1. PURPOSE: This document defines the requirements for an ILS Modernization Pre-Installation Survey. This site survey shall be performed by the Contractor to determine if existing ILS meet design standards currently required of the system.
2. AFFECTED SYSTEM(S): AN/GRN-29 Instrument Landing System (ILS) which consists of the AN/GRN- 30 Localizer Station, AN/GRN-31 Glideslope Station, shelter, remote control and status indicator and interlock control unit subsystems.
3. BACKGROUND
3.1. The 38th
Engineering Installation Group (EIG) initially installed most if not all of the ILS using standard, USAF drawings that included the foundation. All ILS should still comply with these drawings as well as other military standards and the ILS Technical Orders (TOs).
3.2. The modification program will not directly fund site rework that brings them back up to the standard level initially provided. Therefore, this pre-installation survey shall be used to identify potential site issues, so that they can be worked prior to scheduled installation of the ILS Modernization.
4. SURVEY DATA COLLECTION:
4.1. Utilizing base support, inspect each ILS utilizing the ILS Modernization Pre-Installation Survey Checklist.
Inspection points may be examined and verified through Base Civil Engineering (BCE) records for the ILS or visually inspected at each location. The Contractor is to visually inspect only that which is visible or readily accessible. The Contractor shall coordinate access to the ILS and BCE records as well as removal of any components during the inspection with personnel from the base.
4.2. The Contractor shall complete the attached ILS Modernization Pre-Installation Survey Checklist twice for each ILS, once for the Localizer Shelter and once for the Glideslope Shelter. This shall include completing all general information at the top of the checklist for each shelter of each system and then marking either the Pass, Fail or Unable to Verify block for each inspection point. If an inspection point is not applicable to a particular type of shelter, place N/A in the Pass block. For each inspection point marked as Unable to Verify, note why in the comments section. For each inspection point marked as Fail, note in the comments section or a separate piece of paper clear details on the discrepancy, recommended actions to resolve discrepancy, specific location(s) of the discrepancy within the ILS and indicate whether the discrepancy will have a direct impact on this modernization effort. To help convey the discrepancy, drawings, military standards, TOs, pictures, etc.
can be redlined and/or marked-up and attached to the checklist. If these are provided, each shall be marked with the military organization, location (base) and runway designation.
4.3. The Contractor may add inspection points to the survey checklist as required to help identify other discrepancies that will have a direct impact on the modernization effort. However, these inspection points must be supported by existing drawings, military standards or TOs applicable to the ILS.
5. ATTACHMENTS: The attachments to this document are shown below. If the Contractor does not have access to any of the other referenced documents, the Government will provide access upon request.
Attachment 1 - Figure 1, Circuit Breaker Designations Attachment 2 - Standard Drawing JHFHS01078AD226, Localizer Design Criteria, Shelter Right Attachment 3 - Standard Drawing JHFHS01079AD226, Localizer Design Criteria, Shelter Left Attachment 4 - Standard Drawing JHFHS01088AD226, Glide Slope Design Criteria, Shelter Left Attachment 5 - Standard Drawing JHFHS01089AD226, Glide Slope Design Criteria, Shelter Right Attachment 6 - ILS Modernization Pre-Installation Survey Checklist
6. ATCALS SSM POC: Mr Mark Burke, OC-ALC/GKAAB, email: mark.burke@tinker.af.mil, DSN: 339-7134, Commercial Phone: 405-739-7134 or Mr Tom Neel, OC-ALC/GKAAB, email: thomas.neel@tinker.af.mil, DSN: 339-9562, Commercial Phone: 405-739-9562.
mailto:mark.burke@tinker.af.mil� mailto:thomas.neel@tinker.af.mil�
ILS Modernization Pre-Installation Survey
Attachment 1
Figure 1: Circuit Breaker Designations
Thomas.Neel Typewritten Text
SHEET 5
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
SHEET 6
Thomas.Neel Line
Thomas.Neel Line
Thomas.Neel Typewritten Text
ATTACHMENT 2
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Rectangle
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
ATTACHMENT 2
Line
Thomas.Neel Typewritten Text 770002 through 770121
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Rectangle
Thomas.Neel Line
Thomas.Neel Typewritten Text
ATTACHMENT 2
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
SHEET 5
Thomas.Neel Line
Thomas.Neel Line
Thomas.Neel Typewritten Text
SHEET 6
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 3
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 3
Thomas.Neel Typewritten Text
ATTACHMENT 3
ATTACHMENT 3
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 3
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 3
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 4
Thomas.Neel Typewritten Text
ATTACHMENT 4
Thomas.Neel Typewritten Text
Thomas.Neel Typewritten Text
ATTACHMENT 4
Thomas.Neel Typewritten Text
ATTACHMENT 4
Thomas.Neel Typewritten Text
ATTACHMENT 4
Thomas.Neel Typewritten Text
ATTACHMENT 4
ATTACHMENT 4
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
ATTACHMENT 5
Thomas.Neel Typewritten Text
| Binder1.pdf |
| ILS Modernization Pre-installation Survey 5 Nov 2010 |
| 1078AD |
| 01078ad01 Model (1).pdf |
| 01078ad02 Model (1).pdf |
| 01078ad03 Model (1).pdf |
| 01078ad04 Model (1).pdf |
| 01078ad05 Model (1).pdf |
| 01078ad06 Model (1).pdf |
| 1079AD |
| 01079ad01m.pdf |
| 01079ad02m.pdf |
| 01079ad03m.pdf |
| 01079ad04m.pdf |
| 01079ad05 m.pdf |
| 01079ad06m.pdf |
| 01079ad07m.pdf |
| 01088AD |
| 01088AD01.pdf |
| 01088AD02.pdf |
| 01088AD03.pdf |
| 01088AD04.pdf |
| 01088AD05.pdf |
| 01088AD06.pdf |
| 01088AD07.pdf |
| 01089AD |
| 01089AD01.pdf |
| 01089AD02.pdf |
| 01089AD03.pdf |
| 01089AD04.pdf |
| 01089AD05.pdf |
| 01089AD06.pdf |
| 01089AD07.pdf |
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .