19 November Industry Day Slides - Final.pptx
PPTX presentation 4 MB Posted
- Attached to
- Integration Support Contract (ISC) 2. 0 Federal contract opportunity
- Solicitation number
- FA8207-20-ISC-2
About this file
This document summarizes an industry day presentation for the Integration Support Contract 2.0 (ISC 2.0) opportunity. The ISC 2.0 is an indefinite-delivery/indefinite-quantity contract with a ceiling of $12 billion and minimum of $50 million to provide engineering, integration, and professional services support to the ICBM Systems Directorate and Minuteman III and Ground Based Strategic Deterrent System Program Offices at Hill Air Force Base. The 18-year contract includes one 5-year base period and two 5-year option periods, along with three 1-year option periods and a potential 6-month extension. The acquisition strategy involves full and open competition with a tradeoff source selection and cost-plus-award-fee contract type. Proposals are due 60 days after release of the draft RFP in January 2020, with contract award planned for June 2021. Small business participation is an evaluation factor with a 20% target.
View the file
Other files for this federal contract opportunity
Show all 50
Integration Support Contract (ISC) 2. 0 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integration Support Contract (ISC) 2.0 Industry Day Poe Conference Center Alex Nebeker ISC 2.0 Program Manager
AFNWC/NIAAC
19 November 2019
Never Doubted, Always Feared
AIR FORCE NUCLEAR WEAPONS CENTER
FOUO
Outline Rules of Engagement Program Team Objectives Procurement Contracting Officer (PCO) Disclaimer FBO.gov Transition Helpful Hints Bottom Line Up Front (BLUF) Notional Schedule Program Overview Acquisition Strategy General Information Source Selection Approach Task Order Structure CLIN Structure Contract Length Rationale H-Clauses Considered Questions
This is an open forum seeking Industry input on requirements and processes. The Government will document questions, ideas and information presented or shared during this event to publicize (excluding proprietary information) general Q&A information on beta.SAM.gov. Any ideas and/or information from Industry Day the Government decides to implement into its acquisition strategy will be publicized as part of the draft RFP.
Government/Industry sidebar conversations/questions during non-One-on-One times are not permissible. All questions/answers during these times will need to be vocalized for all to hear for proper documentation.
Rules of Engagement
The public forum portion of Industry Day is not appropriate for proprietary disclosures. Please advise if any part of your One-on-One discussion is considered proprietary by your company.
Audio/video recording of the presentations is prohibited.
Rules of Engagement
Program Team
| ICBM Systems Directorate | |
| Program Manager | Alex Nebeker, AFNWC/NIAAC |
| Deputy PM | Scott Maisey, AFNWC/NIAAC |
| Contracting Officer | Chris Thomas, AFNWC/PZBC |
| Buyer | Capt Joseph Jones, AFNWC/PZBC; Justin Rogers, AFNWC/PZBB |
| Small Business | James Dean, AFMC OL:H/SB; Kathy Wiser, AFMC OL:H/SB |
| Legal Advisor | Kevin Cutler, 75 ABW/JAQ |
Objectives Conduct market research and provide Industry with an overview of the ISC 2.0 program
Information exchange prior to draft RFP
Provide Industry a clear understanding of the requirements
Understand Industry concerns, risks, and gather suggestions for consideration to be incorporated into the draft RFP
Information provided/exchanged today may change based on feedback from market research
Christopher Thomas
ISC 2.0 PCO
afnwc.pzbc.isc2@us.af.mil PCO Disclaimer
FBO.gov has transitioned to beta.SAM.gov FBO.gov Transition
Nothing stated in this briefing or related discussions is contractually binding. All communications or information which pertains to this effort is for market research purposes only.
Any costs incurred by an offeror prior to receipt of a contract signed by the Government Contracting Officer are the responsibility and risk of the offeror.
PCO Disclaimer
The time to affect the structure of this requirement is now, not after official RFP release Review all draft documents posted to beta.SAM.gov Ask questions Point out areas of concern Do not build your proposal based on draft documents Ensure your proposal addresses EVERYTHING required by Sections L&M of the Solicitation Ensure your company/team has the core competencies to execute this requirement prior to proposing
Helpful Hints
Program Manager Alex Nebeker
ISC 2.0 PM
Bottom Line Up Front (BLUF)
Requirements/Direction Requirement - Provide engineering, integration, and professional services support to ICBM Systems Directorate (ICBMSD), and MMIII and GBSD System Program Offices (SPOs) Using organization(s) –AFNWC/NI; AFGSC
Financial Data Contract Ceiling - $12B Contract Minimum - $50M Strategy Full and Open Competition Source Selection Method: Trade-off Past performance waived Contract type: Single Award ID/IQ Predominately Cost Plus Award Fee Estimated Contract Award: Jun 2021 PoP: 18 years; Jun 2021 – Jun 2039 Ordering period: 18 years; Jun 2021 – Jun 2039 One 5-Year Base Period Two 5-Year Option Periods Three 1-Year Option Periods Optional 6 month extension to Dec 2039
| ISC 2.0 ID/IQ |
| TO 1 – Directorate Support |
| TO 2 – |
MMIII
Sustainment
TO 3 –
MMIII Acquisition
TO 4 –
MMIII Integration
TO 5 –
GBSD Enterprise
Task Order Structure
Notional Schedule
| Event Description | Notional Date |
| Draft RFP | Mid January 2020 |
| Industry Day #2 | Late January 2020 |
| RFP Release | 1Q CY 2020 |
| Proposals Due | 60 calendar days after RFP release |
Program Overview
Performance-Based, Engineering Services contract to fill expertise gaps
Includes:
Requirements from all program/functional areas in both MMIII and GBSD SPOs Engineering Services Contract with incidental A&AS
Does NOT include:
Personal Services Inherently Governmental Functions
ISC 2.0 Overview
ISC 1.0 awarded Jul 2013 Competitively awarded to BAE Systems C-Type, FFPLOE contract Contract ceiling $1.1B PoP: 1 Aug 2013 to 31 Jul 2021 (+ optional 6-month extension) 1-year base Seven 1-year options Optional 6-month PoP extension
ISC Contractual History
Acquisition Strategy
Small Business Small Business participation will be evaluated in Source Selection In execution, Small Business will be evaluated in annual CPARs Anticipated Small Business participation target 20% of total subcontract awards 20% of awarded dollars
Contractor will be required to develop and deliver data IAW Contract Data Requirements Lists (CDRLs) and PWS requirements Government will exert rights to data IAW DFARS clauses 252.227-7013, 7014, and 7015 Government Rights in Data and Software (GRIDS) will be included in RFP and contract Data will reside in a single electronic repository, Integrated Data Environment, to which Government will have continuous and unlimited rights (software and data) CDRL strategy:
Deliverables will include final products Current CDRLs are being revised
Data and IP Strategy
A Multi-Functional Government Team will manage the contract The team will consist of PMs, PCO, CORs, and others as required CORs will monitor Contractor performance to ensure compliance Contractor performance will be evaluated through the use of Award Fee and CPARs processes Management Information Requirements
Contract security requirements will be stated in the DD Form 254 All classified material requiring special security requirements will be listed separately as appendices to the DD Form 254 Contractor personnel will be required to hold appropriate clearances The RFP will not include any classified information Do not include ANY classified information in your proposal
Security Considerations
General Information
Scope includes GBSD, MMIII support through end-of-life, future add-on task orders, and additional ceiling for unanticipated in-scope requirements Use FTE CLIN to maintain consistent day-to-day support Utilize CME CLIN to meet surge support above steady state requirements Assessed by organizational priority Assessed monthly utilizing Monthly Status Report 1 FTE/CME = 1880 hours per year
ISC 2.0 General Information
Approved Basic Award Fee Plan incorporated into each TO as appropriate Feedback sessions between Contractor leadership and TO PMs Quarterly Based on OKR performance Award Fee Review Board (AFRB) evaluates Contractor performance IAW Award Fee Plan Bi-annually All TO AFRBs conducted jointly Align CPARS and select CDRLs to efficiently support Award Fee periods
Notional Award Fee Process Flow
Notional Award Fee Performance Evaluation Areas (PEAs) Performance Quality Responsiveness Innovation Cost FDO Special Interest Items Potentially updated at each Award Fee Review Board - every 6 months
Source Selection Approach
Tradeoff Source Selection Process Factors 1 & 2: Methodology 1 (Separate Technical/Risk Ratings) Color/Adjectival Technical Ratings, Adjectival Risk Ratings Acceptable/Unacceptable for some subfactors Factor 3: Cost/Price No Past Performance factor Order of importance:
All evaluation factors other than cost/price, when combined, are significantly more important than cost or price Factors are listed in descending order of importance Within each factor, subfactors are listed in descending order of importance Source Selection Approach
Factor 1: Technical Approach/Technical Risk Subfactor (SF) 1: Retention/Recruiting Plan (Color/Adjectival) Specialized labor recruitment plan Retention plan SF 2: Transition Plan (Acceptable/ Unacceptable) SF 3: Gov. Rights in Data and Software (GRIDS) (Color/ Adjectival) Factor 2: Program Management (Basic) SF 1: OKR prioritization plan (Color/Adjectival) SF 2: Subcontracting approach (Acceptable/Unacceptable) SF 3: Small Business participation (Acceptable/Unacceptable)
Notional Evaluation Factors
Factor 3: Cost/Price Total Evaluated Price TEP = (3 preselected TOs Total Price x weighted percentage) + [(Preselected Labor Category Rates x predetermined Notional Hrs) x weighted percentage)] + (Transition Cost x weighted percentage) TOs selected prior to RFP release (undisclosed) Labor Categories selected prior to RFP release (undisclosed) Labor Rate Matrix for Prime Contractor Reasonableness Balance Realism evaluated on cost-type CLINs
Notional Evaluation Factors
Task Order Structure
TO 2 – MMIII
Sustainment TO 5 – GBSD Enterprise Scheduling Alt-LDTO Specialty Engineering Test & Assessment TO 4 – MMIII Integration
ACAT II
ACAT III
ACAT I
Data Management Ground Electrical Ground Mechanical ICBM Infrastructure and Equipment (IIE)
RS/RV
Field Support Guidance Propulsion TO 1 – Directorate Support Portfolio Management Transition IT/Cybersecurity (NIT) Finance Security Engineering TO 3 – MMIII Acquisition Security Engineering IT Services
DMSMS
Dem/Val
MK21A
FUZE
FDE
**Effort alignment is subject to change
Separate CLINS for FTE and CME labor support The Government has the right to utilize other than CPAF to include: CPFF, CPIF, CRNF, FFP, FFPLOE, FPIF, and NSP CLIN Structure
| CLIN | |
| X001 | FTE Labor |
| X002 | CME Labor |
| X003 | Data – Rights |
| X004 | Data – CDRLs |
| X005 | Travel |
| X006 | ODCs |
Contract Length Rationale Minimize disruption to GBSD during EMD, LRIP, P&D, and FRP Provide continuity for MMIII support through end-of-life Provide integration from MMIII to GBSD during transition Allows knowledge gained from one weapon system to be incorporated into the other Minimize number of Contractor personnel given access to GBSD Enterprise programs
9952.215 Rate Reopener Clause
9952.227 Enabling Clause Between Prime Contractor and Support Contractors
9952.245 No Exclusive Teaming Arrangements
OCI Hardware exclusion clause (H-Clause number TBD) No development or production allowed H-Clauses Considered
One-on-One Sessions
** The map does not show Building 1578
ISC 2.0 Industry Day One-on-One sessions will be held in Building 1578 Suite 200 on the second floor located inside the West Gate of Hill AFB
Questions Mission Statement
"Deliver a safe, secure, responsive, on-time and on-target nuclear deterrent force to the warfighter as the Nation's Nucleus for ICBM development, acquisition and sustainment."
image2.png image4.png image5.png image1.png