Q A 12 Jan 12.doc

DOC document 84 KB Posted

Attached to
B-1 Advanced Radar/Electronic Warfare Test Stations (ARTS) Synopsis
Solicitation number
FA8533-11-R-31160
Issued by

About this file

Question and Answer dated 12 January 2012

View the file

Other files

File Type Posted
Drawing 3202300 Sheets 24 25.pdf PDF
QA 17 Jan 12.doc DOC document
FA853311R31160______0004.pdf PDF
DWG 3203044 Sheet 21.pdf PDF
PD10WRGBGBEA34_Rev_E.doc DOC document
QA 9 Jan 12.doc DOC document
FA853311R31160______0003.pdf PDF
Training Materials.pdf PDF
PD10WRGBGBEA34_Rev_D.pdf PDF
QA 6 Jan 12.doc DOC document
LCU_interlock info.pdf PDF
LCU_fitting_info.pdf PDF
QA 22 Dec 11.doc DOC document
QA 16 Dec 11.doc DOC document
FA853311R31160______0002.pdf PDF
Attachment_6_Quantity_Ranges.doc DOC document
TMCR.pdf PDF
PD_Rev_C.pdf PDF
9626025_98752.pdf PDF
Attachment 1--legacy LRU blower_SCD pg16.pdf PDF
9579776_98752.pdf PDF
9579777_98752.pdf PDF
QA RFP.doc DOC document
Document request.doc DOC document
Wrapper Common SRS 20110405.pdf PDF
FA853311R31160______0001.pdf PDF
VDATS_Wrapper_Style_Guide.pdf PDF
VDATS_Wrapper_Style_Guide.pdf PDF
FA853311R31160_E001_LMI_Data_Products.pdf PDF
FA853311R31160_B004_Conference_Minutes.pdf PDF
FA853311R31160_App-C.doc DOC document
FA853311R31160_A003_Technical_Report-Study_Services.pdf PDF
FA853311R31160_C003_Computer_Software_Flowchart.pdf PDF
FA853311R31160_C002_Data_Accession_List.pdf PDF
FA853311R31160_B005_Engineering_Change_Proposal.pdf PDF
FA853311R31160_A006_Training_Materials.pdf PDF
FA853311R31160_A002_Test_Inspection_Report.pdf PDF
FA853311R31160_C001_Request_for_Nomenclature.pdf PDF
FA853311R31160_B-1-Weapon-System-Program-Security-Classification-Guide-Section-XIII.pdf PDF
FA853311R31160_C008_Computer_Software_Product_End_Items.pdf PDF
FA853311R31160_A004_Design_Review_Information_Package.pdf PDF
FA853311R31160_A005_Engineering_Support_Data.pdf PDF
FA853311R31160_Attachment_3_Transmittal_Letter.doc DOC document
FA853311R31160_E002_Supplemental_Data_for_Provisioning.pdf PDF
FA853311R31160_B006_Request_for_Deviation.pdf PDF
FA853311R31160_B003_Conference_Agenda.pdf PDF
FA853311R31160.RTF RTF text file
FA853311R31160_C007_Calibration_Measurements_Requirements.pdf PDF
FA853311R31160_C006_Firmware_Support_Manual.pdf PDF
FA853311R31160_Appendix_B_13Oct11_7pages.doc DOC document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers B-1 Advance Radar/Electronic Warfare Test Station (ARTS)

Request for Proposal (RFP) FA8533-11-R-31160

12 January 2012 The following questions have been received in the WR-ALC/GRVKBB, Major Programs Contracting Office on the above ARTS requirement. The questions as well as the applicable answers are provided below for assistance to all potential offerors for the greater understanding of the Government’s requirement.

Question 1: As a result of Amend 0003, will the Government be issuing a revised Section B to fully include the added SubCLINs 0005AC and 0005AD and to correct the ELIN reference and the units of issue?

Government Response: The Government does not intend to issue a revised Section B. Offerors shall include the pricing of SubCLINs 0005AC and 0005AD within Amendment 0003. As noted on all three amendments, each one is to be signed and returned with the offeror’s proposal. The changes incorporated via amendments to the RFP will be included within the resultant contract.

Question 2: The current payment terms appear to be in severe tension with both the FAR Part 12 “Commercial Item” provisions and those sections of the FAR applicable to non-commercial item procurements. In response to a previous question, the Government stated in its 16 Dec 11 Questions and Answer posting the following:

“The “Interim Payment” clause on page 137 of the solicitation was written in accordance with the guidance in FAR 32.104 relative to performance based payments in commercial contracts.”

Notably, however, by its own terms, Subpart 32.1, which includes section 32.104, applies only to non-commercial items and is labeled “Non-Commercial Item purchasing Financing.” It cannot therefore serve as the basis of the payments clause.

Government response: The company asserts that the Government's reference to FAR 32.1 in the "Questions and Answers" regarding the payment clause (posted to the FBO on 16 December 2011) was in error. The company's assertion is incorrect. The "Interim Payment" clause in RFP FA8533-11-R-31160 adheres to the requirements in FAR 32.2, Commercial Item Purchase Financing in both intent as well as content. Note that the policy of FAR 32.2 allows for the techniques and procedures from non-commercial subparts to be utilized with commercial contract financing.

Per FAR 32.202-1(a), "It is the responsibility of the contractor to provide all resources needed for performance of the contract. Thus, for purchases of commercial items, financing of the contract is normally the contractor's responsibility. However, in some markets the provision of financing by the buyer is a commercial practice. In these circumstances, the contracting officer may include appropriate financing terms in contracts for commercial purchases when doing so will be in the best interest of the Government." After extensive consideration, the Government determined commercial contract financing, and thus the procedures in FAR 32.204, to be in the best interest of the Government. As such, the Government exercised its authority per FAR 32.202-1(c) which states the Government may adapt techniques and procedures from the non-commercial subparts for use in implementing commercial contract financing arrangements. The non-commercial financing technique utilized in the drafting of the Government-specified commercial interim payment clause is the performance-based payments technique discussed in FAR 32.104(d) and FAR 32.10.

The "Interim Payment" clause in the subject RFP was specifically written and tailored to the B-1 ARTS requirement, and serves to assist both the contractor and the Government. By means of the clause, the contractor is afforded the opportunity to receive periodic payments while adequate security is provided to the Government via the performance measurements identified therein. There will be no change to the "Interim Payments" clause in the RFP nor, correspondingly, to the "Evaluation Basis for Award" provision to allow the proposal and negotiation of financing terms.

File details come from the government source that posted it. Updated .