Atch4_Price_Proposal.pdf
PDF 20 KB Posted
- Solicitation number
- FA5205-15-R-0006
About this file
RFP Atch4
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 to RFP No. FA5205-15-R-0006
PRICE PROPOSAL
FOR
MACC MODEL PROJECT
RFP NO. FA5205-15-R-0006
Project No.: QKKA 11-1193 Title: CNST ADDN JTAGS Facility B1751, Misawa AB, Japan Project Type: Design-Build, Partial Design
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT
0001 1 Lot MACC Model Project
Unspecified Minor Military Construction (UMMC) – Operation and Maintenance (O&M). Provide all work to accomplish subject project IAW the Statement of Work (SOW), Attachment 3 of the solicitation.
Design Fee: ¥ A Design Other Cost: ¥ B Construction Cost:
- Civil Work: ¥ C
- Architectural/Temporary Work: ¥ D
- Mechanical Work: ¥ E
- Electrical Work: ¥ F
NET AMOUNT (Total of A thru F) ¥
Statutory Cost Limitation (SCL): UMMC – O&M is subject to SCL of $1,000,000 (¥120,120,000 at FY15 exchange rate of ¥120.12 to $1.00) IAW DFARS 252.236-7006, Cost Limitation, Section L of Solicitation. Amount of UMMC – O&M shall not exceed the said SCL.
Performance Period:
• Design - Total 148 calendar days after placement of Task Order (refer to para. 4.0 of the SOW)
• Construction - Estimated 370 calendar days (CD) after receipt of Notice to Proceed for construction work. Actual construction period will be established at the design stage based upon agreement by both parties.
Liquidated Damages (LD): If the contractor fails to complete the work within the time specified in the task order, the contractor shall pay LD to the Government in the amount of ¥37,151+¥29,189 for the first calendar day of delay and ¥37,151 for each additional calendar day of delay and thereafter until the work is completed or accepted IAW FAR 52.211-12, Liquidated Damages – Construction, Section F.
Acceptance Period of Proposal: 240 CD after the date of receipt of the proposals (refer to block 13.D of Standard Form1442). Funds are not presently available for this project (refer to Section L, para.
L-100.B.2.(a)).
Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)
Company Name and Address
File details come from the government source that posted it. Updated .