T53_APPENDIX_C_-_Safety_Specifications _25_Feb_2015.pdf
PDF 16 KB Posted
- Attached to
- T53 Engine Overhaul and Repair
- Solicitation number
- FA8124-15-R-0005
About this file
Appendix C - Safety Specifications
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25 Feb 15
APPENDIX C
SAFETY SPECIFICATION
OVERHAUL OF T53-L-703 GAS TURBINE ENGINE ASSEMBLY
PR NO: FD2030-15-30485
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements. The contractor shall implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1. Mishap notification/reporting as defined in paragraph I.B. below.
2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.
B. Mishap Notification.
1. The contractor shall notify the Air Force Cognizant Engineering Authority (CEA) and Air Force Procuring Contracting Officer (PCO) within one (1) hour of all mishaps or incidents.
A written report of the mishap/incident shall be sent within three calendar days to the CEA and PCO, who will forward it to the Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the PCO.
2. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the PCO and CEA.
C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.
D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.
SECTION II - SAFETY PROGRAM ELEMENTS
The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements:
Mishap Notification/Reporting Housekeeping
Material Handling Equipment (MHE) Handling, Storage and Use of Flammable/Combustible Liquid Vehicle Operations Tool Control Foreign Object Damage (FOD) Tobacco Use in the Air Force Hazardous Energy Control
Confined Spaces
| SECTION II - SAFETY PROGRAM ELEMENTS |
| Tool Control |
File details come from the government source that posted it. Updated .