About this file
KDAM ATARS Industry Day Briefing Charts
View the file
Other files for this federal contract opportunity
Show all 50
KDAM ATARS has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFLCMC… Providing the Warfighter’s Edge
KDAM ATARS
Industry Day/
Pre-Solicitation Conference 28-29 Apr 15
Mrs. Christine Haupt
AFLCMC/WNSS
DSN: 785-5062
christine.haupt@us.af.mil mailto:christine.haupt@wpafb.af.mil
Introduction
• Information presented today is provided for discussion purposes only and does not represent AFLCMC’s final approved position
• No part of Industry Day will be considered during source selection
• Your involvement in Industry Day is strictly voluntary;
no costs shall be charged to the government
• Prompt feedback on the draft Request for Proposal (RFP) is strongly encouraged and welcomed
Communication Is Our Primary Objective
Administrative
• Restrooms
• Emergency
– Dial 911
– Exits/Evacuation
Rules of Engagement
• Contractors will receive impartial, fair, equitable treatment – information provided to one will be provided to all
• Please hold questions for Q&A session at the end or during one-on-one sessions
– If your question and the answer does not relate to any competition-sensitive or proprietary material, the Q&A may be provided to all other contractors
• Industry Day questions must be directed to Mr. Jon Snyder (jon.snyder@us.af.mil) mailto:jon.snyder@us.af.mil
Rules of Engagement One-On-One Sessions
• Location: Bldg 1222, 2nd Floor Conf Rm
• Dates/Time: 28-29 Apr, pre-scheduled 40 minute time blocks
• Waiting Area: Bldg 1222, 1st Floor Multi-Purpose Room
• Please be ready 15 minutes before your scheduled session
• Ground Rules:
– Government will only accept business cards (no marketing info)
– Duration of one-on-one meetings limited to 40 minutes
Objectives
• Provide information to industry on KDAM ATARS
– Schedule
– What it is…
– What it is NOT…
– KDAM ATARS vs. ATARS II
– UH-1N HTAWS/TCAD Modification
– Incentive Options
– What changed from DRAFT RFP
• Obtain feedback from industry on draft RFP
• Answer industry questions
Schedule
• 7 Apr 15, Draft RFP Released
• 28-29 Apr 15, Industry Day/Pre-Solicitation Conference
• 15 Jun 15, Final RFP Release
• 16 Jul 15, Receipt of Past Performance Proposal Volumes
• 14 Aug 15, Receipt of Technical & Cost Proposal Volumes
• Late-Apr 16, Contract Award
• 1 Jul-30 Sep 16, 90-Day Transition
What It Is…
• Requirement to train airmen for Special Ops/Combat Rescue Operations by providing…
– Aircrew Instruction – initial qualification, refresher, and currency
– Cybersecurity – security for all aspects of simulators to include ATOs
– Student Services – registrar, scheduling, publications
– Contractor Logistics Support (CLS) – operational mx, supply chain mgmt, & eng spt
– Training Services Support Center (TSSC) – DRs, DCRs, and minor mods
– Concurrency Modifications – Ensure concurrency with weapon system & avoid obsolescence
– Courseware – development and maintenance of course materials
– Database Generation System (DBGS) – unclassified training databases
– Distributed Mission Operations (DMO) –connect to DMO network
– Commercial Training – non-standard aircraft training
– Handling of classified media at the Secret level; up to Top Secret at Andrews
• For…AETC, ACC, and AFGSC (AFSOC & USSOCOM indirectly)
• In Support of…
– Fixed Wing: HC/MC-130J, HC-130P
– Rotary Wing: CV-22, UH-1N, HH-60G
• At…Kirtland AFB, Davis-Monthan AFB, Joint Base Andrews, Moody AFB
• Utilizing…50+ devices; Weapon System Trainers (WSTs) to Desktop Trainers
What It Is NOT…
• AFSOC and USSOCOM ATARS requirements at Hurlburt Field, Cannon AFB, Harrisburg ANGB, Kadena AFB, and Mildenhall AFB will remain on ATARS II until 30 Sep 17; AFSOC ATARS follow-on planning will begin Sep 15
• CV-22 and J-variant concurrency mods
• CV-22 and J-variant TSSC
• CV-22 CLS
• Mission rehearsal
vs. ATARS II
• Similar scope; reductions in magnitude
– Reduction of MDSs
– Reduction in locations
– Reduction of DMO and CLS requirements
– Elimination of mission rehearsal
• Customer base minimized; AETC, ACC, and AFGSC primary KDAM customers
• Acquisition approach simplified
– Performance based requirements
– Firm Fixed Price
– Restructured pricing; CLS and Student Services by site; not MDS
– Changed instructor requirements; no longer has a requirement for instructors to perform ancillary tasks
– One concurrency modification included in RFP
UH-1N HTAWS/TCAD
Concurrency Modification
• Actual modification (not hypothetical)
• Required to maintain concurrency with UH-1N weapon system avionics
– Helicopter Terrain Awareness Warning System (HTAWS)
– Traffic Collision Avoidance Device (TCAD)
• Modification required for 2 devices at Kirtland
– UH-1N Weapon System Trainer (WST)
– UH-1N Operation Flight Trainer (OFT)
• Simulate; not stimulate
– Includes functionality, performance, latencies, instrumentation, information content, displays, fidelity, and procedures resident in the UH-1N
Incentive Option
• Contractor earns years
vs. loses years, since we are funded with annual appropriations
• Contractor earns a single evaluation rating for each identified performance criteria during each of the evaluation periods
• Each Evaluation Criteria has a point value, contractor must earn a minimum number of points to become eligible for the option
– Evaluation Periods 1 and 2 combined determines eligibility for option period 4
– Evaluation Period 3 determines eligibility for option period 5
– Evaluation Period 4 determines eligibility for option period 6
– Evaluation Period 5 determines eligibility for option period 7
• FAR 17.207 still applies
What Changed from DRAFT RFP
• Removed all MC-130H requirements
• Adjusted DMO banded hours
• Added OPFOR CLIN with bands
• Updated Asset List
• Updated Technical Subfactors to require related experience
• Minor clarifications/changes to PWS, maintenance/software agreements, CDRLs, removal of CV-22 GFP (except for classroom training aids)
• BSAs and CBAs in work
• PFT data will be provided in bidder’s library
Final Thoughts
• We are partners and want you to help us make this effort as effective as possible
– Communication is essential – looking for your feedback
– Email Mr. Jon Snyder, jon.snyder.2@us.af.mil
Please Provide Feedback mailto:jon.snyder@us.af.mil
Questions???
| KDAM ATARS�Industry Day/ �Pre-Solicitation Conference�28-29 Apr 15 |
| Introduction |
| Administrative |
| Rules of Engagement |
| Rules of Engagement�One-On-One Sessions |
| Objectives |
| Schedule |
| KDAM ATARS�What It Is… |
| KDAM ATARS�What It Is NOT… |
| KDAM ATARS�vs. ATARS II |
| UH-1N HTAWS/TCAD�Concurrency Modification |
| Incentive Option |
| What Changed from DRAFT RFP |
| Final Thoughts |
| Questions??? |
File details come from the government source that posted it. Updated .