About this file

Question and Answer dated 17 January 2012

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis, newest first.
File Type Posted
Drawing 3202300 Sheets 24 25.pdf PDF
FA853311R31160______0004.pdf PDF
PD10WRGBGBEA34_Rev_E.doc DOC document
FA853311R31160______0003.pdf PDF
PD10WRGBGBEA34_Rev_D.pdf PDF
QA 6 Jan 12.doc DOC document
LCU_fitting_info.pdf PDF
QA 16 Dec 11.doc DOC document
Attachment_6_Quantity_Ranges.doc DOC document
PD_Rev_C.pdf PDF
FA853311R31160______0002.pdf PDF
9579776_98752.pdf PDF
QA RFP.doc DOC document
9579777_98752.pdf PDF
Wrapper Common SRS 20110405.pdf PDF
FA853311R31160______0001.pdf PDF
VDATS_Wrapper_Style_Guide.pdf PDF
FA853311R31160_A006_Training_Materials.pdf PDF
FA853311R31160_A002_Test_Inspection_Report.pdf PDF
FA853311R31160_Attachment_3_Transmittal_Letter.doc DOC document
FA853311R31160_B006_Request_for_Deviation.pdf PDF
FA853311R31160_B003_Conference_Agenda.pdf PDF
FA853311R31160_E001_LMI_Data_Products.pdf PDF
FA853311R31160_C003_Computer_Software_Flowchart.pdf PDF
FA853311R31160.RTF RTF text file
FA853311R31160_Appendix_B_13Oct11_7pages.doc DOC document
FA853311R31160_B002_Integrated_Master_Schedule.pdf PDF
FA853311R31160_DD_Form_254.pdf PDF
FA853311R31160_A003_Technical_Report-Study_Services.pdf PDF
FA853311R31160_D001_TMCR.pdf PDF
FA853311R31160_B-1-Weapon-System-Program-Security-Classification-Guide_Section-IX.pdf PDF
FA853311R31160_ARTSSOW.docx DOCX document
FA853311R31160_Attachment_1_FACTS_Sheet.pdf PDF
FA853311R31160_AFMC158.pdf PDF
FA853311R31160_Attachment_6_Quantity_Ranges.doc DOC document
FA853311R31160_Attachment_4_Client_Authorization_Ltr.doc DOC document
FA853311R31160_C009_ACPIN.pdf PDF
FA853311R31160_A001_Test_Plan.pdf PDF
Questions and Answers_14 Nov 2011.doc DOC document
B-1 Weapon System Program Security Classification Guide Section IX.pdf PDF
DD Form 254.pdf PDF
Q A and Reminder--DRFP.doc DOC document
Information--DRFP.doc DOC document
NA-84-1110H B-1B ATLAS and Protocol Programming Manual Vol I.pdf PDF
Q A DRFP.doc DOC document
ARTS SOW_30 Mar 11.pdf PDF
ARTS SOW--24 Mar 2011.pdf PDF
Data List for ARTS Program.pdf PDF
Instructions B-1 ARTS Draft Request for Proposal.pdf PDF
PATEC Core Specification Document REV5.pdf PDF
Show all 50

B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers B-1 Advance Radar/Electronic Warfare Test Station (ARTS)

Request for Proposal (RFP) FA8533-11-R-31160

17 January 2012 The following questions have been received in the WR-ALC/GRVKBB, Major Programs Contracting Office on the above ARTS requirement. The questions as well as the applicable answers are provided below for assistance to all potential offerors for the greater understanding of the Government’s requirement.

Question 1: The latest Revision D to PD10WRGBGBEA34 reduces the LV Parallel discrete I/O (3.2.2.5) from 264 to 0 and Digital Parallel Stimulus/Measurement Capability (3.2.3.7) from 232 to 216 resulting in a total of 216 channels to support the testing of the LRUs.

Many of the LRUs cannot be supported utilizing this low quantity of digital channels especially when monitoring Automatic Ground Equipment (AGE) signals. The station digital sub-system design as a result of the detailed analysis of the LRU I/O and the real-time interactive complexity of the buss structures is directly impacted as a result of the decrease in station channel count required for accurate LRU simulation.

Should the significant increase in additional LV channels needed to meet the LRU simulation testing requirements be included in the station design and price to support LRU testing?

Government Response: The requirements in revision D of the PD in sections 3.2.2.5 and 3.2.3.7 represent the digital capability that is comparable to the existing capability in the R/EW test station (T.O. 33D7-33-195-1). The LRU Simulation Requirements in Section 3.7 (including subsections) requires additional digital capability that is not reflected in sections 3.2.2.5 and 3.2.3.7. Therefore, the total digital capability for ARTS is a combination of those requirements as stated in sections 3.2.2.5, 3.2.3.7, and 3.7 (to include subsections) of the PD.

Each offeror shall ensure that its technical proposal as well as its proposed prices includes the digital capability needed to meet the LRU testing requirements, including LRU simulation, to support LRU testing.

Question 2: PD paragraph 3.2.2.5 has been revised by Amendment 0003 to add a programmable pulse width requirement of 50nS to 500uS. The rise/fall times for the +28VDC and +73VDC signal remain specified as < 1 mS and <2 mS respectively. This is an extremely long rise time for a narrow pulse of 50nS. At +73VDC the signal will be more of a triangle than a pulse. Has the pulse width been specified correctly or is the 50 nS to 500 uS intended to be a resolution requirement?

Government Response: The pulse width has been specified correctly. Please reference paragraph 4-311 of T.O. 33D7-33-195-1 on page 4-37 for the origin of this requirement. The rise/fall times are specified as not to exceed; therefore, the rise/fall shall be less than the specified parameter (i.e. <1 mS or <2 mS). Shorter rise/fall times may be required in order to achieve the required pulse width.

Question 3: PD paragraph 3.2.3.7 has been revised by Amendment 0003 to add the data transfer rate of 10MHz; however, the reception rates specified in table 3.18 are CD to 200 Hz. These requirements seem to contradict each other. Please clarify.

Government Response: The origin of the 10 MHz data transfer rate can be found in paragraph 4-437 of T.O. 33D7-33-195-1 on page 4-49. The “reception” rate for each voltage level as found in paragraph 4-478 of T.O. 33D7-33-195-1 on page 4-52.1 should read “repetition” (not reception). This was verified by reviewing sheet 21 of drawing 3203044 for the LV Parallel pin I/F CCA (drawing attached).

Question 4: Reference: Amendment 0003, PD Specification Rev D, Page 30, top paragraph “I/O channels shall be programmable in input voltage, output voltage, output current and single/differential mod in groups of 8 or less. Channels shall be programmable as input or output in subgroups of 4 or less. The LV and HV parallel channels shall be individually programmable in output voltage amplitude on each channel within the voltage ranges specified in Table 3-18.”

This statement means that current is a programmable function of these discrete, yet there is no mention of programming resolution for current; therefore, we assume that current programmability is only relative when multiple drivers are paralleled to obtain the current required by the load. Please confirm this is the intent.

Government Response: Yes, the assumption and understanding is correct. Programming of the current levels is done in groups of eight (8) drivers. Please refer to the last sentence in paragraphs 4-468 and 4-479 of T.O. 33D7-33-195-1. Also reference the last sentence of section 3.4.4 of drawing 3203044 sheet 21 (drawing attached).