This document is a draft contract line item number (CLIN) structure for Task Order 4 under contract number FA8207-20-F-2004.
The CLIN structure outlines various engineering and technical services to be provided on a cost-plus-award-fee basis. Services include data management, specialty engineering, test and assessment, and DMSMS. Pricing is set as cost reimbursement for travel and other direct costs. Performance will take place from April 2022 through April 2027. Award fees are established for each evaluation period and held in contingent liability. Deliverables include CDRLs in support of the CLINs. The services are to be provided to the Department of the Air Force Materiel Command Nuclear Weapons Center in accordance with the PWS and Labor Quantity Workbook in Section J.
View the file
Other files for this federal contract opportunity
Show all 50
Integration Support Contract (ISC) 2. 0 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER FOR SUPPLIES OR SERVICES RS
1. CONTRACT/PURCH ORDER/AGREEMENT NO.
FA820720D9999
2. DELIVERY ORDER/CALL NO.
FA8207-20-F-2004
3. DATE OF ORDER/CALL
(YYYYMMMDD)
4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY
DX: A2
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFNWC PZBC
6008 WARDLEIGH ROAD BLDG 1580
HILL AIR FORCE BASE UT 84056-5837
BUYER: Stephen Gacioch/AFLCMC stephen.gacioch@us.af.mil
Phone: (801) 586- 8042
7. ADMINISTERED BY (If other than 6) CODEFA8207 8. DELIVERY FOB
DESTINATION
OTHER
(See Schedule if other)
X
9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date)
(YYYYMMMDD)
SEE SCHEDULE
12. DISCOUNT TERMS
11. X IF BUSINESS IS
SMALL
SMALL
DISAD-VANTAGED
WOMEN-OWNED
13. MAIL INVOICES TO
SEE BLK 15
14. SHIP TO CODE
SEE LINE ITEM SCHEDULE
15. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.) MARK ALL
PACKAGES AND
PAPERS WITH
IDENTIFICATION
NUMBERS IN
BLOCKS 1 AND 2.
16.
TYPE
OF
ORDER
DELIVERY/
CALL
PURCHASE
X This delivery order/call is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract.
Reference your Dated: furnish the following terms specified herein.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
If this box is marked, supplier must sign Acceptance and return the following number of copies: 1 (YYYYMMMDD)
18.
ITEM NO.
19.
SCHEDULE OF SUPPLIES/SERVICES
(SEE SCHEDULE)
20. QUANTITY
ORDERED/
ACCEPTED*
21.
UNIT
22.
UNIT PRICE
23.
AMOUNT
ROUTINE
* If quantity accepted by the Government is same as quantity ordered, indicate by X. If different, enter actual quantity accepted below quantity ordered and encircle.
24. UNITED STATES OF AMERICA
BY: Kyle G. Chase kyle.chase@us.af.mil
CONTRACTING/ORDERING OFFICER - -
X
25. $
26.
DIFFERENCES
27a. QUANTITY IN COLUMN 20 HAS BEEN:
INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO
THE CONTRACT EXCEPT AS NOTED:
28. SHIP. NO.
PARTIAL
FINAL
29. D.O. VOUCHER NO.
36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.
31. PAYMENT
COMPLETE
PARTIAL
FINAL
32. PAID BY
30.
INITIALS
33. AMOUNT VERIFIED CORRECT FOR
34. CHECK NUMBER
35. BILL OF LADING NO.
37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED
(YYYYMMMDD)
40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.
DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
SEE SCHEDULE
SCD:A
EFT:T
ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE
(YYYYMMMDD)
d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
f. TELEPHONE NUMBER g. E-MAIL ADDRESS
a. DATE
(YYYYMMMDD)
b. SIGNATURE AND TITLE OF CONTRACTING OFFICER
Total
FA8207-20-F-2004
SUPPLIES OR SERVICES AND PRICES/COSTS
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
II XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
The Total Award Fee amounts are held in Contingent Liability
Specialty Engineering - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Specialty Engineering - FTE
COST PLUS AWARD FEE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Test & Assessment - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
DMSMS - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Alt-LDTO - FTE
Item No.
Cost Plus Award Fee
Alt-LDTO - FTE
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
DATA MANAGEMENT - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
DATA MANAGEMENT - CME
COST PLUS AWARD FEE
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Specialty Engineering - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Test & Assessment - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
DMSMS - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
DMSMS - CME
COST PLUS AWARD FEE
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Alt-LDTO - CME
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Alt-LDTO - CME
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
I XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
DATA MANAGEMENT - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
R425
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
Test & Assessment - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
Alt-LDTO - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0070 DATA IAW DD 1423 - Attached in Section J
Limitations of Liability: Other Than High Value Item
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2022 20 APR 2023
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
IV XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee
DMSMS - FTE
COST PLUS AWARD FEE
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Alt-LDTO - FTE
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J..
Test & Assessment - CME
COST PLUS AWARD FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J..
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
III XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
DATA MANAGEMENT - Travel & ODC
COST REIMBURSEMENT - NO FEE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
Test & Assessment - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
Test & Assessment - Travel & ODC
COST REIMBURSEMENT - NO FEE
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
Alt-LDTO - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
R425
Alt-LDTO - Travel & ODC
COST REIMBURSEMENT - NO FEE
Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0070 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
DATA RIGHTS
NOT SEPARATELY PRICED
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2023 20 APR 2024
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
VI XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Specialty Engineering - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Test & Assessment - FTE
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee
DATA MANAGEMENT - CME
COST PLUS AWARD FEE
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Specialty Engineering - CME
COST PLUS AWARD FEE
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook
Alt-LDTO - CME
COST PLUS AWARD FEE
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
V XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 SEP 2024 20 APR 2025
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 SEP 2024 20 APR 2025
Test & Assessment - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 SEP 2024 20 APR 2025
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 SEP 2024 20 APR 2025
Alt-LDTO - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 SEP 2024 20 APR 2025
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
DATA
DATA - CDRLs in support of CLINs 0001 - 0070 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW Section J CDRLs and PWS Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
DATA RIGHTS
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2024 20 APR 2025
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services
DATA MANAGEMENT - FTE
COST PLUS AWARD FEE
The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
VIII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Specialty EngineeringT - FTE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
DMSMS - FTE
COST PLUS AWARD FEE
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
FTE
Engineering Services The Contractor shall provide FTEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Alt-LDTO - FTE
COST PLUS AWARD FEE
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee
Test & Assessment - CME
COST PLUS AWARD FEE
Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
DMSMS - CME
COST PLUS AWARD FEE
Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
The available Award Fee is established in the amount of $XX,XXX.XX
Evaluation Period Amount Available Amount Earned
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Plus Award Fee Quantity U/I Est Unit Cost Award Fee Total Estimated Cost
1 LO
R425
CME
Engineering Services The Contractor shall provide CMEs for engineering/technical services IAW PWS 4 and the Labor Quantity Workbook attached in section J.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
VII XX XXX XXXX - XX XXX XXXX $XX,XXX.XX $XX,XXX.XX (XX.XX%)
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
Specialty Engineering - Travel & ODC
COST REIMBURSEMENT - NO FEE
1 LO 21 APR 2025 20 APR 2026
Test & Assessment - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
DMSMS - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
Alt-LDTO - Travel & ODC
COST REIMBURSEMENT - NO FEE
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Travel & ODCs Travel & ODCs in support of Engineering Services IAW Section 3.10 & 3.17 of the Basic PWS and Awardable Tasks
PWS.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 21 APR 2025 20 APR 2026
DATA - CDRL DELIVERABLES FOR CLINS 0001 - 0070
NOT SEPARATELY PRICED
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA - CDRLs in support of CLINs 0001 - 0070 DATA IAW DD 1423 - Attached in Section J Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .