PWS 31 Mar 11.pdf

PDF 18 KB Posted

Attached to
Communication, Detection, and Coherent Radiation Equipment
Solicitation number
FA8102-10-R-0011
Issued by

About this file

Performance Work Statement

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Interim Contractor Support (ICS) and Training for the

Air Force Instrument Landing System (ILS) Modernization Program

31 March 2011

Prepared by:

OC-ALC/GKAAA

Tinker AFB, OK 73145

PWS for ICS of the AF ILS Modernization Program

31 Mar 11 2

1. Description of Services

This Performance Work Statement (PWS) defines the effort required to provide Interim Contractor Support (ICS) and Training for the sustainment of the modernized AN/GRN-29 Instrument Landing Systems (ILS). Through a comprehensive logistics support plan, the Contractor is to establish and implement an ICS and Training program. The Contractor shall provide all qualified personnel, materials, management, technical services, equipment and contractor facilities necessary to support the requirements of this PWS.

1.1. Interim Contractor Support

The ICS program shall provide the Government with a full range of depot support services throughout the contract. For those components and software installed to support this modernization effort, the Contractor shall provide the level of support required to sustain the required operational availability of 98% for the modernized ILS. As part of this support, the Contractor shall provide technical troubleshooting and operational support services which the Government can utilize 24 hours a day, 7 days a week with Contractor responses provided no later than the next business day. The Contractor shall maintain a record of this activity and make it available for Government observation.

1.1.1. Hardware Support

As a part of the ICS program, the Contractor shall develop and implement a plan to supply required hardware for the modernized ILS. The supply plan shall allow for submission of parts requisitions by the Government 24 hours a day, 7 days a week and Contractor shipment of requested items within 24 hours of requisition. The Contractor shall maintain a record of this activity and make it available for Government observation.

1.1.2. System Software Support

As part of the ICS program, the Contractor shall develop and implement a plan to maintain and update the modernized ILS software. Through this plan, the Contractor shall revise the software as required to resolve issues as may be discovered after fielding the ILS modernization. This shall include issues that are discovered by the Government as well as those discovered by the Contractor. All changes shall be properly documented through the configuration management plan and new versions of the software distributed per Government direction.

1.2 Training

The Contractor shall develop and conduct an initial training program designed to instruct AF technical personnel on the operation, alignment, inspection, troubleshooting and basic repair techniques applicable to the modernized ILS focusing especially any new capabilities. The Contractor shall provide all training documentation, materials, facilities, equipment and supplies required to conduct 2 classes of no more than 10 students per class. The Contractor shall conduct the first class prior to First Article installations and the 2nd class prior to the first production installation.

31 Mar 11 3

The Government may request follow on training classes meeting these same requirements. The training program shall allow all participants to maintain the system at a 98% Ao.

CDRL A023: Training Material

1.3. Mission Essential Services

The contractor shall prepare for the continuation of essential DoD services during crisis In Accordance With (IAW) Depart of Defense Instruction (DoDI) 3020.37. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours. IAW DoDI 3020.37, the Contractor shall develop a contingency plan and furnish a copy to the PCO for those tasks identified as essential to provide reasonable assurance of continuation during crisis conditions.

1.4. Security

The Contractor shall perform all activities required to meet the security requirements of DOD facilities they are required to access during the performance of this contract. The Contractor, when working in DOD facilities, shall wear identification badges on their outer garment in the chest area and abide by all rules, regulation, etc. of the DOD facility.

1.5. Period of Performance

The period of performance for this PWS shall begin with the initial training class for the ILS modernization and continue through the end of the contract.

2. Service Summary

Contractor performance shall be measured and assessed, using the Performance Objectives listed in the Service Summary Table. The Contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures. The absence of any contract requirement from the Service Summary shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract.

The Contractor shall address all deficiencies noted by the Government while performing the surveillance of this service delivery. The Contractor shall prepare and maintain a numbered list of deficiencies, the root cause(s) for the deficiencies and changes they will implement to prevent the mishap in the future. The full list shall be submitted quarterly to the Government.

31 Mar 11 4

Service Summary Table

Performance Objectives

PWS

Paragraph Performance Threshold

Method of Surveillance

For those components and software installed to support this modernization effort, the Contractor shall provide the level of support required to sustain the required operational availability of 98% for the modernized ILS

1.1 Each modernized ILS meets

98% Ao through the life of this contract.

Periodic inspection of Ao for all delivered systems

The Contractor shall provide technical troubleshooting and operational support services which the Government can utilize 24 hours a day, 7 days a week with Contractor responses provided no later than the next business day

1.1 No more than 1 incident of

support services not being available in a month. No more than 1 incident per month of Contractor responses later than the next business day and not more than 24 hours late.

Periodic inspection of the Contractor records

Submission of parts requisitions by the Government 24 hours a day, 7 days a week and Contractor shipment of requested items within 24 hours of requisition

1.1.1 No more than 1 incident of

requisition support not being available in a month.

No more than 1 incident per month of late shipment and not more than 24 hours late.

Periodic inspection of the Contractor records

The training program shall allow all participants to maintain the system at a 98% Ao.

1.2 Each modernized ILS meets

98% Ao through the life of this contract.

Periodic inspection of Ao for all delivered systems

3. Government Furnished Property

The ICS and Training program shall not utilize Government resources (manpower, Government furnished equipment/material, facilities, etc.) as support for the program.

File details come from the government source that posted it. Updated .