibited. The distribution statement shall be displayed conspicuously on all technical documents regardless of media or format. For standard written or printed material, the distribution statement shall appear on the front cover, title page, and Standard Form (SF) 298, “Report Documentation Page,” where applicable.

Blk 11: Last submission 1 year before end of ordering period.

Blk 12 & 13: First submission 30 Days After Contract Award (DAC) start and annually thereafter.

Blk 14: Hard copy or electronic media is acceptable.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP -Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc. Item D. Enter name of system/item being acquired that data will support. Item E.

Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item I.

Signature of CDRL approval authority. Item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible listed on the DD Form 1423.

a. Group I. Definition -Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition -Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition -Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price -Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

0007, 1007, 2007, 3007, 4007, 5007, 6007

B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

SECURITY MANAGEMENT PLAN A007 OPERATIONS SECURITY (OPSEC) PLAN

DI-MGMT-80934C PWS 4.4

14. DISTRIBUTION

NO Annual 30 DAC

A

D 11. AS OF DATE

See Blk 16

13.Date of Subsequent Subm.

Annual

Final Draft Reg Repro

16. REMARKS: AFLCMC/WFALC 1

4: This DID is tailored as follows:

Contractor format acceptable.

Use/Relationship, b. The PROS Contracting Officer has determined that the sensitivity of the PROS program warrants OPSEC protections.

Requirements, 1.b. Contractor shall comply with appropriate USG regulations and directives contained in the latest version of DODM 5205.02M, DOD Operations Security (OPSEC) Program Manual.

Requirements, 1.e. Contractor shall comply with appropriate USG regulations and directives contained in the latest version of DOD 5220.22M, National Industrial Security Program Operating Manual (NISPOM).

Blk 8: Contractor shall provide draft plan to USG within 30 Days After Contract (DAC) start. The Government will review, approve and/or disapprove with consolidated comments within 30 days after receipt. If disapproved, the contractor shall correct and resubmit within 30 days after notification of comments.

Blk 11: Last submission 1 year before end of POP.

Blk 14: Electronic via email preferred; hard copy acceptable.

DAVID R BANKS

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM

PROS V

E. CONTRACT/PR NO.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP -Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc. Item D. Enter name of system/item being acquired that data will support. Item E.

Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL. Item H. Date CDRL was prepared. Item I.

Signature of CDRL approval authority. Item J. Date CDRL was approved. Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24). Item 10. Specify number of times data items are to be delivered. Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible listed on the DD Form 1423.

a. Group I. Definition -Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition -Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition -Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price -Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .