Attachment 6 - ILS Modernization Pre-installation Survey Checklist

Military Organization: Base POC Name & Phone Number:

Localizer Serial No. & Configuration (SF, DF): OR Glideslope Serial No. & Configuration (CE, NR):

Inspection POC Name & Phone Number: Localizer OR Glide Slope on Runway Left or Right Side:

No. Yes No Unable to

Verify Inspection Points Comments

1.1

Is an Earth Electrode Subsystem (EES) IAW MIL-STD-188-124 installed? This may be an Equipotentail Ground Plane underneath the facility or a Ring Ground System around the facility.

1.2 EES resistances less than 10 ohms? Was "fall-of-potential" measurement method used?

2.1 Are metal structures within 6 feet of the outside perimeter connected to the EES?

2.2 If other EES systems are within 20 feet of the ILS shelter, are they integrated into the ILS EES?

2.3 If other EES systems within 200 feet of the ILS shelter, are they connected to the ILS EES by a minimal two cables?

2.4 Are all exposed mechanical connections coated with a corrosion preventive or sealant?

2.5 Are the bend radius of the connection risers greater than 8-inches?

2.6 Are the bend angles of grounding and lightning connection risers greater than 90 degrees?

2.7 Are all EES conductors that are run through metal conduit bonded to that conduit?

Location (Base):

Runway Designator:

Date of Inspection:

1.0 Inspect the records. Reference BCE records for ILS facilities grounding:

2.0 Inspect the Earth Electrode Subsystem (EES). Reference Mil-Std 188-124:

No. Yes No Unable to

Verify Inspection Points Comments

2.8 Are all EES conductors bonded at both ends?

2.9 Are all metal pipes, conducts, and cables entering the facility connected to the EES?

2.10 Are cable entry plates at the facility connected directly to the EES with a minimal 1/0 AWG, stranded, cable?

2.11 Are metal cable raceways and trays bonded to each other and to the EES?

2.12 Are all external enclosures for power, signal or grounding connected to the EES via a grounding conductor attached to an external ground stud?

2.13 Are connections made to the EES with a minimum of 6 AWG solid or 2 AWG stranded copper wire?

3.1

Are there air terminals (lightning rods) protecting the facility?

Glide Slope facility will be protected by a lightning rod on the GS antenna tower. Localizer Array will not have dedicated lightning protection rods (the lack of is mitigated by the buried ring ground around the array). Localizer shelter may have lightning rod installed on or adjacent to shelter - guidance pending in ATCALS Facility TO).

3.2 Are there a minimum of two down conductors for the lightning protection system?

3.3 Are the conductors at least 1/0 AWG? (If the conductors are stranded, is each strand in the conductor greater than 14

AWG?)

3.0 Inspect the Lightning Protection Subsystem. Reference Mil-Std 188-124:

No. Yes No Unable to

Verify Inspection Points Comments

3.4 Do all conductors have a bend radius greater than 8-inches and a bend angle greater than 90 degrees?

3.5 Do the down conductors follow a continuous path (no open cables) from air terminal to EES?

3.6 Is there a minimum separation of 6-feet between the lightning down conductors and exposed power and signal cables?

3.7

Are all accessible bonds made by high compression UL (Underwriters Laboratory) approved clamping devices? UL approved devices will have a UL stamp, sticker, or plate. UL devices can be discerned by robust design.

3.8 Are the external generator fuel tanks bonded directly to the EES by a minimal 2 AWG stranded wire?

3.9 Are the glideslope tower down conductors bonded to the base of each tower leg?

3.10 Are conductors that pass through foundations or footings installed in plastic or non-metallic conduit?

3.11 Are all exterior nonstructural metal elements (tower hand rails, ladders, stairways, etc) electrically connected to each other and the glideslope tower structural elements? (No open circuits)

3.12 Are all exposed and underground power lines protected by UL approved lightning arrestors at the facility? (JOSLYN Surge protection)

4.1 Are all metallic structural members electrically continuous and connected to the EES ground system?

4.0 Inspect the Fault Protection Subsystem. Reference Mil-Std 188-124:

No. Yes No Unable to

Verify Inspection Points Comments

4.2 Are all metallic piping, tubing, and conduit electrically continuous and connected, either directly or indirectly, to the ground system?

4.3 Are all electrical support structures (boxes, enclosures, stands, etc) electrically continuous and connected, either directly or indirectly, to the ground system?

4.4 Are all power filters bonded directly to the equipment enclosure or case?

4.5 Are power outlets in equipment cabinets used only to power internal and not external equipment other than for maintenance and testing?

4.6 Are all power carrying conductors in the power panels (including the neutral) copper?

4.7 Are IEEE standard power surge protectors installed? If so, are the power surge protectors installed as close as practical (within 12 inches) to the service disconnect?

4.8 Was the grounding installed by the TCTO 31R4-2-GRN29- 527? (JOSLYN Surge Protection)

4.9 Are all the cables used for connection to any power surge protection free of loops, sharp bends (greater then 90 degrees), kinks, and deep cuts?

5.1 Are all removable connections that are able to be inspected tight and coated with corrosion preventive or sealant?

5.2 Are all welded or brazed bonds coated with a corrosion preventive or sealant?

5.0 Inspection of Grounding and Bonding Elements. Reference Mil-Std 188-124:

No. Yes No Unable to

Verify Inspection Points Comments

5.3

Are the grounding conductors connected directly to the equipment cabinet via a ground stud that is peripherally welded to the cabinet metal and does not penetrate the cabinet?

5.4 Are all bonding connections appropriately fastened in such a way as they do not use C-clamps, spring clamps, or self-tapping screws?

6.1 Do all cable connector shields have a metallic contact to provide a path from the shield to the equipment cabinet surfaces?

6.2 Are the shield-to-ground connections not greater than 1-inch from the break-away (connector) location?

6.3 Are star washers used for bonding and mating purposes?

6.4 Are sheet metal or self-tapping screws used as bonding fasteners?

6.5 Are power and signal cables and wires routed as to ensure maximum possible separation?

7.1 Are all the high frequency equipment cabinets bonded correctly together?

7.2 Are the conductor bend radii greater than 8-inches and the conductor bend angles greater than 90 degrees?

7.3 Are the signal ground conductors connected directly to the EES and not to a power panel ground buss?

6.0 Inspection of Cable, Cabinet, and Equipment Shielding. Reference Mil-Std 188-124:

7.0 Inspection of the Signal Reference Subsystem. Reference Mil-Std 188-124:

8.0 Facility, General. Reference Standard Drawings per below:

For Localizer Inspection, Reference Standard Drawing JHFHS01078AD226 (RWY Right Side) or JHFHS01079AD226 (RWY Left Side) For Glide Slope Inspection, Reference Standard Drawing JHFHS01088AD226 (RWY Left Side) or JHFHS01089AD226 (RWY Right Side)

No. Yes No Unable to

Verify Inspection Points Comments

8.1 Are there any externally non-standard mounted fixtures to the shelter (there should be no fixtures other than the ECU or possibly fiber optic modem all weather enclosure).

8.2 Does shelter foundation meet the design layout of the Standard Drawing? Note any additions or out of place items not listed on the Standard Drawings in the Comments section.

8.3

Does an all-weather access road and turn-around at the equipment shelter site exist as shown on Standard Drawing?

Note: Variation may exist in accordance with Standard Drawing.

8.4 Inspect that the equipment shelter will not flood and that proper drainage from the shelter exists. The final elevation of the equipment shelter foundation is not critical, however this final elevation must assure that the shelter will not flood.

8.5 Are shelter foundation cable vault covers provided as depicted on the Standard Drawing?

8.6

Does power/telephone pedestal with power termination box and telephone termination box exist as depicted on the Standard Drawing? Note what type of box is present (Wood Cement etc...).

8.7 Is the power/telephone pedestal of frangible construct?

8.8 Does conduit from power/telephone pedestal to cable vault as shown on the Standard Drawing exist? Two conduit runs are required, one for power and one for communication lines.

Power and Signal cannot be in one conduit.

No. Yes No Unable to

Verify Inspection Points Comments

8.9 Does shelter interior have any non-standard (ie: equipment not related to the localizer station) fixtures mounted to the shelter interior ceiling, walls, or floor (there should none).

8.10 Inspect overall integrity of shelter: Does it leak? Are EMI seals compromised? Is shelter properly secured to foundation? Does shelter have physical damage? Etc.

9.1 What is the communications method to the tower? (Fiber, twisted pair, RF link?).

9.2 To what specifications were existing communications methods in 9.1 designed?

9.3 Note the condition of the communication connection to the tower. Example: Poor, Fair, Good, Excellent

*Notate location of communication terminals (External or Internal)

9.0 Inspect Communications Infrastructure

Checklist (3)