SECTION 09910 - PAINTING
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes surface preparation and field painting of exposed exterior items and surfaces.
1. Preparation of surfaces to receive finish.
2. Finished Areas: Painting and finishing of all surfaces throughout the exterior of the project, except those items of equipment specified to be painted by other trades, shall receive finishing under this Section, including:
a. General: Ferrous metals, concrete and masonry surfaces where scheduled or noted.
b. Electrical: Items such as non‑finished or prime painted metals and other equipment throughout project.
3. It shall be understood that all exposed surfaces and similar items, shall be painted or finished under work of this Section.
4. Finish surfaces in accordance with "Exterior Paint Schedule" at end of this Section.
B. Work Not Included:
1. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels.
2. Prefinished items include the following factory-finished components:
Review list of prefinished items below. Delete items not in Project; insert additional items to suit Project.
a. Finished mechanical and electrical equipment.
b. Light fixtures.
3. Concealed surfaces include walls or ceilings in the following generally inaccessible spaces:
Review list of spaces below that contain concealed surfaces not usually painted. Delete spaces not in Project; insert additional spaces to suit Project.
a. Furred areas.
b. Ceiling plenums.
c. Pipe spaces.
4. Finished metal surfaces include the following:
Review list of finished metals below. Delete metal surfaces not in Project; insert additional metal surfaces to suit Project.
a. Stainless steel.
b. Chromium plate.
5. Operating parts include moving parts of operating equipment and the following:
Review list of operating parts below. Delete parts not in Project; insert additional parts to suit Project.
a. Valve and damper operators.
b. Linkages.
c. Sensing devices.
d. Motor and fan shafts.
6. Labels: Do not paint over UL, FMG, or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.
Retain paragraph below if alternates are specified in Division 1 Section for work in this Section.
If allowances or unit prices apply to work of this Section, insert brief paragraphs here to alert Contractor and reference appropriate Division 1 Section for specific details.
1.3 DEFINITIONS
Standard terms used by the coatings industry are defined in ASTM D 16.
A. General: Standard coating terms defined in ASTM D 16-96a apply to this Section.
Delete gloss ranges below not required for Project. Standard gloss ranges were developed by the National Paint and Coatings Association.
1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter.
2. Eggshell refers to low-sheen finish with a gloss range between 20 and 35 when measured at a 60-degree meter.
3. Satin refers to low-sheen finish with a gloss range between 15 and 35 when measured at a 60-degree meter.
4. Semi-gloss refers to medium-sheen finish with a gloss range between 35 and 70 when measured at a 60-degree meter.
5. Full gloss refers to high-sheen finish with a gloss range more than 70 when measured at a 60-degree meter.
1.4 SUBMITTALS
Revise paragraph and subparagraphs below to suit Project and products required.
A. DETAILED WORK PLAN
1. Submit a detailed work plan for government approval (including a building sketch indicating locations) describing details of the applicable plans, methods, procedures, equipment, materials, and chemicals in performance of the work for:
a. Paint removal.
b. Painting.
c. Housekeeping/cleanup.
d. Waste management.
2. Address in the detailed work plan the sequence of work, methods to be used to assure the health and safety of building occupants and visitors to the site, methods of removal to control the lead dust generated by the paint removal, methods to maintain all surfaces free of accumulations of lead, decontamination, containerization of lead-containing waste, and waste disposal.
3. No on-site work may begin until the government approves this plan.
B. Product Data: For each paint system indicated. Include block fillers and primers.
1. Material List: An inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer's catalog number and general classification.
2. Manufacturer's Information: Manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each coating material.
3. Certifications by manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOC’s).
C. Submit sample for government to review.
D. Finish all areas and items in accordance with specifications. Color selected for roofing is Sherwin Williams Exterior Color “Keystone Gray A SW2005”. Contractor shall submit this color to the Contracting Officer for approval.
E. Do not apply additional coats until each completed coat has been inspected and approved.
Division 1 Section "Submittal Procedures" specifies submission of three Samples as the default requirement. Insert number below only if it differs from the number retained or inserted in the Division 1 Section.
Coordinate below with qualification requirements retained in "Quality Assurance" Article.
F. Qualification Data: For firms and persons specified in the “Quality Assurance” Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
1.5 QUALITY ASSURANCE
A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.
Always retain paragraph below. Systems could fail if coats are incompatible.
B. Source Limitations: Obtain block fillers and primers for each coating system from the same manufacturer as the finish coats.
Requirements in paragraph and subparagraphs below can be expensive if not specified carefully. Delete on small projects and on simple projects where such requirements are unreasonable. Retain on large projects and when Applicator must possess special skills or take unusual care in application. Revise to suit Project.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information:
Add other requirements to suit Project.
1. Product name or title of material.
2. Product description (generic classification or binder type).
3. Manufacturer's stock number and date of manufacture.
4. Contents by volume, for pigment and vehicle constituents.
5. Thinning instructions.
6. Application instructions.
7. Color name and number.
8. Handling instructions and precautions
9. VOC content.
B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain storage containers in a clean condition, free of foreign materials and residue.
1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing and application.
Add special requirements for fire protection, heating, ventilation, and other special conditions for on-site storage areas, if necessary.
1.7 ENVIRONMENTAL CONDITIONS
A. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below following maximums:
1. Concrete block: 12 percent.
2. Interior located wood: 15 percent.
B. Ensure surface temperatures or the surrounding air temperature is minimum 40 degrees F before applying finishes. Minimum application temperature for latex paints for interior work is 45 degrees F and 50 degrees F for exterior work. Minimum application temperature for varnish is 65 degrees F.
C. Provide adequate continuous temporary ventilation and sufficient heating facilities to maintain temperatures above 45 degrees F for 24 hours before, during and 48 hours after application of finishes.
D. Provide minimum 20 ‑ 25 foot candles of lighting on surfaces to be finished.
E. Do not apply finishes in areas where dust is being generated.
1.8 PROTECTION
A. Adequately protect other surfaces from paint and damage. Repair damage as a result of inadequate or unsuitable protection.
B. Furnish sufficient drop cloths, shields, and protective equipment to prevent spray droppings from fouling surfaces not being painted and in particular, surfaces within storage and preparation area.
C. Place cotton waste, cloths, and material that may constitute a fire hazard in closed metal containers and remove daily from site.
D. Remove electrical plates, surface hardware, fittings and fastenings, prior to painting operations. These items are to be carefully stored, cleaned, and replaced on completion of work in each area. Do not use solvent to clean hardware that may remove permanent finish.
1.9 EXTRA MATERIALS
A. Furnish extra high-performance coating materials from the same production run as materials applied and in quantities described below. Package coating materials in unopened, factory-sealed containers for storage and identify with labels describing contents.
1. Quantity: Furnish extra coating materials not less than 1 gallon of each material and color applied.
B. Leave on premises where directed by Contracting Officer.
C. Tightly seal containers and clearly label for identification.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design: The paint materials specified in this Specification Section are based on Sherwin‑Williams Co., from the low odor, health care product line. Subject to compliance with requirements, provide the named product or a comparable product by one of the following:
1. PPG Architectural Finishes, Inc., Pittsburgh, PA.
2. ICI, Cleveland, OH.
3. Benjamin Moore & Co., Montvale, NJ.
B. Other paint manufacturer's products will be considered according to requirements of Division 01, and the following requirements:
1. Submit a complete list of proposed material, including manufacturer's name, trade name, data for each product and color charts, and specifically designate by name the "Sherwin-Williams" product that the proposed product will substitute.
2. Submit a paint schedule listing all surfaces and list proposed substitute product.
2.2 MATERIAL
A. Paints: Ready‑mixed, except field catalyzed coatings. Pigments fully ground maintaining a soft paste consistency, capable of readily and uniformly dispersing to a complete homogeneous mixture.
B. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners, potable water, and other materials not specifically indicated, but required to achieve the finishes specified of commercial quality.
C. Application Equipment: Drip cloths, warning signs, and other ancillary accessories required to complete painting work and as recommended for application by paint manufacturer.
D. Paints to have good flowing and brushing properties and be capable of drying or curing free of streaks or sags.
2.3 MIXING
A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft paste consistency, capable of being readily and uniformly dispersed to a homogenous coating; good flow and brushing properties; capable of drying or curing free of streaks or sags.
B. Provide best quality grade of various types of coatings as regularly manufactured by acceptable paint materials manufacturers. Materials not displaying manufacturer's identification as a standard, best-grade product will not be acceptable.
C. Color Pigments: Pure, nonfading, applicable types to suit substrates and service indicated.
D. Mix and prepare painting materials in accordance with manufacturer's directions.
E. Maintain containers used in mixing and application of paint in a clean condition, free of foreign materials and residue.
F. Stir materials before application to produce a mixture of uniform density, and stir as required during application. Do not stir surface film into material. Remove film and, if necessary, strain material before using.
G. Do not thin painting materials unless recommended by manufacturer. When paint thinning is required, comply with manufacturer's printed instructions; use only thinners approved by paint manufacturer.
2.4 GREEN PROCUREMENT
Retain first paragraph below to specify recycled content if required for LEED-NC or LEED-CI Credits MR 4.1 and MR 4.2. Recycled content of gypsum board varies greatly; consult manufacturers before inserting requirement. An alternative method of meeting LEED Credit MR 4.1 and MR 4.2 requirements is to retain requirement in Division 01 Section "Sustainable Design Requirements" that gives Contractor option and responsibility for determining how LEED Credit MR 4.1 and MR 4.2 requirement will be met.
A. Toxicity/IEQ: Comply with applicable regulations regarding toxic and hazardous materials, and as specified. Meet or exceed the VOC and chemical component limits of Green Seal requirements.
1. Exterior and Interior Paint: Comply with GS-11.
B. Submit written verification that identified materials comply with green procurement requirements.
Indicate paint colors in a separate schedule or show location and extent on Drawings. The number of colors used on a project and use of deep-tone colors will affect Project cost. See the Evaluations in Division 9 Section "Painting."
Products listed in succeeding Part 2 articles have been researched and evaluated and are believed to be comparable to products of other manufacturers listed. However, due to differences among manufacturers' individual product formulas, some products may have advantages or disadvantages when compared to similar products of other manufacturers. Base selection of product on coating-performance characteristics required.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions under which the painting will be performed, with Applicator present, for compliance with requirements for paint application. Comply with procedures specified in PDCA P4-94.
1. Do not proceed with paint application until unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry.
2. Start of painting will be construed as Applicator's acceptance of surfaces and conditions within a particular area.
Coordinate primers specified in other Sections with undercoats and finish materials specified in this Section to ensure compatibility of materials. Some finish-coat materials, such as lacquers and epoxies, lift oil and oleoresinous air-dry primers. A long-oil finish coat may crawl and have poor adhesion when used over zinc-dust phenolic or baked primers.
B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.
1. Notify Contracting Officer about anticipated problems when using the materials specified over substrates primed by others.
3.2 PREPARATION
Revise first paragraph and subparagraph below if additional requirements are necessary to suit Project.
A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.
B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove oil and grease before cleaning.
1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.
Always retain first paragraph and subparagraphs below for surface preparation. Proper surface preparation is essential for satisfactory coating performance. If necessary, revise requirements to include special procedures requested by manufacturers or to suit Project.
C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified.
Coordination of shop-applied primers with finish coats is critical. See "Coordination of Work" Paragraph in "Examination" Article. If compatibility problems develop, it may be necessary to provide barrier coats over shop-applied primers or to remove the primer and reprime the substrate.
1. Provide barrier coats over incompatible primers.
Delete subparagraph and associated subparagraphs below if cementitious surfaces are not to be painted, or revise to suit Project.
2. Cementitious Materials: Prepare concrete unit masonry surfaces to be painted. Remove efflorescence, loose mortar, chalk, dust, dirt, grease, oils, mold and mildew.
a. Concrete block and mortar must be cured at least 30 days at 75° F before applying primer.
b. All bug holes, air pockets, chips and other voids are to be filled with patching compound.
c. For new surfaces, use abrasive blast-cleaning methods if recommended by paint manufacturer.
d. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces if moisture content exceeds that permitted in manufacturer's written instructions.
Delete subparagraph below if not required.
Delete subparagraph and associated subparagraphs below if wood surfaces are not to be painted, or revise to suit Project.
3. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off.
a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.
Delete four subparagraphs below if specified in other Sections.
Revise first subparagraph and associated subparagraphs below to suit Project.
4. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with SSPC's (Steel Structures Painting Council’s) recommendations.
Delete subparagraph below if blast cleaning is not required. SSPC-SP 10/NACE No. 2 requires a higher level of preparation than is often justified. Reduce preparation level to SSPC-SP 6/NACE No. 3 if warranted.
a. Structural Steel and Miscellaneous Steel
1) Blast steel surfaces clean as recommended by paint system manufacturer and according to SSPC-SP 6/NACE No. 3 1994.
2) Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.
3) Touch up bare areas and shop-applied prime coats that have been damaged. Wire brush, clean with solvents recommended by paint manufacturer, and touch up with same primer as the shop coat.
Delete first subparagraph below if touchup painting of shop-applied primers will be done by material erector or Installer.
5. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.
D. Material Preparation: Mix and prepare paint materials according to manufacturer's written instructions.
1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.
2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.
3. Use only thinners approved by paint manufacturer and only within recommended limits.
If tinting is not required, delete below. Different tints will show through as topcoat erodes.
3.3 APPLICATION
A. Do not apply any initial coating until the moisture content of surfaces is within limitations recommended by the paint manufacturer.
B. Apply all paints with appropriate type brushes and rollers.
C. Rate of application consistency shall be in accordance with recommendations of manufacturer for the type of surface being painted.
D. Keep brushes and rollers clean, free from contaminants, and suitable for required finish.
E. Comply with manufacturer's recommendations for drying time required between succeeding coats.
F. Each coat shall be slightly darker than preceding coat unless otherwise directed.
G. Sand and dust between coats to achieve required finish. Finish coat shall be smooth, free of brush marks, streaks, laps, pile up of paint, and skipped or missed areas.
H. Cut‑in edges of paint adjoining other materials or colors, clean and sharp with no overlapping.
I. Backprime interior woodwork, which is to receive paint or enamel finish, with enamel undercoater paint.
J. Before painting, remove switch, and coverplates, accessories, and minor hardware, lighting fixtures, and similar minor items or provide ample protection of such items. Upon completion of such space, reinstall removed items.
K. Remove covers and access panels for electrical systems from location and paint separately.
L. Finish prime painted equipment to color selected.
M. All nameplates and data plates that indicate manufacturer, model, size, capacity, codes, or identifying data printed on equipment, shall not be painted; carefully cut‑in.
N. Prime and paint insulated and bare pipes, conduits, boxes, hangers, brackets, collars and supports, except where items are plated or covered with a pre‑finished coating.
O. Replace identification markings on electrical equipment when painted over or spattered with same identification devices furnished by electrical sections, at expense of painting contractor.
P. Paint exposed conduit and electrical equipment occurring in finished areas. Color and texture to match adjacent surfaces.
Q. Paint both sides and edges of plywood backboards for electrical equipment before installing backboards and mounting equipment on them
3.4 CLEAN‑UP
A. Remove all spilled, splashed, or spattered paint promptly from other surfaces and be careful not to mar surface finish of item being cleaned.
B. Touch‑up and restore damaged finish and leave project in first class condition.
C. During progress of work, keep premises free from any unnecessary accumulation of tools, equipment, surplus materials and debris.
D. Upon completion of work remove all ladders, scaffolding and staging, and leave premises neat and clean, to the satisfaction of Contracting Officer.
3.5 PROTECTION
A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Contracting Officer.
B. Provide "Wet Paint" signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work.
1. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1-92.
3.6 EXTERIOR PAINT SCHEDULE
Retain paint system below for a low-luster (eggshell) acrylic finish over exterior concrete unit masonry subject to normal use and moderate environments.
Use schedule below as a guide only. See suggested procedures in "Writing Guide" Article in the Evaluations in Division 9 Section "Painting" for guidance before editing schedule. Below includes examples of paint systems for different exterior substrates. Retain only substrates and paint systems suitable for Project.
A. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Apply primer to the roof of building 418 prior to finish coats but after surface preparation.
1. Full-Gloss, Alkyd-Enamel Finish: 2 finish coats over a rust-inhibitive primer.
a. Primer: Rust-inhibitive metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm).
1) Moore: IronClad Retardo Rust-Inhibitive Paint #163.
2) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer.
3) S-W: Pro Industrial Pro-Cryl Universal Primer B66-310 Series.
b. First and Second Coats: Full-gloss, exterior, alkyd enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 3.0 mils (0.076 mm).
1) Moore: Impervo Enamel #133.
2) PPG: 6-282 Speedhide Interior/Exterior Gloss-Oil Enamel.
3) S-W: Industrial Enamel B-54 Series.
B. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated (galvanized) metal surfaces.
1. Full-Gloss, Alkyd-Enamel Finish: 2 finish coats over a galvanized metal primer.
a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm).
1) Moore: IronClad Galvanized Metal Latex Primer #155.
2) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel.
3) S-W: Galvite Paint B50W3.
b. First and Second Coats: Full-gloss, exterior, alkyd enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm).
1) Moore: Impervo Enamel #133.
2) PPG: 6-282 Speedhide Interior/Exterior Gloss-Oil Enamel.
3) S-W: Industrial Enamel B-54 Series.
3.7 INTERIOR PAINT SCHEDULE - NOT USED
3.8 INTERIOR STAIN FINISH WOODWORK SCHEDULE – NOT USED
Most manufacturers recommend two finish coats over a suitable primer over exterior ferrous metal subject to normal use and moderate environments; however, in some situations, additional coats may be necessary to obtain good coverage.
Retain paint system below for a low-luster (eggshell) acrylic finish over exterior ferrous metal subject to normal use and moderate environments.
END OF SECTION 09912
911th AIRLIFT WING
PAINTING
911TH CIVIL ENGINEERING
PAINT METAL ROOF, BLDG 418
09910 - 10
1100 HERMAN AVE
JLSS 14-0007
CORAOPOLIS, PA 15108