RFP No. FA5205-15-R-0006

Attachment 7

HISTORICAL DATA

List of Task Orders (TOs) issued under Current IDIQ MACCs for 5 Years

Project Title Project Type (Ktr Design %) TO Amount Repair Lightning Protection System, B1495 Design-Build (100% Design) ¥24,540,000 REPR Water Line Design-Build (100% Design) ¥11,016,000 REPR Health Deficiencies Design-Build (100% Design) ¥3,315,000 Replace Ground Floor Air Conditioning Unit, B928

Design-Build (100% Design) ¥48,900,000

Repair AC System, BX Bldg. 325, Ph-3 Design-Build (100% Design) ¥82,495,000 Replace Apron Tower Light Design-Build (100% Design) ¥81,000,000 JTAG - Upgrade Antenna Pads, B1751 Design-Build (35% Design) ¥10,124,000 ENERGY CONS, Digital Controls and VFD Design-Build (100% Design) ¥390,000,000 ENERGY CONS, HAS Energy Improvement, Ph-3

Design-Build (10% Design) ¥164,200,000

ENERGY CONS, Lighting Retrofit Design-Build (100% Design) ¥115,460,160 ENEGY CONS, Efficiency Improvements Design-Build (100% Design) ¥77,500,000 ENERGY CONS, Time-of-Day, Digital Controls Design-Build (100% Design) ¥35,167,200 Repair Electrical, B627 Construction Only ¥8,750,000 IMPR Steam Line, Housing, Ph-5 Design-Build (100% Design) ¥198,546,600 IMPR Steam Line, Housing, Ph-2 Design-Build (100% Design) ¥85,438,100 IMPR Steam Line, Housing, Ph-3 Design-Build (100% Design) ¥192,405,450 Install Comm Rack & Power Line in 23 Various Locations in HAS

Construction Only ¥10,930,000

IMPR Steam Line, Housing, Ph 1 Design-Build (100% Design) ¥259,754,350 REPR H-Frame Transformer Safety Deficiencies Construction Only ¥15,290,000 Repair Diesel Fuel Tanks, Various Lift Stations Design-Build (10% Design) ¥16,800,000 UPGD Fire Detectors, Dorms Construction Only ¥17,000,000 Repair Cathodic Protection, B99 Design-Build (65% Design) ¥10,980,000 Add/Alter HAS Drain to Industrial Waste Water Pl

Construction Only ¥32,683,000

REPR Earthquake Damage to Steam Sys HAS Area

Design-Build (65% Design) ¥129,800,000

REPR Sub-Basement, Hospital B99 Design-Build (100% Design) ¥7,550,000 REPR Main Gate, B319 Design-Build (35% Design) ¥24,770,000 Repair Cathodic Protection System, Basewide Design-Build (65% Design) ¥8,300,000 UPGD Forced Sewer Line Design-Build (35% Design) ¥97,060,000 REPR Wastewater Line Main Base MFH area Design-Build (35% Design) ¥32,000,000 HAS Energy Improvements, Ph-4 Design-Build (35% Design) ¥199,600,000 REPL Exhaust Stack, Main Heat Plant B465 Design-Build (65% Design) ¥92,420,000 REPR HVAC Controls, TORII B655 Construction Only ¥89,950,000 RPLC Water Plant Operation System B1362 Design-Build (70% Design) ¥133,639,388 Building Envelope Improvements Design-Build (35% Design) ¥68,520,000

Attachment 7

Project Title Project Type (Ktr Design %) TO Amount Building 911 Facility Energy Improvements Design-Build (35% Design) ¥17,200,000 REPR Earthquake Damage Basewide Minor Cracks

Design-Build (10% Design) ¥30,737,820

REPR Earthquake Structural Damage Basewide Design-Build (10% Design) ¥33,070,850 REPR Airfield Lighting System, Ph 1 Construction Only ¥248,419,438 REPR Lift Stations, B222, B3203, B3260 and B3320

Design-Build (40% Design) ¥41,300,000

Install Backflow Preventers, Various Design-Build (35% Design) ¥67,200,910 Repair Cathodic Protection, Basewide Design-Build (35% Design) ¥12,340,000 REPR Wells North #3/#4 Design-Build (35% Design) ¥42,600,000 RPLC Overhead Electrical Power Lines with Underground, B746

Design-Build (35% Design) ¥39,600,000

Rplc Elevators B1937 Design-Build (35% Design) ¥107,264,100 Rplc Elevators B1938 Design-Build (35% Design) ¥105,865,000 Rplc Elevators B117 Design-Build (35% Design) ¥107,154,160 Rplc Elevators B1939 Design-Build (35% Design) ¥105,865,000 Rplc Elevators B220 Design-Build (35% Design) ¥107,924,160 REPR Fire Deficiencies, Theater B556 Design-Build (10% Design) ¥69,120,000 REPR Chiller Units, B1525 Construction Only ¥20,991,000 CNST Exterior Storage, MFH, Phase 4 Design-Build (35% Design) ¥35,300,000 CNST Exterior Storage, MFH, Phase 5 Design-Build (35% Design) ¥39,570,000 CNST Exterior Storage, MFH, Phase 6 Design-Build (35% Design) ¥20,850,000 CNST Exterior Storage, MFH, Phase 7 Design-Build (35% Design) ¥44,070,000 INST Covered Parking, MFH, Area #2 Design-Build (35% Design) ¥52,993,344 INST Covered Parking, MFH, Area #3 Design-Build (35% Design) ¥44,779,897 INST Covered Parking, MFH, Area #4 Design-Build (35% Design) ¥48,432,498 INST Covered Parking, MFH, Area #1 Design-Build (35% Design) ¥26,112,764 Repair Security Fence, Draughon Range Design-Build (20% Design) ¥17,300,000 Repair Paint Hangar Ventilation B3130 Design-Build (35% Design) ¥10,780,000 Rplc Elevators B231 Design-Build (35% Design) ¥106,324,000 Rplc Elevators B212 Design-Build (35% Design) ¥106,324,000 Rplc Elevators B214 Design-Build (35% Design) ¥106,324,000 INST Covered Parking, Main Base MFH Area #7 Design-Build (35% Design) ¥35,879,240 INST Covered Parking, Main Base MFH Area #9 Design-Build (35% Design) ¥49,959,504 Replace Transformer and Fuel Tank, B939 Design-Build (35% Design) ¥52,000,000 INST Covered Parking North MFH AREA #10 Design-Build (35% Design) ¥47,700,000 INST Covered Parking North MFH AREA #15 Design-Build (35% Design) ¥45,850,000 INST Covered Parking Main Base MFH Area #25

Design-Build (35% Design) ¥38,020,000

INST Covered Parking Main Base MFH Area #12 (56 unit)

Design-Build (35% Design) ¥48,700,000

INST Covered Parking North MFH Area #21 (48 units)

Design-Build (35% Design) ¥43,500,000

Attachment 7

Project Title Project Type (Ktr Design %) TO Amount INST Covered Parking North MFH Area #23 (44 units)

Design-Build (35% Design) ¥40,700,000

INST Covered Parking Main Base MFH Area #5 (60 unit)

Design-Build (35% Design) ¥52,800,000

INST Covered Parking Main Base MFH Area #6 (60 unit)

Design-Build (35% Design) ¥51,100,000

INST Covered Parking Main Base MFH Area #8 (52 unit)

Design-Build (35% Design) ¥44,600,000

INST Covered Parking Main Base MFH Area #14 (44 unit)

Design-Build (35% Design) ¥40,500,000

INST Covered Parking Main Base MFH Area #11 (52 Units)

Design-Build (35% Design) ¥45,100,000

INST Covered Parking North MFH Area #25 (56 units)

Design-Build (35% Design) ¥47,710,000

INST Covered Parking Main Base MFH Area #16 (28 units)

Design-Build (35% Design) ¥27,700,000

REPR Playgrounds at CDC, Facility 10 Design-Build (35% Design) ¥30,920,400 REPR Existing Community Park #75105 Design-Build (35% Design) ¥22,755,600 INST Covered Parking North MFH Area #17 (32 units)

Design-Build (35% Design) ¥26,800,000

INST Covered Parking North MFH Area #18 (32 units)

Design-Build (35% Design) ¥28,900,000

INST Covered Parking North MFH Area #20 (32 units)

Design-Build (35% Design) ¥31,000,000

INST Covered Parking North MFH Area #22 (32 units)

Design-Build (35% Design) ¥30,800,000

UPGD Industrial WWTP, Bldg. 1386 Design-Build (35% Design) ¥10,700,000 RPLC Steam Pipe Line around B1334 Design-Build (35% Design) ¥449,800,000 Energy Management Control System (EMCS) Design-Build (10% Design) ¥184,500,000 Demolition of FLR-9 Antenna and Associated Structures

Construction Only ¥491,678,968

REPR Playground, Main Base MFH F#75051 (196)(40 Units) Ph. 1

Design-Build (35% Design) ¥31,172,000

REPR Playground, Main Base MFH F#75083 (237)(40 Units)

Design-Build (35% Design) ¥23,948,000

REPR Playground, North MFH F#75075 (1929)(40 Units)

Design-Build (35% Design) ¥22,361,000

REPR Playground, North MFH F#75108 (1813)(40 Units)

Design-Build (35% Design) ¥24,387,000

REPR Playground, Main Base MFH F75050 (338)(40 Units)

Design-Build (35% Design) ¥25,198,000

REPR Playground, North MFH F#75086 (1885)(40 Units)

Design-Build (35% Design) ¥16,347,000

MNTN Dredging Base Beach Construction Only ¥56,000,000 RPLC Road Heating System, B99 Design-Build (65% Design) ¥139,000,000 INST Fiber Lines, Main Base MFH Design-Build (35% Design) ¥50,450,000 INST Fiber Lines, North MFH Design-Build (35% Design) ¥84,500,000

Attachment 7

Project Title Project Type (Ktr Design %) TO Amount REPR Main Base Well No. 5 Design-Build (35% Design) ¥21,250,000 REPR Main Base Well No. 6 Design-Build (35% Design) ¥19,920,000 REPR Main Base Well No. 1 Design-Build (35% Design) ¥51,520,000 INST EMCS, HASs and Boiler Plant, B1337 Design-Build (10% Design) ¥196,500,000

Summary of TOs

Nr of TOs Total Amount

Aggregate (Total 5 Years) 103 ¥7,373,943,901 Average Per Year 20.6 ¥1,474,788,780

Per Price Range of TO Amounts Nr of TOs Total Amount Up to ¥9,999,999 4 ¥27,915,000 ¥10,000,000 thru ¥49,999,999 58 ¥1,737,612,773 ¥50,000,000 thru ¥99,999,999 18 ¥1,262,067,354 ¥100,000,000 thru ¥199,999,999 18 ¥2,506,696,018 ¥200,000,000 thru ¥299,999,999 2 ¥508,173,788 ¥300,000,000 thru ¥399,999,999 1 ¥390,000,000 ¥400,000,000 thru ¥499,999,999 2 ¥941,478,968

Per Project Type Nr of TOs Total Amount Design-Build 93 ¥6,382,251,495 Construction Only 10 ¥991,692,406