About this file

Vendor Questions Government Response 4-6 (Draft RFP)

View the file

Other files for this federal contract opportunity

Other files attached to MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
Question_ _Response__83_-_85.pdf PDF
Seed_Proj_071930 _Addendum_002 _24_Jul_14.pdf PDF
Seed_Project_071930 _Addendum_002 _Attachment_4 2 .pdf PDF
NOTICE_TO_OFFERORS__2.pdf PDF
Atch_7 _Pricing_Worksheets_(v2)_Jul_14.xlsx XLSX spreadsheet
Atch_5 _Wage_Decision_OH140016_Mod_16 _18_July_14.pdf PDF
Atch_14 _Sample_Proj_-_Addendum_0002.pdf PDF
Question_ _Response__60_-_61.pdf PDF
Atch_10 _Seed_Project_-_Addendum_0001.pdf PDF
Atch_11 _Seed_Project_-_Addendum_001 _Atch_3.pdf PDF
Atch_13 _Sample_Project_-_Addendum_001.pdf PDF
FA8601-14-R-0007-0001.pdf PDF
Atch_12 _20255_02.dwg DWG drawing
Atch_5 _DBA_Wage_Decision_OH140016 _Modification_15_4_July_14.pdf PDF
Atch_12 _20255_01.dwg DWG drawing
2nd_Site_Visit_Posting.pdf PDF
30_June_2014_Site_Visit_Information.pdf PDF
Site_Visit_Sign-In_Sheet_-_30_June_2014.pdf PDF
Rules_of_Engagement.pdf PDF
Atch_1 _Appendix_D_Tobacco_Use_Policy.pdf PDF
Atch_9 _Sample_Proj_Drawings_-_9_Mar_11.pdf PDF
Atch_1 _MAC_SOW_-_Revised_21_Feb_14.pdf PDF
Atch_2_(Atch_1 _App_A)_WPAFB_BFS_and_Appendicies_Mar_2014.pdf PDF
FA8601-14-R-0007_-_18_June_2014.pdf PDF
Atch_7 _Pricing_Worksheets.xlsx XLSX spreadsheet
Atch_5 _-_DBA_Wage_Decision _OH14016_13_June_2014.pdf PDF
Atch_1 _Appendix_F_Activity_Hazard_Analysis.pdf PDF
Atch_1 _Appendix_I_AF_Sustainable_Design_and_Development_Guide.pdf PDF
Atch_1 _Appendix_G_AF_Form_3000_Material_Submittal.pdf PDF
Atch_1 _Appendix_J_AF_3064_Construction_Progress_Schedule.pdf PDF
Questions_ _Responses__7-8.pdf PDF
Atch_1 _Appendix_J_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_5 _-_DBA_Wage_Decision _OH14016_2_May_14_-_Notepad.pdf PDF
Info_for_Industry_-_Draft__2.docx DOCX document
Atch_1 _Appendix_E_2008-EM-385-1-1_Safety_and_Health_Manual.pdf PDF
Atch_3 _(Atch_1 _App_C)_WPAFB_Master_Specs_-_6_May_14.pdf PDF
Atch_6 _Section_L _PZIOC_L-004_Atch_1_Solicitation-Cross_Ref_Matrix.docx DOCX document
Atch_9 _Sample_Proj_Drawings_-_9_Mar_11.pdf PDF
Atch_7 _Pricing_Worksheets.xlsx XLSX spreadsheet
Atch_2_(Atch_1 _App_A)_WPAFB_BFS_and_Appendicies_Mar_2014.pdf PDF
DRAFT__2_-_FA8601-14-R-0007.pdf PDF
Atch_1 _Appendix_K_AF_Form_103_Dig_Permit.pdf PDF
Atch_4 _Seed_Project_SOW_-_10_Oct_13.pdf PDF
Atch_1 _Appendix_B_AF_Form_3065_Contract_Progress_Report.pdf PDF
Atch_1 _Appendix_D_Tobacco_Use_Policy.pdf PDF
Delay_in_Issuance_of_MACC_RFP_-_13_Dec_13.pdf PDF
Info_for_Industry_-_6_Nov_13.pdf PDF
Atch_2 _Base_Facility_Standard _WPAFB_-_May_2013.pdf PDF
Atch_4 _Seed_Project_071930.pdf PDF
DRAFT_FA8601-14-R-0007.pdf PDF
Show all 50

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR QUESTIONS/GOVERNMENT RESPONSES

DRAFT

REQUEST FOR PROPOSAL (RFP)

FA8601-14-R-0007

Multiple Award Construction Contract (MACC)

2 December 2013

QUESTION #4

Page 40 of 74 - 252.219-7009 SECTION 8(A) DIRECT AWARD (SEP 2007) states, (a) This contract is issued as a direct award between the contracting office and the 8(a) Contractor pursuant to the Partnership Agreement between the Small business Administration (SBA) and the Department of Defense.

The average 8(a) contractor contract/program manager does not hold a bachelor’s degree in civil or structural engineering, or architecture. These are positions normally found in engineering firms or with large business contractors. If we were to subcontract out the management duties of our projects, we would be in direct violation of SBA rules regarding 8(a) companies serving as pass-through organizations for large businesses. If we were to go out and hire for these positions this would add a substantial cost burden, and in turn would impact our costs to perform the required services. We are requesting that the Government reconsider the degree requirements for the contract manager, quality control manager, and site safety and health officer in order that we may provide our qualified personnel to perform these duties as they have on many of our previous DoD and commercial projects.

Government Response: Due to the complexity and size of the potential task orders, the education requirements listed in the MACC statement of Work (SOW) needs to remain. During the development of the MACC SOW, the Government looked at a number of other small business Air Force MACC contracts around the country and they contained similar requirements. Likewise the Wright-Patterson Simplified Acquisition of Base Engineering Requirements (SABER) contract had the same language for the Contract Manager that was used for the MACC.

QUESTION #5

Page 59 of 74 – 2. GENERAL INSTRUCTIONS (para. 4) states, “The proposal acceptance period is specified on SF 1442, block 13, para. D. The offer shall make a clear statement on block 17 of the SF 1442 that the proposal is valid until this date.” The SF 1442, block 13, para. D states, “Offers providing less than 200 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.”

Is it the government’s intent to allow an adjustment of pricing upon award of the seed project? This is an exceptionally long period to hold pricing, as most vendor prices are on average only good for 60-120 days at most.

Government Response:

- The specified acceptance period is based on the estimated award date. We fully intend to utilize any efficiencies that would foster an expedited award.

- The most current Wage Determination shall be included with the seed task award. The awardee has the right to utilize the procedures in DFARS 252.243-7002 Requests for Equitable Adjustment if they believe a price adjustment is warranted as a result.

QUESTION #6

Although not listed in Table 1 – Proposal Organization (Page 61 of 74), there is a Volume IV – Contract Documentation requirement on Page 65 of 74 (Sec. 5.3). Does the Government want Sections A through K submitted in their entirety, or should we be submitting Section A, Section B, Section I and Section K only?

Government Response: The information cited in Table 1 is correct. The reference to Volume IV – Contract Documentation is being removed. The required Contract Documentation information should be included in Volume III as stated in Table 1. This will be corrected prior to release of the actual RFP. Offerors should submit Sections A through K in their entirety. (Reference Page 65, Para 5.3.1, Model Contract/Representation and Certifications…”The offeror’s proposal shall include a signed copy of the Model Contract, and Sections A through K. This includes all amendments thereof.”)

File details come from the government source that posted it. Updated .