Copyright 2007 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 01813 - GREEN PROCUREMENT REQUIREMENTS
Revise this Section by deleting and inserting text to meet Project-specific requirements.
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
Review the Evaluations and the applicable LEED rating system before editing this Section. Unless otherwise noted, references to LEED are to LEED-NC, Version 2.2, LEED-CI, Version 2.0, and LEED-CS, Version 2.0.
Where practical, terminology used in this Section has been made identical to or at least consistent with terminology used in the LEED rating systems; if questions arise relating to terminology, review the applicable LEED reference guide and the standards referenced by the applicable LEED rating system for possible explanations.
If Project design team does not include a LEED-Accredited Professional, consider engaging a consultant; Credit ID 2 applies if at least one principal participant of Project team is a LEED-Accredited Professional. Note that all LEED credits are optional, so requirements for credits not sought should be deleted.
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
Retain or delete this article in all Sections of Project Manual.
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes general requirements and procedures for procuring materials when EPA designated items included in the Green Procurement Program for Recovered Materials are being obtained for the project.
B. This Project will not be submitted for LEED certification.
C. Related Sections:
1. Division 03 Section “Cast-in-Place Concrete” for fly ash and slag cement.
2. Division 04 Section “Unit Masonry” for clay masonry and concrete masonry units.
3. Division 07 Section “Building Insulation” for recycled content.
4. Division 07 Section “Metal Wall Panels” for recycled content.
5. Division 07 Section “Joint Sealants” for VOC compliance.
6. Division 08 Section “Overhead Coiling Doors” for recycled content.
7. Division 08 Section “Aluminum Windows” for recycled content of windows.
8. Division 08 Section “Glazing” for recycled content.
9. Division 09 Section “Acoustical Panel Ceilings” for ceiling panels and grid.
10. Division 09 Section “Painting” for paints and primers.
11. Division 09 Section “High Performance Coating” for coatings and primers.
12. Division 32 Section “Concrete Paving” for fly ash and slag cement.
13. Division 32 Section “Lawns and Grasses” for mulch recycled content.
D. Other Division 01 through 33 Sections for requirements specific to the work of each of these Sections. Requirements may or may not include reference to Green Procurement.
1.3 DEFINITIONS
A. Chain-of-Custody: Process whereby a product or material is maintained under the physical possession or control during its entire life cycle.
B. Environmentally preferable products: Products and services that have a lesser or reduced effect on the environment in comparison to conventional products and services. Refer to EPA’s Final Guidance on Environmentally Preferable Purchasing for more information http://www.epa.gov/epp/guidance/finalguidancetoc.htm C. LEED: Leadership in Energy & Environmental Design.
First paragraph below is based on "Requirements" and "Potential Technologies & Strategies" paragraphs in LEED-NC and LEED-CI Credit MR-6. LEED requirements say "made from plants" but LEED includes wool as an example.
D. Rapidly Renewable Materials: Materials made from plants that are typically harvested within a 10-year or shorter cycle. Rapidly renewable materials include products made from bamboo, cotton, flax, jute, straw, sunflower seed hulls, vegetable oils, or wool.
First paragraph below applies to LEED-NC and LEED-CS.
E. Regional Materials: Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800km) (800 km)(800 km) of Project site. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.
First two paragraphs below apply to LEED-CI.
F. Regionally Manufactured Materials: Materials that are manufactured within a radius of 500 miles (800km) (800 km)(800 km) (800 km) from Project site. Manufacturing refers to the final assembly of components into the building product that is installed at Project site.
G. Regionally Extracted and Manufactured Materials: Regionally manufactured materials made from raw materials that are extracted, harvested, or recovered within a radius of 500 miles (800km) (800 km)(800 km) (800 km) from Project site.
First paragraph below applies to LEED-NC and LEED-CS.
Note that LEED-NC, LEED-CI, and LEED-CS use the term "pre-consumer" rather than "post-industrial." Also note that when manufacturers and trade associations use the term "post-industrial" it often includes spills, scraps, and damaged and surplus materials that are fed back into the same manufacturing process and that these materials are not considered recycled content by the LEED rating systems.
H. Recycled Content: The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value.
1. "Post-consumer" material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.
2. "Pre-consumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.
Paragraph below applies to LEED-CI.
I. Recycled Content: The percentage by weight of constituents that have been recovered or otherwise diverted from the solid waste stream, either during the manufacturing process (pre-consumer), or after consumer use (post-consumer).
1. Spills and scraps from the original manufacturing process that are combined with other constituents after a minimal amount of reprocessing for use in further production of the same product are not recycled materials.
2. Discarded materials from one manufacturing process that are used as constituents in another manufacturing process are pre-consumer recycled materials.
J. Stewardship: Responsible use and management of resources in support of sustainability.
K. Sustainability: The maintenance of ecosystem components and functions for future generations.
1.4 SUBMITTALS
A. Submit with Division 01 Section “Closeout Procedures” the following:
1. Affirmative Procurement Reporting Form. Submit on form in Appendix A following this Section, or similar form as approved by Contracting Officer.
2. Submit environmental data in accordance with Table 1 of ASTM E 2129 for the following products:
a. Concrete.
b. Concrete masonry units and face brick.
c. Insulation.
d. Metal wall panels.
e. Joint sealers.
f. Overhead coiling doors.
g. Aluminum windows.
h. Acoustical ceiling panels and grid.
i. Paints.
j. Mulch.
1.5 SUBSTITUTIONS
A. Notify Contracting Officer when Contractor is aware of materials, equipment, or products that meet the aesthetic and programmatic intent of Contract Documents, but which are more environmentally responsible than materials, equipment, or products specified or indicated in the Contract Documents.
1. Requirements of Division 01 Section “Submittal Procedures” apply, submit the following for initial review by Contracting Officer:
a. Product data including manufacturer's name, address, and phone number.
b. Description of environmental advantages of proposed substitution over specified product.
1.6 PACKAGING
A. Where Contractor has the option to provide one of the listed products or equal, preference shall be given to products with minimal packaging and easily recyclable packaging as defined in ASTM D 5834.
B. Maximize use of source reduction and recycling procedures outlined in ASTM D 5834.
C. Provide minimum 45 percent post-consumer recycled content and minimum 100 percent recovered fiber content of industrial paperboard in accordance with EPA’s Comprehensive Procurement Guidelines and ASTM D 5663.
D. Provide minimum 10 percent post-consumer recycled content and minimum 10 percent recovered fiber content of carrier board in accordance with EPA’s Comprehensive Procurement Guidelines and ASTM D 5663.
E. Provide minimum 5 percent post-consumer recycled content and minimum 5 percent recovered fiber content of brown papers (e.g., wrapping papers and bags) in accordance with EPA’s Comprehensive Procurement Guidelines and ASTM D 5663.
1.7 ENVIRONMENTALLY PREFERABLE PRODUCTS
A. Provide environmentally preferable products to the greatest extent possible.
1. To the greatest extent possible, provide products and materials that have a lesser or reduced effect on the environment considering raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, and/or disposal of the product.
PART 2 - PRODUCTS
2.1 RECYCLED CONTENT OF MATERIALS
Retain first option in paragraph below if retaining 20 percent; delete if retaining 10 percent.
A. Provide building materials with recycled content such that post-consumer recycled content plus one-half of pre-consumer recycled content constitutes a minimum of 10 percent of cost of materials used for Project.
1. Cost of post-consumer recycled content of an item shall be determined by dividing weight of post-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.
2. Cost of pre-consumer recycled content of an item shall be determined by dividing weight of pre-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.
Furniture may be used toward LEED-NC Credit MR 3.1 through 7 if it is included consistently in calculations for all of them. Plumbing may be included or excluded in calculations for LEED-CI Credits MR 4.1 and 4.2.
3. Do not include furniture, plumbing, mechanical and electrical components, and specialty items and equipment in the calculation.
2.2 LOW-EMITTING MATERIALS
Adhesives and sealants are required in many Specification Sections where, without being specifically mentioned, they may be specified only by the requirement to install products according to manufacturer's written instructions. For this reason, it is probably best to retain first paragraph below.
A. For field applications that are inside the weatherproofing system, use adhesives and sealants that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D:
1. Wood Glues: 30 g/L.
2. Metal to Metal Adhesives: 30 g/L.
3. Adhesives for Porous Materials (Except Wood): 50 g/L.
4. Plastic Foam Adhesives: 50 g/L.
5. Gypsum Board and Panel Adhesives: 50 g/L.
6. Ceramic Tile Adhesives: 65 g/L.
Categories below are taken from LEED rating systems and the standards referenced by them; if clarification is required, see those documents or the reference guides.
7. Multipurpose Construction Adhesives: 70 g/L.
8. Contact Adhesive: 80 g/L.
9. ABS Welding Compounds: 325 g/L.
10. CPVC Welding Compounds: 490 g/L.
11. PVC Welding Compounds: 510 g/L.
12. Adhesive Primer for Plastic: 550 g/L.
First five subparagraphs below apply to LEED-CI.
13. Plastic Cement Welding Compounds: 350 g/L.
14. Sheet Applied Rubber Lining Adhesive: 850 g/L.
15. Aerosol Adhesive, General Purpose Mist Spray: 65 percent by weight.
16. Aerosol Adhesive, General Purpose Web Spray: 55 percent by weight.
17. Special Purpose Aerosol Adhesive (All Types): 70 percent by weight.
18. Other Adhesives: 250 g/L.
19. Architectural Sealants: 250 g/L.
20. Nonmembrane Roof Sealants: 300 g/L.
21. Other Sealants: 420 g/L.
22. Sealant Primers for Nonporous Substrates: 250 g/L.
23. Sealant Primers for Porous Substrates: 775 g/L.
24. Other Sealant Primers: 750 g/L.
If retaining first paragraph below, coordinate with Sections where interior paints and coatings are specified to avoid conflicting requirements in those Sections. Option applies to LEED-CI.
B. For field applications that are inside the weatherproofing system, use paints and coatings that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D and the following chemical restrictions:
Categories below are taken from LEED rating systems and the standards referenced by them; if clarification is required, see those documents or the reference guides.
First nine subparagraphs below apply to LEED-NC and LEED-CS.
1. Flat Paints, Coatings, and Primers: VOC not more than 50 g/L.
2. Nonflat Paints, Coatings, and Primers: VOC not more than 150 g/L.
3. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.
4. Clear Wood Finishes, Varnishes: VOC not more than 350 g/L.
5. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L.
6. Shellacs, Clear: VOC not more than 730 g/L.
7. Shellacs, Pigmented: VOC not more than 550 g/L.
8. Stains: VOC not more than 250 g/L.
Remaining 15 subparagraphs apply to LEED-CI.
9. Flat Interior Topcoat Paints: VOC not more than 50 g/L.
10. Nonflat Interior Topcoat Paints: VOC not more than 150 g/L.
11. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.
12. Primers, Sealers, and Undercoaters: VOC not more than 200 g/L.
13. Zinc-Rich Industrial Maintenance Primers: VOC not more than 340 g/L.
14. Pretreatment Wash Primers: VOC not more than 420 g/L.
15. Aromatic Compounds: Paints and coatings shall not contain more than 1.0 percent by weight total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).
16. Restricted Components: Paints and coatings shall not contain any of the following:
a. Acrolein.
b. Acrylonitrile.
c. Antimony.
d. Benzene.
e. Butyl benzyl phthalate.
f. Cadmium.
g. Di (2-ethylhexyl) phthalate.
h. Di-n-butyl phthalate.
i. Di-n-octyl phthalate.
j. 1,2-dichlorobenzene.
k. Diethyl phthalate.
l. Dimethyl phthalate.
m. Ethylbenzene.
n. Formaldehyde.
o. Hexavalent chromium.
p. Isophorone.
q. Lead.
r. Mercury.
s. Methyl ethyl ketone.
t. Methyl isobutyl ketone.
u. Methylene chloride.
v. Naphthalene.
w. Toluene (methylbenzene).
x. 1,1,1-trichloroethane.
y. Vinyl chloride.
If retaining paragraph below, coordinate with Sections where composite wood products are specified to avoid conflicting requirements in those Sections.
C. Do not use composite wood or agrifiber products or adhesives that contain urea-formaldehyde resin.
PART 3 - EXECUTION
3.1 CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT
First option in first paragraph below applies to LEED-CS; second to LEED-NC and LEED-CI.
A. Comply with SMACNA's "SMACNA IAQ Guideline for Occupied Buildings under Construction."
Coordinate first subparagraph below with Division 01 Section "Temporary Facilities and Controls." Identify air handlers and associated return-air inlets authorized by Owner for use during construction period.
1. If Contracting Officer authorizes use of permanent heating, cooling, and ventilating systems during construction period as specified in Division 01 Section "Temporary Facilities," install filter media having a MERV 8 according to ASHRAE 52.2 at each return-air inlet for the air-handling system used during construction.
2. Replace all air filters immediately prior to occupancy.
B. Comply with one of the following requirements:
Retain one or more of three subparagraphs below. Retain option in paragraph above if retaining more than one subparagraph below. Project's mechanical engineer of record should verify that HVAC system design and equipment indicated are capable of delivering flush-out indicated. Provide HVAC system and equipment operating information necessary to achieve credit. If Project HVAC systems and equipment cannot suit requirement, consider requiring temporary systems and equipment.
1. After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush-out by supplying a total volume of 14,000 cu. ft. (4 300 000 L) of outdoor air per sq. ft. (sq. m) of floor area while maintaining an internal temperature of at least 60 deg F (16 deg C) and a relative humidity no higher than 60 percent.
Indicate operating procedure for each HVAC system and piece of equipment and the operating duration required for flush-out.
2. If occupancy is desired prior to flush-out completion, the space may be occupied following delivery of a minimum of 3,500 cu. ft. (1 070 000 L) of outdoor air per sq. ft. (sq. m) of floor area to the space. Once a space is occupied, it shall be ventilated at a minimum rate of 0.30 cfm per sq. ft. (1.52 L/s per sq. m) of outside air or design minimum outside air rate determined in EQ Prerequisite 1, whichever is greater. During each day of flush-out period, ventilation shall begin a minimum of three hours prior to occupancy and continue during occupancy. These conditions shall be maintained until a total of 14,000 cu. ft./sq. ft. (4 300 000 L/sq. m) of outside air has been delivered to the space.
Indicate operating procedure for each HVAC system and piece of equipment and the operating duration required for flush-out.
3. Air-Quality Testing:
EPA standard referenced in first subparagraph below is available from NTIS by calling (800) 553-6847 with PB90200288 ordering number.
a. Conduct baseline indoor-air-quality testing, after construction ends and prior to occupancy, using testing protocols consistent with EPA's "Compendium of Methods for Determination of Air Pollutants in Indoor Air."
b. Demonstrate that the contaminant maximum concentrations listed below are not exceeded:
Note that it may be necessary to comply with requirements in Credits EQ 4.1, 4.2, 4.3, and 4.4 to comply with the limits specified in first five subparagraphs below.
1) Formaldehyde: 50 ppb.
2) Particulates (PM10): 50 micrograms/cu. m.
3) Total Volatile Organic Compounds (TVOC): 500 micrograms/cu. m.
4) 4-Phenylcyclohexene (4-PH): 6.5 micrograms/cu. m.
5) Carbon Monoxide: 9 ppm and no greater than 2 ppm above outdoor levels.
First subparagraph below is part of LEED credit requirements but creates requirements that are contingent on field conditions that are unknown at time of bid and could influence bids. Also, requirements may result in claims for extra payment and time. Revise to suit office practice.
c. For each sampling point where maximum concentration limits are exceeded, conduct additional flush-out with outside air and retest specific parameters exceeded to indicate that requirements are achieved. Repeat procedure until all requirements are met. When retesting noncomplying building areas, take samples from same locations as in first test.
d. Air-sample testing shall be conducted as follows:
1) All measurements shall be conducted prior to occupancy but during normal occupied hours, and with building ventilation system starting at the normal daily start time and operated at the minimum outside air flow rate for the occupied mode throughout duration of air testing.
2) Building shall have all interior finishes installed including, but not limited to, millwork, doors, paint, carpet, and acoustic tiles. Nonfixed furnishings such as workstations and partitions are encouraged, but not required, to be in place for the testing.
3) Number of sampling locations will vary depending on building size and number of ventilation systems. For each portion of building served by a separate ventilation system, the number of sampling points shall not be less than one per 25,000 sq. ft. (2300 sq. m) or for each contiguous floor area, whichever is larger, and shall include areas with the least ventilation and greatest presumed source strength.
4) Collect air samples between 3 and 6 feet (0.9 and 1.8 m) from the floor to represent breathing zone of occupants, and over a minimum four-hour period.
EPA standard referenced in first subparagraph below is available from NTIS by calling (800) 553-6847 with PB90200288 ordering number.
3.2 SCHEDULE
A. This Article identifies materials to be obtained as part of Green Procurement Program. References may not exist in individual specification Sections in Divisions 02 through 33. Refer to various Sections for reference and material specification requirements.
B. Concrete:
1. Fly Ash: Recycled Content - Minimum 20 percent pre-consumer recycled content.
2. Slag Cement: Recycled Content - Minimum 20 percent pre-consumer recycled content.
C. Masonry:
1. Clay Masonry Units: Recycled Content - Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at contractor's option.
2. Concrete Masonry Units: Recycled Content - Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at contractor's option.
D. Insulation:
1. Plastic Rigid Foam - Polyisocyanurate, Polyurethane, and Polystyrene: Recycled content - Minimum 9 percent total recycled content.
E. Metal Wall Panels: Recycled Content - Sum of post-consumer recycled aluminum content plus pre-consumer content constitutes at least 50 percent minimum.
F. Joint Sealants: Toxicity/IEQ: Comply with applicable regulations regarding toxic and hazardous materials, and as specified.
G. Overhead Coiling Door Curtains: Recycled Content - 25 percent minimum total.
H. Aluminum Windows: Recycled Content:
1. Aluminum: Constitutes at least 25 percent minimum.
2. Glass: Constitutes at least 15 percent minimum.
I. Glazing: Recycled Content - 15 percent minimum total.
J. Acoustical Ceiling Panels:
1. Cellulose Base of Acoustical Panels: Recycled Content - Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at contractor's option.
2. Acoustical Ceiling Grid: Recycled Content - Minimum total recycled content of at least 30 percent with post-consumer content approximately 23 percent and pre-consumer content approximately 7 percent.
3. Toxicity/IEQ: Coating or panel based anti-microbial treatment to inhibit growth of mold and mildew:
a. Coating-Based Antimicrobial Treatment: Provide acoustical panels with face and back surfaces coated with antimicrobial treatment; and showing no mold or mildew growth when tested in accordance with ASTM D3273.
b. Panel-Based Antimicrobial Treatment: Provide acoustical panels manufactured with antimicrobial treatment in the panels.
K. Paints and Primers:
1. Toxicity/IEQ: Comply with applicable regulations regarding toxic and hazardous materials, and as specified. Paints must meet or exceed the VOC and chemical component limits of Green Seal requirements.
a. Interior and Exterior Paint: Comply with GS-11.
L. High Performance Coatings:
1. Toxicity/IEQ: Comply with applicable regulations regarding toxic and hazardous materials, and as specified. Paints and coatings must meet or exceed the VOC and chemical component limits of Green Seal requirements.
a. Interior High Performance Coatings: Comply with GS-11.
M. Landscaping Mulch:
1. Paper-Based Hydraulic Mulch: 100 percent minimum post-consumer recycled content.
2. Wood-Based Hydraulic Mulch: 100 percent minimum post-consumer recycled content.
END OF SECTION 01813
911th AIRLIFT WING
GREEN PROCUREMENT REQUIREMENTS
911TH CIVIL ENGINEERING
PAINT METAL ROOF, BLDG 418
01813 - 1
1100 HERMAN AVE
JLSS 14-0007
CORAOPOLIS, PA 15108
File details come from the government source that posted it. Updated .