SECTION J ATTACHMENT 02D STANDARDIZED TECHNICAL PROPOSAL FORMAT FOR TEST PROJECT
View the file
Other files for this federal contract opportunity
Show all 50
Air Force Multiple-Award Construction IDIQ, Germany has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standardized Technical Proposal (STP) Format for Test Project (24 JULY 2009)
| A: PRELIMINARY NOTES |
| PROJECT #:VGXA 08-1522 |
TITLE: Replace Facility
BUILDING #:194
LOCATION: Sembach Annex
| B: TIME SCHEDULE |
| PERFORMANCE PERIOD |
| Calendar Days: |
LATEST END DATE:
Mar 10
EXCLUSION PERIOD:
No
PHASES:
N/A
| C: STATEMENT OF WORK (SOW) |
| Contractor shall provide SOW based on the Government provided Statement of Need (SON) |
| Yes FORMCHECKBOX |
No FORMCHECKBOX
| D: TECHNICAL DESCRIPTION |
| 1. UNIT PRICE BOOK (UPB) DESCRIPTION |
a. NEW WORK
b. REPAIR/OTHER
2. LUMP-SUM ORDERING PROCEDURE (LSOP)
a. NEW WORK
b. REPAIR/OTHER Yes FORMCHECKBOX
Yes FORMCHECKBOX
| E: QUALITY CONTROL |
| 1. SPECIFIC TASK ORDER QUALITY CONTROL, ISO 9001-2000 |
2. ABATEMENT PLAN FOR CONTAMINATED MATERIAL
3. OTHER SPECIAL CONSTRAINTS
Yes FORMCHECKBOX
| F: CURRENT REGULATIONS |
| 1. DIN STANDARD FOR THIS SPECIFIC TASK ORDER |
2. OTHER REGULATIONS
Yes FORMCHECKBOX
G: ATTACHMENT ONE
[Project Info. Sheet Provided by requiring activity - Attach to Technical Proposal ]
1. Magnitude (select one value only)
2. STATUTORY COST LIMITATION: The new work portion of this project is estimated to be below the current valid statutory cost limitation of $ 750,000.00
3. Liquidated damages are requested. The value is ATTACHED. MANDATORY OVER $550,000.00
4. WORK HOURS
Days
Weekend
US / German Holidays
5. RESTRICTED AREAS
6. GOVERNMENT FURNISHED PROPERTY
7. DIGGING PERMIT: A digging permit (AF Form 103) is required. The contractor shall obtain the required form from the Ramstein or Spangdahlem Engineering Office.
8. WELDING PERMIT: A welding permit is required. The contractor will obtain the form at the Ramstein or Spangdahlem Fire Protection Office.
9. UTILITY SHUT-DOWN: Utility interruption is required. Request must be submitted in writing to the C. O. at least 10 working days prior to proposed interruption.
10. TRAFFIC RESTRICTION
11. CRANE ERECTION / AIR TRAFFIC INTERFERENCE
12. AIRFIELD CONSTRUCTION WAIVER
13. CONSTRUCTION / MATERIAL LAYDOWN AREA
14. AS-BUILT DRAWINGS
15. MAINTENANCE MANUALS (Due not later than final inspection)
FORMCHECKBOX
Less than $25,000
FORMCHECKBOX
Between $25,000 and $100,000
FORMCHECKBOX
Between $100,000 and $250,000
FORMCHECKBOX
Between $250,000 and $500,000
FORMCHECKBOX
Between $500,000 and $1,000,000
FORMCHECKBOX
Between $1,000,000 and $5,000,000 from 07:30 to 16:30
FROM N/A
TO
FROM 07:30
TO 16:30
| G. OTHER ATTACHMENTS AS NEEDED |
| 1. 700 CONS MATERIAL SUBMITTAL FORM 66 |
2. ELECTRONIC & PAPER DRAWINGS IAW THE GENERAL STATEMENT OF NEED & TASK ORDER STATEMENT OF NEED
3. NA
Yes FORMCHECKBOX
FA5613-08-R-0001-0002
Attachment 2d