Atch 3 - Facts Sheet 11-R-0002.doc

DOC document 47 KB Posted

Attached to
Mechanical/Electrical IDIQ Construction Contract Federal contract opportunity
Solicitation number
FA8501-11-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This attachment is word version of Attachment 3 for this solicitation. The previous version was pdf. THis word version will provide for easier tailoring by contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical/Electrical IDIQ Construction Contract, newest first.
File Type Posted
CLARIFICATION - FA8501-11-R-0002 28 APR 2011.docx DOCX document
Atch 7 FA8501-11-R-0002.doc DOC document
Question Answers 2 FA8501-11-R-0002.doc DOC document
Mech Elec IDIQ - Pre-proposal conference.ppt PPT presentation
Q A 1 - FA8501-11-R-0002.docx DOCX document
History Info - Current Mech Elec IDIQ.pdf PDF
Sign in sheet - Pre-proposal meeting FA8501-11-R-0002.pdf PDF
Atch 8 Consent Form 11-R-0002.doc DOC document
Atch 6 Transmittal Letter 11-R-0002.doc DOC document
Atch 5 Tracking record 11-R-0002.doc DOC document
Atch 10 11-R-0002.pdf PDF
Atch 4 Client auth Letter 11-R-0002.doc DOC document
Atch 9 FA8501-11-R-0002.pdf PDF
Atch 7 FA8501-11-R-0002.docx DOCX document
Specs.zip ZIP file
FA8501-11-R-0002.rtf RTF text file
Atch 2 FA8501-11-R-0002 Appendix C.pdf PDF
Atch 3 - Facts Sheet 11-R-0002.doc.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8501-11-R-0002

ATTACHMENT #3

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Present/Past Performance “FACTS Sheet”

(TO BE COMPLETED BY OFFEROR, AND IF APPLICABLE, CRITICAL SUBCONTRACTOR)

Complete a separate FACTS Sheet for each relevant contract. See Clause L-900 of this RFP for detailed instructions and limits on number and recency of contracts. Provide frank, concise comments regarding present/past performance on the program identified in B. below.

A. OFFEROR: (Including: (1) Name (Company/Division), (2) Address: (3) CAGE Code)

B. PROGRAM TITLE and CONTRACT NUMBER:

C. NAME OF CONTRACTING ACTIVITY OR CUSTOMER:

D. CONTRACT TYPE(S) – PLEASE LIST ALL THAT APPLY (firm fixed price, time & materials, etc.)

E. CONTRACT $ VALUE:

1. Original contract $ value and current $ value:

2. Estimated value at completion and primary causes of changes:

3. If Award Fee Contract, what percentages of the fee have been awarded in each of last 3 years?:

F. BRIEF DESCRIPTION OF EFFORT AS: _____ PRIME _____ SUBCONTRACTOR

1. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified in B. above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph B to the proposed effort. This is limited to two pages beyond the page limitation of the FACTS sheet information.

Category
Fill-in for the Proposed Effort (GOVT IPT completes)
Fill-in for the Effort Identified in para. B above (Offeror completes)
1. Nature of Business Area(s) Involved
Mechanical/Electrical repair, maintenance and design
2. Required Levels of Technology
HVAC, HVAC Direct Digital Controls, Medium-Voltage distribution, Fire Alarms, and steam distribution and use of related equipment and procedures and technology
3. Materials and Production Processes
HVAC, HVAC Direct Digital Controls, Medium-Voltage distribution, Fire Alarms, and steam distribution and use of related equipment and procedures and technology
4. Performance Location
Robins AFB, GA

Government Installation

5. Contract Type(s)
FFP/IDIQ
6. Quantities produced, # repaired or other quantitative data
Mechanical/Electrical maintenance, repair, and design will be conducted on facilities base wide
7. Program Similarity
Mechanical/Electrical maintenance, repair, and design of similar size and complexity
8. Program Complexity
Overall management, schedule development and control, and quality control of several highly skilled workforces operating base wide in order to perform work in a minimum of time with a high quality of workmanship and final products.
9. Extent of subcontractor involvement
Mechanical/Electrical maintenance, repair, and design
10. Other
Heavy emphasis on schedule compliance, not impacting base missions and requirements, and minimizing rework to an absolute zero.

NOTE: Please ensure that the facts sheets provides adequate information for the Government team to be able to assess relevancy determinations. Such as the following:

a. Did you identify whether you were the prime or subcontractor for that effort?

b. Did you adequately describe the effort and your role in that effort? Did you manage or perform the effort?

c. If the effort involves Fire alarm work, HVAC work, steam distribution work, medium voltage work or direct digital controls work did you adequately describe the magnitude/complexities of the effort?

d. Did you engineer/design or install/perform the effort?

2. This paragraph shall also include details to support the offeror’s record for on time delivery, technical quality and cost control for this effort identified in paragraph B. above.

3. ALL OFFERORS MUST ADDRESS IN WRITING, whether or not the offeror carried out the policy of the United States in the awarding of subcontracts to small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance. Discuss your compliance with FAR 52.219-8, Utilization of Small Business Concerns. For each contract for which a FACTS Sheet is submitted, the offeror must state whether or not the contract contained FAR clause 52.219-8. If the contract did contain FAR clause 52.219-8, the offeror must indicate a “yes” or “no”, whether the offeror complied with the policy stated in FAR clause 52.219-8 when performing this contract. If FAR clause 52.219-8 was included but the offeror did not comply, the offeror must explain why they did not comply. If none of the contracts contained FAR clause 52.219-8, the offeror must CLEARLY identify two additional contracts which the offeror performed which contained FAR clause 52.219-8. For each of these two contracts, the offeror must indicate a “yes” or “no”, whether the offeror complied with the policy stated in clause FAR clause 52.219-8 when performing the contract. If the offeror can only identify one such additional contract, the offeror should state this CLEARLY on the FACTS Sheet, RFP Attachment 3, and indicate a “yes” or “no”, whether the offeror complied with the policy stated in FAR clause 52.219-8 when performing the contract. If the offeror has never performed a contract which contained FAR clause 52.219-8, the offeror must CLEARLY state this on the FACTS Sheet, RFP Attachment 3. Please note that FAR clause 52.219-8 does apply to ALL offerors

G. PERIOD OF PERFORMANCE:

1. Original schedule and current schedule:

2. Estimate @ completion:

3. How many times changed and primary causes of changes:

H. PRIMARY POINTS OF CONTACT: (The offeror is responsible for exerting its best efforts to ensure that current information is provided for all individuals.)

Name and Office Symbol
Phone Number
FAX Number
1. Procuring Contracting Officer
DSN & Comm
DSN & Comm
2. Program Manager
DSN & Comm
DSN & Comm
3. Administrative Contracting Officer
DSN & Comm
DSN & Comm
4. Other (Please Specify)
DSN & Comm
DSN & Comm

I. If the offeror or critical subcontractor (if applicable) is a newly formed entity who either has no prior contracts or does not possess relevant corporate past performance, but does have key personnel with relevant past performance while employed by another company, specify by name such key individual(s) who will participate in the proposed effort under this acquisition who also participated in the program identified in B. above, and indicate their contract role. Describe how participation of these key personnel contributed to the success of the previous effort and how this indicates probability of success on the proposed effort.

J. Use this space to address any aspect about this program considered unique. Describe quality awards or certifications that indicate the offeror possesses a high-quality process for developing and producing the product/service required.

K. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in paragraph B. above.

L. Additionally, for those efforts where the offeror is cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. This narrative portion is limited to one (1) additional page beyond the FACTS sheet required page limitation. It is not presumed that the offeror's performance has been perfect. Rather, the proposal should contain evidence of the offeror's ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed by the offeror, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.

M. Was this contract effort (as identified in paragraph B. above) submitted as a past performance source of data for a previous WR-ALC procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .