Additional information to Offerors:
1. Description of Work/Estimated Cost: This is an IDIQ MACC, Misawa Air Base, Japan. Refer to Section B for “Description of Work”, Section L, para. L-123H for “Disclosure of the Magnitude of Construction Projects”.
2. Pre-proposal conference/job site visit will be held on 20 Aug 15 at 35th Contracting Squadron conference room. See AFFARS 5352.215-9001, “Notice of Pre-Bid/Pre-Proposal Conference”, and FAR 52.236-27, “Site Visit (Construction)-Alternate I”, for more detail information.
3. Penal amount of performance bond: Refer to Section H, para. H-902, “Performance Bond”, and Section I, FAR 52.228-15, “Performance and Payment Bonds – Construction”.
This acquisition is unrestricted, no small business set aside; however, this solicitation includes clauses authorized for the purpose of construction effort in Japan: DFARS 252.225-7042 - the offeror has been duly authorized to operate and to do business in the host nation country where the contract is to be performed, and FAR 52.236-7 (modified IAW AFFARS 5336.507) - the contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any host government and political subdivisions laws, codes, and regulations applicable.
KAZUNARI SATO DSN:226-3496/COM:0176-77-3496
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Aug-2015
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________18 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______240 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
FA5205-15-R-0006 50
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.)
Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror)OFFER
FA5205-15-R-0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT
0001 1 Lot MACC Basic Year
FFP
Basic Year (one year from the date of contract award, see para. F-901(a)).
Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) is a multiple award competitive construction acquisition including design-build capability, based on the general provisions, Attachment 2 and scope of work further defined with each individual Task Order (TO). See "Description of Work" herein for the details of IDIQ MACC intended.
FOB: Destination
ESTIMATED
NET AMT ¥3,003,000,000
1001 1 Lot OPTION MACC Option Year One
FFP
Option Year One Period (for a period of one year subsequent to Basic Year completion, see para. F-901(a)).
See Item No. 0001 for item description.
2001 1 Lot OPTION MACC Option Year Two
FFP
Option Year Two Period (for a period of one year subsequent to Option Year One completion, see para. F-901(a)).
3001 1 Lot OPTION MACC Option Year Three
FFP
Option Year Three Period (for a period of one year subsequent to Option Year Two completion, see para. F-901(a)).
4001 1 Lot OPTION MACC Option Year Four
FFP
Option Year Four Period (for a period of one year subsequent to Option Year Three completion, see para. F-901(a)).
5001 1 Lot OPTION MACC Option Year Five
FFP
Option Year Five Period (for a period of one year subsequent to Option Year Four completion, see para. F-901(a)).
6001 1 Lot OPTION MACC Option Year Six
FFP
Option Year Six Period (for a period of one year subsequent to Option Year Five completion, see para. F-901(a)).
7001 1 Lot OPTION MACC Option Year Seven
FFP
Option Year Seven Period (for a period of one year subsequent to Option Year Six completion, see para. F-901(a)).
8001 1 Lot OPTION MACC Option Year Eight
FFP
Option Year Eight Period (for a period of one year subsequent to Option Year Seven completion, see para. F-901(a)).
Grand Total Estimated Amount of CLINs 0001 thru 8001: ¥27,027,000,000 (for the life of the contract)
NOTE
Each awardee will have the potential to have the maximum awarded to its company. In regard to MACC Model Project, its price proposal shall be submitted IAW Sec. L-100, para. B.2.
DESCRIPTION OF WORK
This is an IDIQ MACC for execution of a broad range of maintenance, repair and minor construction including design-build wherein work will be accomplished through issuance of task order(s) on DD Form 1155. The MACC awardees (contractors) shall provide supervision, labor, equipment, and materials necessary to accomplish a wide variety of individual construction tasks encompassing design-build, renovation, additions/upgrades, along with specific work such as, but not limited to, architectural, structural, civil, mechanical, fire protection, electrical, demolition and others for Facilities Sustainment, Restoration & Modernization (FSRM) in Misawa AB, Japan, and its associated sites, all in accordance with the General Provisions provided under this contract and the statement of work, specifications, drawings and/or sketches called for by each individual TO. The contract will include no pre-established fixed contract prices, and the work will be required in each individual TO on a firm-fixed price basis.
The contract will be effective for one-year basic year, with eight one-year options that may be exercised at the discretion of the Government, with a guaranteed minimum amount of ¥240,240 and maximum amount of ¥27,027,000,000 for the entire life of the contract. The contractor is, however, reminded that the Government will not be committed to place TO(s) up to the maximum amount of the contract during the life of the contract.
CLAUSES INCORPORATED BY FULL TEXT
B-1. CLAUSES AND PROVISIONS
(a) Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
(b) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(c) Section K, L and M will be physically removed from any resultant award, but will be deemed to be incorporated, by reference, in that award.
(End of Clause)
Section C - Descriptions and Specifications
C-1 SPECIFICATIONS, STANDARDS AND DRAWINGS
(IAW FAR 11.201)
The contractor shall furnish the services and supplies set forth in Section B in accordance with the General Provision listed in Section J, and statement of work, specifications and/or drawings called for by individual task order when issued.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
E-34. INSPECTION AND ACCEPTANCE
(IAW FAR 46.401(b) and 46.503)
Inspection and acceptance will be at the destination(s) of each project specified in individual TO.
Section F - Deliveries or Performance
52.211-13 Time Extensions SEP 2000
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (the rate(s) will be established per project, and indicated in individual TOs under the contract) for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
F-13. PLACE OF PERFORMANCE
Services under this contract are required to be performed at the following location(s):
To be designated on individual TO(s) within the locations of Misawa Air Base, Japan, and its associated sites of Draughon Range in Amagamori Area, Hachinohe Fuel Port, and Shariki Town, Aomori-prefecture, Japan
F-901. CONTRACT PERIOD/PERFORMANCE PERIOD
(a) Contract Period. Contract period will be one year from the date of contract award, with eight (8) one-year options which may be exercised at the discretion of the Government. At the time of contract award, specific dates are to be indicated below:
(1) Basic Year, from __________ to ___________.
(2) Option Year One, from _________to _________.
(3) Option Year Two, from_________ to _________.
(4) Option Year Three, from _________to _________.
(5) Option Year Four, from_________ to _________.
(6) Option Year Five, from_________ to _________.
(7) Option Year Six, from_________ to _________.
(8) Option Year Seven, from_________ to _________.
(9) Option Year Eight, from_________ to _________.
Under this contract, the ordering period stipulated in the contract clause at FAR 52.216-18, Ordering is identical with the contract period above. During such period, the work required will be ordered to the contractor by issuing a TO IAW FAR 52.216-18 and Task Order Issuance Procedures, Attachment 1.
(b) Performance Period. Performance period of each project will be specified in individual TO when issued under this contract:
(1) Construction only: For commencement of the work, the Government will issue a Notice to Proceed (NTP) to the contractor within 30 calendar days (CD) after the award date of TO, unless a period longer than 30 CD is otherwise specified in the TO. Upon receipt of the NTP, the contractor shall commence the work within the period specified in the NTP and complete all the work within the performance period set forth in the TO.
(2) Design-Build: The contractor shall commence the design work upon receipt of the TO, and complete each task within a schedule specified in the TO. For commencement of the construction work, the Government will issue a NTP to the contractor within 30 CD after the Government acceptance of the final design, unless a period longer than 30 CD is otherwise specified in the TO.
Section G - Contract Administration Data
G-1. ACCOUNTING AND APPROPRIATION DATA
(a) Accounting and appropriation data will be cited on each individual TO(s) as awarded.
(b) Guaranteed minimum amount. Upon award of the contract, TOs for obligation record of guaranteed minimum amount will be placed to each contractor. TOs for obligation record will be retained by the Government until TOs for design-build or construction projects fulfilling the guaranteed minimum amount are placed. Accounting and appropriation data for the guaranteed minimum amount is listed below.
5753400 305 7454 3A4421 010000 52495 22178F 668800 FB5205 WO:A80581
5753400 305 7454 3A4421 010000 52495 22178F 668800 FB5205 WO:A80582
5753400 305 7454 3A4421 010000 52495 22178F 668800 FB5205 WO:A80583
5753400 305 7454 3A4421 010000 52495 22178F 668800 FB5205 WO:A80584
5753400 305 7454 3A4421 010000 52495 22178F 668800 FB5205 WO:A80585
G-900 GOVERNMENT PERSONNEL
The Contracting Officer will provide to the contractor, a listing of the names of the Administrative Contracting Officer, Contract Administrator, Contracting Officer's Representative (COR), and Government Inspector(s), their organizational codes and telephone numbers at the time of award or at the pre-construction conference.
G-901. INVOICE/PAYMENT
Payment will be made by the office to be indicated in block 15 of DD Form 1155 of individual TO in accordance with FAR 52.232-5, Payments under Fixed-Price Construction Contracts, FAR 52.232-27, Prompt Payment for Construction Contracts, and DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports, after receipt of the payment request by the billing office designated in block 7 of DD Form 1155.
Section H - Special Contract Requirements
H-900. CONCILIATION
(This clause is applicable to contracts which will be performed in Japan and or executed between the United States Forces Japan, and a Japanese Contractor)
Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the United States – Japan Joint Committee for conciliation in accordance with Paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Requests by the contractor for conciliation shall be made in accordance with the following procedures:
(a) In the event the contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact with the appropriate authority in accordance with the clause of this contract entitled DISPUTES, and within the time limits described therein before filing request for conciliation with the Joint Committee and then request the appellate authority under the clause of this contract entitled DISPUTES, to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(b) The request for conciliation will be submitted by the contractor through the nearest local Japanese Defense Facilities Bureau, to the Contract Conciliation panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(c) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the contractor to notify the appellate authority designated in the clause of this contract entitled DISPUTES, of the settlement of the dispute and to withdraw his appeal.
(d) In the event the contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding tendency of this request for conciliation, that action by the appropriate authority under the clause of this contract entitled DISPUTES, be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the contractor of this action taken hereunder.
(e) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled DISPUTES, has been rendered.
Pending the hearing of conciliation panel the contractor shall proceed diligently with the decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
H-901. REQUIRED INSURANCE
(This paragraph applies only when contractor’s owned vehicles are being operated on Misawa Air Base)
(a) The contractor shall procure and maintain during the entire period of his/her performance under this contract, the following minimum vehicle insurance:
Property Damage – ¥2,000,000
(b) Prior to the commencement of work hereunder, the contractor shall furnish to the Contracting officer a certificate or written statement of the above required insurance. The contractor is required to notify the Contracting Officer immediately upon cancellation or of any material change in the policies adversely affecting the interests of the Government.
(c) The contractor agrees to insert the substance of this clause including this paragraph c, in all subcontracts hereunder.
H-902. PERFORMANCE BOND
(a) This is a TO based IDIQ contract under which the contractor is required to submit an executed performance bond on the basis of individual TO payable to the contractor.
(b) Upon receipt of individual TO that its construction value exceeds $150,000.00 or equivalent Japanese Yen amount, the contractor shall furnish a performance bond to the Contracting Officer as follows:
(i) Within 30 CD after the TO receipt date by the contractor for construction only project, and after acceptance of the final design by the Government for design-build project, unless otherwise a period longer than 30 CD is specified in the TO; and
(ii) In a penal sum of performance bond equal to100 percent of the construction value at the TO award amount, properly executed on Standard Form 25.
For the purpose of conversion from Japanese Yen amount to U.S. Dollar, respective fiscal years' Foreign Currency Fluctuation Defense (FCFD) budget rate will be announced to the contractors in the beginning of respective fiscal year.
(c) Additional performance bond shall be required when the TO construction value is increased by more than $10,000.00 or equivalent Japanese Yen amount as indicated in the TO modification. The contractor shall furnish an executed additional performance bond to the Contracting Officer, in a penal sum equal to the increase of the construction value, within the period specified in the TO modification or the Contracting Officer's letter otherwise issued.
(d) Penal sum of bond shall be filled in Japanese Yen in line with the resultant Japanese Yen based TO construction value. Penal sum of bond indicated in U.S. Dollar will be conditionally acceptable, if the dollar penal sum is equivalent to the yen-based construction value as converted by use of the exchange rate at the time of the bond execution and such bond is accompanied by the surety’s separate certification ensuring that the U.S. Dollars indicated in the bond shall be adjusted to the amount equivalent to the yen-based construction value in line with the exchange rate fluctuation.
(e) Failure by the contractor to submit the performance bond above may constitute actionable grounds to invoke termination action pursuant to Section I, Contract clause, FAR 52.249-10 entitled "Default (Fixed-Price Construction)".
Section I - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.215-2 Audit and Records--Negotiation OCT 2010 52.222-50 Combating Trafficking in Persons MAR 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.228-2 Additional Bond Security OCT 1997 52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-23 Responsibility of the Architect-Engineer Contractor APR 1984 52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items APR 2015 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2010 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)
(Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding of Unclassified Controlled Technical Information NOV 2013 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
DEC 2014
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7041 Correspondence in English JUN 1997 252.227-7032 Rights In Technical Data And Computer Software (Foreign) JUN 1975 252.227-7033 Rights in Shop Drawings APR 1966 252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012
252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within see para. F-901(b) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the period or date set forth in each individual TO. The time stated for completion shall include final cleanup of the premises.
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from * see below through * see below.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
* Identical with the period specified in para. F-901(a).
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than *¥240,240, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of ¥1,141,140,000;
(2) Any order for a combination of items in excess of ¥1,141,140,000; or
(3) A series of orders from the same ordering office within five (5) business days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within three (3) business days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(*or equivalent dollar amount converted by use of respective fiscal years' Foreign Currency Fluctuation Defense (FCFD) budget rate for Japanese Yen)
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the delivery date shown in each TO.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor no later than fifteen (15) days prior to expiration of contract period; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least sixty (60) days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed nine
(9) years.
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
Material Identification No.
(If none, insert "None")
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items.
Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (OCT 2010), is modified to reflect the Contracting Officer’s waiver of requirement for payment bonds and sureties appearing on Treasury Department Circular 570 which was made in accordance with
FAR 28.102-1(a)(1) and FAR 28.202(b), as follows.
1. The words of "and payment" are deleted from the words of "performance and payment" at the clause title, para.
(b), and para. (b)(3)(i), respectively. In addition, para. (b)(2) and (e) are deleted from the clause in their entirety.
2. The words of “, or sureties authorized for issuance of the performance bond by the Financial Service Agency, the Government of Japan” are added at the end of 1st sentence in para. (d).
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twelve (12) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-7 PERMITS AND RESPONSIBILITIES, is modified as follows, in accordance with AFFARS
5336.507:
The first sentence in the clause at FAR 52.236-7 is modified to reflect “host government and political subdivisions” in lieu of “Federal, State, and Municipal”.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Name of Website - United States Air Force FAR Site. URL: http://farsite.hill.af.mil
52.252-4 ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
None.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS
OUTSIDE THE UNITED STATES (JUN 2015)
(a) Definition. "United States", as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from the appropriate Antiterrorism/Force Protection Office at the Command Headquarters. Also see https://atep.dtic.mil. For additional information: Assistant Secretary of Defense for Special Operations and Low Intensity Conflict, ASD (SOLIC); telephone, DSN 227-7205 or commercial (703) 697-7205.
252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE
AGREEMENTS--BASIC (NOV 2014)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that---
(i) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item--
(i) Means any item of supply (including construction material) that is--
(A) A commercial item (as defined in paragraph (1) of the definition of ``commercial item'' in section 2.101 of the Federal Acquisition Regulation);
(B) Sold in substantial quantities in the commercial marketplace; and
(C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(ii) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. 40102), such as agricultural products and petroleum products.
Component means any article, material, or supply incorporated directly into construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--https://atep.dtic.mil/
(i) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(ii) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means--
(i) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan (known in the World Trade Organization as ``the Separate Customs Territory of Taiwan, Penghu, Kinmen, and Matsu'' (Chinese Taipei)), or the United Kingdom);
(ii) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Panama, Peru, or Singapore);
(iii) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(iv) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, a Free Trade Agreement country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if--
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(B) The construction material is a COTS item.
Free Trade Agreement country construction material means a construction material that--
(i) Is wholly the growth, product, or manufacture of a Free Trade Agreement country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Free Trade Agreement country into a new and different construction material distinct from the material from which it was transformed.
Least developed country construction material means a construction material that--
(i) Is wholly the growth, product, or manufacture of a least developed country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that--
(i) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(ii) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) This clause implements the Balance of Payments Program by providing a preference for domestic construction material. In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements apply to this acquisition. Therefore, the Balance of Payments Program restrictions are waived for designated country construction materials.
(c) The Contractor shall use only domestic or designated country construction material in performing this contract, except for--
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation;
(2) Information technology that is a commercial item; or
(3) The construction material or components listed by the Government as follows:
None.
252.229-7001 TAX RELIEF (SEPT 2014)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:
NAME OF TAX: See para. K-800 in Section K for fill in RATE (PERCENTAGE): Same as above
(b) The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission.