T53_APPENDIX_C_-_Safety_Specifications _25_Feb_2015.pdf

PDF 16 KB Posted

Attached to
T53 Engine Overhaul and Repair
Solicitation number
FA8124-15-R-0005
Issued by

About this file

Appendix C - Safety Specifications

View the file

Other files

File Type Posted
Questions_3.pdf PDF
Questions_2.pdf PDF
Questions_1.pdf PDF
FA8124-15-R-0005-0002.pdf PDF
Questions_1.pdf PDF
FA8124-15-R-0005.pdf PDF
T53_Attachment_C_to_PWS_-_Government_SubAssemblies.pdf PDF
FA8124-15-R-0005-0001.pdf PDF
T53_Attachment_D-1_to_PWS_-_CDRLS_-_ALL.pdf PDF
T53_Attachment_B_to_PWS_-_Acryonyms.pdf PDF
T53_APPENDIX_G_-_Evaluation_Factors_Rev_1 _26_Aug_2015.pdf PDF
T53_Attachment_D_to_PWS_-_CDRLs_DIDs_Summary_30_Apr_15.pdf PDF
T53_Attachment_F-1_to_PWS_-_SPI__T53_Engine_Can.pdf PDF
T53_Attachment_A_to_PWS_-_Technical_Data_v1 _18_Dec_2014.pdf PDF
T53_APPENDIX_H_-_Pricing_Matrix_Rev_1 _26_Aug_2015.pdf PDF
T53_Attachment_D-2_to_PWS_-_DIDS_-_ALL.pdf PDF
T53_APPENDIX_F_-_Instructions_to_Offerors_Rev_1 _26_Aug_2015.pdf PDF
T53_History_as_of_Dec_2014_Time_Remaining.pdf PDF
T53_APPENDIX_A_-_PWS__Rev_1 _25_Aug_2015.pdf PDF
T53_APPENDIX_E_-_Signed_Contract_Skills_Letter_25_Feb_2015.pdf PDF
T53_Attachment_F_to_PWS_-_SPI__T53_Engine.pdf PDF
T53_APPENDIX_C_-_Safety_Specifications _25_Feb_2015.pdf PDF
T53_APPENDIX_D_-_Vendor_Transportation_Instructions.pdf PDF
T53_APPENDIX_B_-_CAV_AF_Government_Property_Management _5_Mar_2014.pdf PDF
T53_Attachment_E_to_PWS_-_CEMs_Access_and_Security_Check_Process.pdf PDF
T53_Attachment_D-2_to_PWS_-_DIDS_-_ALL.pdf PDF
T53_APPENDIX_A_-_PWS__v8 _30_Apr_15.pdf PDF
T53_APPENDIX_D_-_Vendor_Transportation_Instructions.pdf PDF
T53_Attachment_B_to_PWS_-_Acryonyms.pdf PDF
T53_Attachment_A_to_PWS_-_Technical_Data_v1 _18_Dec_2014.pdf PDF
FA8124-15-R-0005.pdf PDF
T53_Attachment_D_to_PWS_-_CDRLs_DIDs_Summary_30_Apr_15.pdf PDF
T53_APPENDIX_H_-_Pricing_Matrix _10_Jun_2015.pdf PDF
T53_Attachment_F-1_to_PWS_-_SPI__T53_Engine_Can.pdf PDF
T53_Attachment_E_to_PWS_-_CEMs_Access_and_Security_Check_Process.pdf PDF
T53_APPENDIX_F_-_Instructions_to_Offerors _10_Jun_2015.pdf PDF
T53_Attachment_F_to_PWS_-_SPI__T53_Engine.pdf PDF
T53_Attachment_C_to_PWS_-_Government_SubAssemblies.pdf PDF
T53_APPENDIX_B_-_CAV_AF_Government_Property_Management _5_Mar_2014.pdf PDF
T53_APPENDIX_E_-_Signed_Contract_Skills_Letter_25_Feb_2015.pdf PDF
T53_History_as_of_Dec_2014_Time_Remaining.pdf PDF
T53_Attachment_D-1_to_PWS_-_CDRLS_-_ALL.pdf PDF
T53_APPENDIX_G_-_EvaluationFactors _10_Jun_2015.pdf PDF
Questions_3.pdf PDF
T53_APPENDIX_A_-_PWS__v6___20_Mar_15.pdf PDF
Questions_2.pdf PDF
Questions_1.pdf PDF
T53_Attachment_A_to__PWS__-_Technical_Data_v1_18_Dec_2014.docx DOCX document
T53_Attachment_E_to_PWS_-_CEMs_Access_and_Security_Check_Process.pdf PDF
T53_helicopter_engine_can.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 Feb 15

APPENDIX C

SAFETY SPECIFICATION

OVERHAUL OF T53-L-703 GAS TURBINE ENGINE ASSEMBLY

PR NO: FD2030-15-30485

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor shall implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap notification/reporting as defined in paragraph I.B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.

B. Mishap Notification.

1. The contractor shall notify the Air Force Cognizant Engineering Authority (CEA) and Air Force Procuring Contracting Officer (PCO) within one (1) hour of all mishaps or incidents.

A written report of the mishap/incident shall be sent within three calendar days to the CEA and PCO, who will forward it to the Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the PCO.

2. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the PCO and CEA.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements:

Mishap Notification/Reporting Housekeeping

Material Handling Equipment (MHE) Handling, Storage and Use of Flammable/Combustible Liquid Vehicle Operations Tool Control Foreign Object Damage (FOD) Tobacco Use in the Air Force Hazardous Energy Control

Confined Spaces

SECTION II - SAFETY PROGRAM ELEMENTS
Tool Control

File details come from the government source that posted it. Updated .