About this file

Question and answer dated 22 Dec 11

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis, newest first.
File Type Posted
Drawing 3202300 Sheets 24 25.pdf PDF
FA853311R31160______0004.pdf PDF
PD10WRGBGBEA34_Rev_E.doc DOC document
PD10WRGBGBEA34_Rev_D.pdf PDF
FA853311R31160______0003.pdf PDF
QA 6 Jan 12.doc DOC document
LCU_fitting_info.pdf PDF
QA 16 Dec 11.doc DOC document
FA853311R31160______0002.pdf PDF
Attachment_6_Quantity_Ranges.doc DOC document
PD_Rev_C.pdf PDF
9579777_98752.pdf PDF
9579776_98752.pdf PDF
QA RFP.doc DOC document
Wrapper Common SRS 20110405.pdf PDF
FA853311R31160______0001.pdf PDF
VDATS_Wrapper_Style_Guide.pdf PDF
FA853311R31160_C003_Computer_Software_Flowchart.pdf PDF
FA853311R31160.RTF RTF text file
FA853311R31160_Appendix_B_13Oct11_7pages.doc DOC document
FA853311R31160_B002_Integrated_Master_Schedule.pdf PDF
FA853311R31160_DD_Form_254.pdf PDF
FA853311R31160_A003_Technical_Report-Study_Services.pdf PDF
FA853311R31160_A006_Training_Materials.pdf PDF
FA853311R31160_A002_Test_Inspection_Report.pdf PDF
FA853311R31160_Attachment_3_Transmittal_Letter.doc DOC document
FA853311R31160_B006_Request_for_Deviation.pdf PDF
FA853311R31160_B003_Conference_Agenda.pdf PDF
FA853311R31160_E001_LMI_Data_Products.pdf PDF
FA853311R31160_D001_TMCR.pdf PDF
FA853311R31160_B-1-Weapon-System-Program-Security-Classification-Guide_Section-IX.pdf PDF
FA853311R31160_ARTSSOW.docx DOCX document
FA853311R31160_Attachment_1_FACTS_Sheet.pdf PDF
FA853311R31160_AFMC158.pdf PDF
FA853311R31160_Attachment_6_Quantity_Ranges.doc DOC document
FA853311R31160_Attachment_4_Client_Authorization_Ltr.doc DOC document
FA853311R31160_C009_ACPIN.pdf PDF
FA853311R31160_A001_Test_Plan.pdf PDF
Questions and Answers_14 Nov 2011.doc DOC document
B-1 Weapon System Program Security Classification Guide Section IX.pdf PDF
DD Form 254.pdf PDF
Q A and Reminder--DRFP.doc DOC document
Information--DRFP.doc DOC document
NA-84-1110H B-1B ATLAS and Protocol Programming Manual Vol I.pdf PDF
Q A DRFP.doc DOC document
ARTS SOW_30 Mar 11.pdf PDF
ARTS SOW--24 Mar 2011.pdf PDF
Data List for ARTS Program.pdf PDF
Instructions B-1 ARTS Draft Request for Proposal.pdf PDF
PATEC Core Specification Document REV5.pdf PDF
Show all 50

B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

B-1 Advance Radar/Electronic Warfare Test Station (ARTS)

Request for Proposal (RFP) FA8533-11-R-31160

22 December 2011

The following questions have been received in the WR-ALC/GRVKBB, Major Programs Contracting Office on the above ARTS requirement. The questions as well as the applicable answers are provided below for assistance to all potential offerors for the greater understanding of the Government’s requirement.

Question 1: Paragraph 3.2 Performance Requirements states “Consolidation of functional requirements and design specifications contained in these subsections is acceptable while still meeting the testing requirements of the LRU’s listed in Table 2-1.” Is it acceptable to modify the requirements specified within the PD to meet the testing requirements of the LRU’s listed in Table 2.1?

Government Response: The statement referenced is for consolidation of functional requirements, not modification of the requirements. The intent of the statement is to provide some latitude and flexibility in the selection and integration of test and measurement equipment (i.e. design specifications) to meet the functional requirements. For example, this statement permits a bidder to utilize a single instrument to perform the RF frequency measurement (PD 3.2.4.2.2) and RF power measurement (PD 3.2.4.2.4) as long as the instrument meets the performance requirement as stated in the PD and the testing requirements of the LRUs. Consolidation is permissible as long as the requirements of the PD and the testing requirements of the LRUs are met.

Question 2: Page 13 of the RFP shows CDRL 0005AB refers to ELIN C005, Computer Software Flowchart. This appears to be an error since C005 is Software Product Specification. We believe the correct reference is C003. Please confirm if this is the case.

Government Response: SubCLIN 0005AB should have ELIN C003 referenced. Amendment 0003 will correct this reference.

Question 3: Data in Support of CLIN 0001 (Test Station) starts at the bottom of page 8 of the RFP. Included in Test Station data is CLIN 0004AG (ELIN E001, Logistics Management Information (LMI) Data Products(s)) and CLIN 0004AH (ELIN E002, Supplemental Data for Provisioning (SDFP)). It appears CLIN 0002 (Station TPS Development) does not have corresponding Data CLIN's for LMI and SDFP. We can't include pricing for them in CLIN's 0004AG and 0004AH since those CLIN's are for only CLIN 0001 (Test Station). Where should we put the pricing associated with LMI and SDFP for Station Self-Test TPS (CLIN 0002AA) and Station Calibration TPS (CLIN 0002AB)?

Government Response: SubCLINs 0005AC and 0005AD will be incorporated via Amendment 0003 to allow for separately priced provisioning line items.

Question 4: It is requested that the Government revisit the position stated in response to question 35 of the Q&A document dated 13 December 2011, in which the Government stated, “The manuals listed are either (1) classified supplements that will be made available after the contract award or (2) technical orders for the test procedures for the Shop Replaceable Unit (SRUs) on DATSA and not applicable or needed for proposal purposes.” The TO’s are again requested for the purpose of refining the understanding of the technical requirements, e.g. I/O connector design, load rates, and frequency ranges.

Government Response: After a second consideration, the Government reaffirms its original position. The technical documentation previously requested will not be provided due to the documents either being classified, not applicable to this effort, or not needed for proposal purposes. The Government’s position is that the technical data provided thus far is sufficient for understanding the technical requirements in terms of preparing and submitting a technical proposal. The technical manuals, TRDs, TPS source code, and PD that have been made available collectively provide adequate information for understanding the technical requirements for proposal preparation. The TRDs provide detailed information of the I/O for the LRUs to include, but not limited to, the connector part numbers and discrete signal information for every I/O signal to/from the LRU. The technical manuals already provided contain timing diagrams for digital stimulus/response for the LRUs. Although the band break frequency information is not provided at this time due to secret classification, the overall RF frequency range requirements are provided in the PD. In addition, the data items already provided contain information for the functional test groups (i.e. what functions of the LRU are tested and how), ATE resource and functional allocation (i.e. what instrument functionality is currently used for testing of the LRU), and other information pertinent to the development (& pricing) of a TPS.

Question 5: In addition, the following documents are requested:

12P3-2ALQ161-222
TD-1258A/ALQ-161
Intermediate Maintenance Instructions for Generator Reference Signal (Waveform Generator) (This is needed to be compliant with PD spec paragraph 3.7, which shows knowledge of these UUT’s for successfully testing.)
12P3-2ALQ161-142
R-2275/ALQ-161A
Intermediate Maintenance Instructions for Receiver, Countermeasures (Tail Warning Function Receiver Processor)
12P2-2ALQ161-202
RT-1279B/ALQ-161A
Intermediate Maintenance Manual, Repeater, Radio RT – (Band 7 Repeater/RF Source)
12P3-2ALQ161-212
RT-1431/ALQ-161A
Intermediate Maintenance Manual, Repeater, Radio (Band 8 Repeater/RF Source)
12P2-2ALQ-161-192
RT-1259B/ALQ-161A
Intermediate Maintenance Manual, Repeater, Radio (Band 6 RF AMP/RF Source)
12P3-2ALQ161-362
KY-859A/ALQ-161A
Intermediate Maintenance manual Encoder-Coupler, Digital Data (Direction Finding Encoder)
12P3-2ALQ-161-272
C-11227A/ALQ-161A
Intermediate Maintenance Manual Controller, Countermeasures, (Advanced Tracking Unit)
12P3-2ALQ161-182
RT-1257A/ALQ-161A
Intermediate Maintenance manual, Generator, Reference (Band 4/5 RF Source)
12P3-2ALQ161-112
R-2112B/ ALQ-161A
Intermediate Maintenance Manual, Receiver, Countermeasures, (Interferometer Receiver)
35D29-5-6-1
098558-0100
Operators Instruction Manual

Government Response: The preponderance of the additional T.O.s requested are classified and will be made available after contract award. The technical manuals for the DAAE stations provide detailed information on the signals used for LRU simulation and how those signals are generated and used for LRU testing. These technical manuals combined with the LRU data (TRDs and TPS source code) provide sufficient information to gain a better understanding of the technical requirements of section 3.7 of the PD.

Question 6: Reference: Oil Cooling Cart: The CID A-A-59828 specification does not describe the part number or pin out of the controlling interface/interrupt monitor connector. Request the Government identify the existing manufacturer of the LCU or at least the connector part number and the pin-out signals for the missing connector information.

Based on the power consumption specification, it seems that the unit might not have refrigeration in it since it runs on 20 amp at 115 volt single phase service. Please confirm that is the case as the specification may be incorrect and it should be 3 phase operation based on the heat load to be dissipated at 95 degree ambient air and 115 degree oil supply temperature.

Government Response: The interlock connector (J7) on the existing oil cooling cart has the following information IAW T.O. 35D29-5-6-1:

P/N: MS27656T15F97PA

NSN: 5935-01-275-2811

However, IAW Federal Logistics Information System (FLIS) this connector PN and NSN have been replaced by the following item:

P/N: MS27656T15B97PA

NSN: 5935-01-046-0226

Please see the data sheets posted along with this Q&A document.

The +28V interlock signal from the oil cooling cart is output to J7-B, K of the oil cooling cart. The grounding pins are J7-D, F. The auto mode signal from the IATE is a +12V signal input to the oil cooling cart via J7-H.

The power requirements for the oil cooling cart is as follows: 120VAC, 20A, 60 Hz, single phase Question 7: Reference: LCU coolant fittings: A) What are the hydraulic fittings part numbers used on the current LCU?

B) What are the mating fittings for them?

C) Which fitting is used for output to cool the UUT and which is the return?

Government Response: The hydraulic fittings, which are quick disconnects (QD), for the LCU and LRU are as follows:

LCU

P/N: AE83066G (Eaton Corp.)

NSN: 4730-01-172-2106

LRU

P/N: AE98509G (Eaton Corp.)

NSN: 4730-01-190-7984

-OR-

P/N: AE98521G (Eaton Corp.)

NSN: 4730-01-191-5139

Please see the data sheets posted along with this Q&A document.

Inlet and outlet hoses for LCU have same QD connector.

Question 8: Request a two week extension to evaluate and review the missing technical documentation.

Government Response: The Government will not extend the RFP closing date at this time as no new technical documentation has been provided.