Fixed ILS RMM Mod Questions.docx
DOCX document 15 KB Posted
- Solicitation number
- FA8102-10-R-0011
About this file
Additional Responses to Industry Questions.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document
| Paragraph |
| Page |
| Question/Comment |
| USG Response |
| SOW |
| 1.7.4.3 |
| 11 |
| Does the Provisioning part list breakdown to the depot component level? |
| Yes. see |
CDRL A020
| PWS |
| 1.1 |
| 2 |
| Is potential travel to support troubleshooting and operational support cost covered in 0004 of the contract? Contract item 0004, Page 11 of 54 of contract references travel. |
| It is anticipated the Travel CLIN will be used to support the installation of the ILS to include any applicable site surveys. |
| SOW |
| 1.6.2 |
| 6 |
| ILS Modernization Kits |
There is no remote control defined to be provided with the designated kits. Is the USG providing this or will there be a separate CLIN ?
The system is required to have remote capability, however, the remote control unit is not a part of this effort.
| SOW |
| 1.6.2.2 |
| 6 |
| Production Kits |
“Acceptance by the Government shall occur after successful installation and flight check by the Contractor.”
Is this flight Inspection in support of an FAA flight inspection or a separate commercial flight Inspection? How is it determined that the flight inspection is successful?
Yes flight inspection will be performed by FAA. AFMAN 11-225 provides information of successful flight inspection criteria.
| SOW |
| 1.6.4.2 |
| 7 |
| Production Installation |
“After each production installation, the Contractor shall perform a checkout of the system to ensure that it is operating properly including a flight check.”
Is this flight Inspection in support of an FAA flight inspection or a separate commercial flight Inspection? How is it determined that the flight inspection is successful?
Yes, the flight inspection will be performed by FAA. FAA will perform checks IAW AFMAN 11-225 (also known as FAA Order 8200.1B), Section 217 and will report results to installation team and on-site government personnel.
| SOW |
| 1.6.4.2 |
| 7 |
| Please confirm who is bearing the cost of the flight inspection aircraft, and crew. |
| USAF |
| Perf Spec, |
| Para 3.5 IF16. |
| Page 12 |
| Is the Government requiring the Contractor to provide a power conditioner for the ATC equipment? If so, will the Government provide the specifications requirements for this conditioning? |
The USG Response, ”Yes a power conditioner is expected. However the specific requirements will be determined during contractor site surveys.” Is unclear. Is the USG also requiring site visits as deliverable line item? If so, when would these site visits occur?
Yes, the contractor will be performing the visits. Site surveys should be captured in the price of the equipment and will be scheduled IAW specific locations placed on applicable delivery orders.
| SOW |
| 1.7.4.3 |
| 11 |
| CDRL A019 Provisioning parts List is referenced, however the DID and CDRL address only the supplemental data, i.e., drawings. The Data Item for the Provisioning Parts List defining level of detail and required fields appears to be missing. |
| See CDRL 0020 |
includes DI-ILSS -80134A
| SOW |
| 1.7.4.5 |
| 11 |
| Re-procurement Data Package- Is the USG going to provide a CLIN for Reprocurement Data Package? |
| There is a Data CLIN, however it is Not Separately Priced from the equipment. |
| SOW |
| 1.7.4.7 |
| 12 |
| Is it appropriate to assume the USAF technical level of competency is in accordance with Journeyman Level 3D156? |
| Yes |
| RFP |
| M 1.1 to 2.5 |
| 51-53 |
| It is stated that “The ability to exceed Threshold requirement is anticipated and encouraged.” Please elaborate on how exceeding requirements will be evaluated in light of the statements in section M1.1 “Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability” and M2.5 “Acceptable” is the highest rating criteria which is defined as “The proposal meets specified minimum requirements necessary for acceptable contract performance.” |
| RFP has been rewritten to exclude this statement. |
| Performance Spec (Doc 200948528) |
| 3.2 |
| 7 |
| It is stated that “The ability to exceed Threshold requirement is anticipated and encouraged.” Please elaborate on how exceeding requirements will be evaluated in light of the statements in section M1.1 “Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability” and M2.5 “Acceptable” is the highest rating criteria which is defined as “The proposal meets specified minimum requirements necessary for acceptable contract performance.” |
| Performance Specification has been rewritten to exclude this statement. |
| Performance Spec (Doc 200948528) |
| 3.4 |
| 8-18 |
| MRS-2 Fault Isolation- The requirement states : |
“The equipment shall be provided with sufficient instructions or diagnostics tools to troubleshoot the equipment down to specific LRUs with a 95% or better confidence to either that LRU or next higher assembly.”
As stated, this requirement can be met with no diagnostic tools as the “next higher assembly” is likely the entire cabinet in most modern ILS design. Such approach would not be consistent with the customer’s expectation. Suggest rewording to reflect industry standard approach of “98 percent of all detectable faults to an ambiguity group of 3 LRUs” and “95 percent of all detectable faults to an ambiguity group of 1 LRUs” The Government will consider using the recommended Fault Isolation provided validation occurs that substantiates the Industry Standard identified in the question.
| Performance Spec (Doc 200948528) |
| 3.11.1 |
| FCR-17 |
| There are numerous ILS system related parameters and controls listed under the requirements for the flight check radio. It is our understanding that the flight check radio system is to provide communication between a remotely positioned technician and an on-site flight check aircraft. The ability for the remotely positioned technician to control the ILS is through the remote maintenance monitoring system. Please confirm this understanding. |
| Your understanding of this statement is correct. |
SOW
1.1 / Spec 2
The blanket inclusion of numerous applicable documents as well as inclusion of “any applicable supplements to those documents as well as other documents specifically called out within them” with no specific callout from the SOW or Specification, brings undue ambiguity and risk to the program for both the USG and contractor.
It would be prudent to specify explicitly what is to be followed in the body of the spec/sow and in the applicable documents introduction state “The documents listed in this section are considered reference unless listed specifically in subsequent sections” as done in other USAF solicitations.
The documents in the SOW (Para 1.1) are few in number and shall be followed in their entirety. The Performance Spec (Spec 2) references many documents that are already identified as Reference documents.